The Identification of Waste Construction at Construction
Project Life Cycle
by Mochamad Agung Wibowo
Submission date: 13-Jun-2022 11:58PM (UTC+0700) Submission ID: 1856158092
File name: Fullpaper.pdf (161.55K) Word count: 2232
Character count: 12599
1 1
1 2
5 6 9
10
11
3
4
6
7
8 12
13
11
%SIMILARITY INDEX
4
%INTERNET SOURCES
4
%PUBLICATIONS
5
%STUDENT PAPERS
1
2
%2
1
%3
1
%4
1
%5
1
%6
1
%7
1
%The Identification of Waste Construction at Construction Project Life Cycle
ORIGINALITY REPORT
PRIMARY SOURCES
doaj.org
Internet Source
Submitted to American Public University System
Student Paper
Submitted to University of Malaya
Student Paper
Submitted to University of Florida
Student Paper
Submitted to College of Estate Management
Student Paper
Tássia Farssura Lima da Silva. "BIM and risk management interface in the design phase: a multi-method approach.", Universidade de Sao Paulo, Agencia USP de Gestao da
Informacao Academica (AGUIA), 2022
Publication
Submitted to Hochschule Bremen
Student Paper
8
1
%9
1
%10
< 1
%11
< 1
%12
< 1
%13
< 1
%Exclude quotes Off Exclude bibliography On
Exclude matches Off
theses.gla.ac.uk
Internet Source
www.pubfacts.com
Internet Source
studentsrepo.um.edu.my
Internet Source
Wibowo, Mochamad Agung, and Rudi Waluyo.
"Knowledge Management Maturity in Construction Companies", Procedia Engineering, 2015.
Publication
eprints.uthm.edu.my
Internet Source
Claude Benser, Brian Hobbs. "The Initiation Phase of Projects in Practice : a survey
investigation", Journal of the Society of Project Management, 2007
Publication
FINAL GRADE
/0
The Identification of Waste Construction at Construction Project Life Cycle
GRADEMARK REPORT
GENERAL COMMENTS
Instructor
PAGE 1 PAGE 2 PAGE 3