PERSPECTIVE 1
PERSPECTIVE 2
TV PARTITION
DATE : 04092023
Project Drawing Title Drawing No. Ind. Revision note Date R1
R2 R3
Scale Drawn Date Purpose of Drawing R4
© THIS DRAWING
IS COPYRIGHT Contractors shall work from figured dimensions only. Contractors must check all dimensions on site. Discrepancies must be reported immediately to the architects.
Client NOTE :
TV PARTITION 01/011/DPS/2023
DAMA 04 SEPTEMBER 2023
(A3) 1:10
GENERAL LAYOUT PLAN
DESIGN INTENT
001 01 GENERAL LAYOUT PLAN
Project Drawing Title Drawing No. Ind. Revision note Date R1
R2 R3
Scale Drawn Date Purpose of Drawing R4
© THIS DRAWING
IS COPYRIGHT Contractors shall work from figured dimensions only. Contractors must check all dimensions on site. Discrepancies must be reported immediately to the architects.
Client NOTE :
TV PARTITION 01/012/DPS/2023
DAMA 04 SEPTEMBER 2023
(A3) 1:20
ELEVATION 1 & ELEVATION 2
DESIGN INTENT
012 01 ELEVATION 1
012 02 ELEVATION 2
Project Drawing Title Drawing No. Ind. Revision note Date R1
R2 R3
Scale Drawn Date Purpose of Drawing R4
© THIS DRAWING
IS COPYRIGHT Contractors shall work from figured dimensions only. Contractors must check all dimensions on site. Discrepancies must be reported immediately to the architects.