• Tidak ada hasil yang ditemukan

Tourism Facility Planning and Budget Overview

N/A
N/A
Aa Kusmara

Academic year: 2025

Membagikan "Tourism Facility Planning and Budget Overview"

Copied!
3
0
0

Teks penuh

(1)

No. DIMENSI

1 3 5

A TERASSERRING I

I PERSIAPAN

1 PEK. PLOTTING ZONASI 1 Ls Rp. 20.000.000,00

2 PEK. MARKING, CUT & FILL 1 Ls Rp. 30.000.000,00

Rp. 50.000.000,00 II FASILITAS WISATA

1 PEK. STALL COFFEE SHOP & RESTO & BARBEQUE SPOT 2.5 x 4 m 1 Unit Rp. 85.176.389,90

2 PEK. GUDANG 1 2 x 3 x 2 m 1 Unit Rp. 52.455.312,78

3 PEK. BALE RIUNG INDOOR, 2 LANTAI - ATAS BALE BENGONG 4 x 12 m 2 Unit Rp. 309.424.163,24

4 PEK. BALE RIUNG OUTDOOR KAV 1 3.5 x 5 m 1 Unit Rp. 39.771.252,24

5 PEK. BALE RIUNG OUTDOOR KAV 2 3.5 x 3,5 m 1 Unit Rp. 35.960.896,23

6 PEK. BALE RIUNG OUTDOOR KAV 3 3.5 x 5 m 1 Unit Rp. 39.771.252,24

7 PEK. BALE RIUNG OUTDOOR KAV 4 3 x 9,5 m 1 Unit Rp. 56.270.330,89

8 PEK. BALE RIUNG OUTDOOR KAV 5 2.5 x 12 m 1 Unit Rp. 46.781.822,64

9 PEK. IMAH LEUIT (TOILET DIDALAM) 4 x 6 m 1 Unit Rp. 187.744.899,77

Rp. 853.356.319,92 III FASILITAS UMUM DI TERASERRING I

1 PEK. RAMBU RAMBU PETUNJUK JALAN/ARAH 10 bh Rp. 2.500.000,00

2 PEK. PARKIRAN 20 x 30 m 1 Unit Rp. 228.366.158,15

3 PEK. POS JAGA/MANAJEMEN 3 x 4 m 2 lantai Rp. 121.628.076,89

4 PEK. GERBANG MASUK 2 x 1,2 m 1 Unit Rp. 27.363.335,06

5 PEK. POS TIKET MASUK 1,5 x 2 m 1 Unit Rp. 42.973.717,14

6 PEK. JARINGAN LISTRIK & LAMPU 1 Ls Rp. 19.000.000,00

7 PEK. JARINGAN SALURAN AIR BERSIH 1 Ls Rp. 20.900.000,00

8 PEK. JARINGAN SALURAN AIR KOTOR 1 Ls Rp. 23.750.000,00

9 PEK. TAMAN 1750 m2 1 Ls Rp. 35.000.000,00

10 PEK. PENGADAAN TEMPAT SAMPAH LORI 60 Liter 4 Unit Rp. 7.400.000,00

11 PEK. ASESORIES TAMAN, JALAN, PAJANGAN 25 bh Rp. 14.375.000,00

12 PEK. TEMBOK PAGAR LUAR 90 m2 Rp. 79.441.700,10

Rp. 622.697.987,34 Rp. 1.526.054.307,25 4

JUMLAH HARGA SELURUH PEKERJAAN

JUMLAH A

KABUPATEN : SUKABUMI

JUMLAH I

JUMLAH II

JUMLAH III

VOLUME

REKAPITULASI BIAYA

PEKERJAAN : PEMBANGUNAN GUNUNG CABE ECOTOURISM & ADVENTURE SPORT DESA : CIMAJA

PROVINSI : JAWA BARAT KECAMATAN : CIKAKAK

URAIAN PEKERJAAN

2

(2)

No. DIMENSI

1 3 4 5

JUMLAH HARGA SELURUH PEKERJAAN

KABUPATEN : SUKABUMI

VOLUME

REKAPITULASI BIAYA

PEKERJAAN : PEMBANGUNAN GUNUNG CABE ECOTOURISM & ADVENTURE SPORT DESA : CIMAJA

PROVINSI : JAWA BARAT KECAMATAN : CIKAKAK

URAIAN PEKERJAAN

2

B TERASSERRING II

I KOLAM RENANG BERIKUT FASILITASNYA

1 PEK. KOLAM RENANG ANAK/BALITA 3 x 5 x 0,3 m 1 Unit Rp. 102.627.604,60

2 PEK. KOLAM RENANG REMAJA 8 x 10 x 1,3 m 1 Unit Rp. 444.808.711,36

3 PEK. KOLAM RENANG DEWASA 8 x 10 x 2 m 1 Unit Rp. 521.795.766,08

4 PEK. HALAMAN AREA KOLAM 64 m2 1 Unit Rp. 41.628.491,91

5 PEK. KAMAR GANTI 1 x 2 m 3 Unit Rp. 39.146.305,15

6 PEK. RUANG BILAS TERBUKA 3 x 2 m 3 Unit Rp. 30.093.817,06

7 PEK. LOCKER 1,5 x 2 m 1 Unit Rp. 2.500.000,00

8 PEK. GUDANG 2 2 x 3 m 1 Unit Rp. 52.909.357,28

9 PEK. TORN & RANGKA TORN 2 x 1000 ltr 2 unit Rp. 21.659.800,00

10 PEK. TOILET 0,8 x 2 m 3 Unit Rp. 59.340.732,09

11 PEK. SEPTICTANK 2 x 1,5 x 2 m 2 Unit Rp. 24.509.800,00

12 PEK. GEROBAK JAJANAN 0,9 x 1,5 x 0,8 m 2 Unit Rp. 9.000.000,00

13 PEK. BAK PENAMPUNG & FILTERISSASI AIR BERSIH 4 x 3 x 1,5 m 2 Unit Rp. 286.645.466,06 Rp. 1.636.665.851,57 II FASILITAS WISATA

1 PEK. IMAH LEUIT 4 x 6 m 2 Unit Rp. 375.489.799,53

2 PEK. BALE BENGONG OUTDOOR ( PANGGUNG ) 4 x 14 m 1 Unit Rp. 108.923.916,61 2 PEK. BALE BENGONG OUTDOOR ( RUMPUT ) 4 x 14 m 1 Unit Rp. 48.638.067,55 Rp. 533.051.783,69 III FASILITAS UMUM DI TERASERRING 2

1 PEK. RAMBU RAMBU PETUNJUK JALAN/ARAH 10 Unit Rp. 2.500.000,00

2 PEK. MUSHOLA DAN TEMPAT WUDHU 3 x 4 m 1 Unit Rp. 118.992.873,64

3 PEK. KLINIK 2 x 2 m 1 Unit Rp. 40.444.171,10

4 PEK. JALAN SETAPAK 73 x 1,2 m Rp. 47.432.043,88

5 PEK. JARINGAN LISTRIK & LAMPU 1 Ls Rp. 14.600.000,00

6 PEK. JARINGAN SALURAN AIR BERSIH 1 Ls Rp. 16.060.000,00

7 PEK. JARINGAN SALURAN AIR KOTOR 1 Ls Rp. 18.250.000,00

8 PEK. TAMAN 1425 m2 Rp. 28.500.000,00

9 PEK. PENGADAAN TEMPAT SAMPAH LORI 60 Liter 4 Unit Rp. 7.400.000,00

10 PEK. ASESORIES TAMAN, JALAN, PAJANGAN 25 bh Rp. 24.375.000,00

11 PEK. TEMBOK PAGAR LUAR 90 m2 Rp. 79.441.700,10

Rp. 397.995.788,71 Rp. 2.567.713.423,97 JUMLAH I

JUMLAH II

JUMLAH III JUMLAH B

(3)

No. DIMENSI

1 3 4 5

JUMLAH HARGA SELURUH PEKERJAAN

KABUPATEN : SUKABUMI

VOLUME

REKAPITULASI BIAYA

PEKERJAAN : PEMBANGUNAN GUNUNG CABE ECOTOURISM & ADVENTURE SPORT DESA : CIMAJA

PROVINSI : JAWA BARAT KECAMATAN : CIKAKAK

URAIAN PEKERJAAN

2

C TERASSERRING III

I FASILITAS WISATA

1 PEK. BALE BALE BENGONG 4 x 14 m 1 Unit Rp. 108.923.916,61

2 PEK. TREE HOUSE 1,5 x 2 m 5 Unit Rp. 94.713.520,00

3 PEK. CAMPING GROUND 1,5 x 2 m 5 Unit Rp. 56.882.770,00

Rp. 260.520.206,61 II FASILITAS UMUM DI TERASERRING III

1 PEK. RAMBU RAMBU PETUNJUK JALAN/ARAH 10 Unit Rp. 2.500.000,00

2 PEK. HURUF TIMBUL IDENTITAS KAWASAN 10 Huruf Rp. 154.445.426,98

3 PEK. JALAN SETAPAK 125 x 1,2 m Rp. 76.907.609,38

4 PEK. JARINGAN LISTRIK & LAMPU 1 Ls Rp. 25.000.000,00

5 PEK. JARINGAN SALURAN AIR BERSIH 1 Ls Rp. 17.500.000,00

6 PEK. JARINGAN SALURAN AIR KOTOR 1 Ls Rp. 21.000.000,00

7 PEK. TAMAN 1892 m2 Rp. 37.840.000,00

8 PEK. PENGADAAN TEMPAT SAMPAH LORI 60 Liter 4 Unit Rp. 7.400.000,00

9 PEK. ASESORIES TAMAN, JALAN, PAJANGAN 15 bh Rp. 14.625.000,00

10 PEK. PAGAR LUAR 90 m2 Rp. 79.441.700,10

11 PEK. PAPAN INFORMASI POHON 50 bh Rp. 17.500.000,00

Rp. 454.159.736,45 III PENGUATAN KAPASITAS & LAUNCHING

1 PELATIHAN BUMDES UNTUK PENGELOLAAN KAWASAN WISATA 2 kali Rp. 150.000.000,00

2 LAUNCHING KAWASAN WISATA SKALA NASIONAL 1 Ls Rp. 50.000.000,00

Rp. 200.000.000,00 Rp. 914.679.943,06 Rp. 5.008.447.674,28 Rp. 350.591.337,20

JUMLAH TOTAL Rp. 5.359.039.011,48

Cimaja, 20 Oktober 2021 JUMLAH A + B + C

JUMLAH II

BIAYA PERENCANAAN JUMLAH III

Team Perencana Kawasan Wisata Edukasi JUMLAH I

JUMLAH C

Team Leader

Lima Milyar Tiga Ratus Lima Puluh Sembilan Juta Tiga Puluh Sembilan Ribu Sebelas Rupiah Tiga Puluh Tujuh Sen

Dibuat Oleh :

KUSMARA, ST

Referensi

Dokumen terkait

Stakeholders related to the Gandoriah-Sunur Beach Tourism Destination Development Program No Activity Implementer 1 Maintenance of Facilities and Infrastructure Tourism and

Serkolinas Aman Nusantara Indonesia, budget planning is very important, based on the information above, budget planning can be used as a tool in motivating organizational members to

Conclusion Following the evaluation of capital budget planning process among contractors, the study shows that one of the most important planning process is the horizon of contractor’s

MARKET PLANNING/ENGINEERING SOCIOECONOMIC LEGAL/BUSINESS Tourist attractions Infrastructure Local attitudes Private/public/nonprofit attitudes Tourist facilities

Environmental and Social Considerations In case of Technical Cooperation Project ( including SATREPS ) / Technical Cooperation for Development Planning, please fill in the attached

31 Infrastructure L1 The development of tourism infrastructure and facilities 0.029 L2 Enhance the development accessibility to halal tourism destinations and attractions 0.033 L3

7 yang telah diuraikan, berkaitan dengan pengaruh budget dengan planning budget model dan dampaknya pada kinerja UMKM/manajerial, penulis dapat membuat kesimpulan, bahwa indikator

The document contains technical data related to bridge planning and design, including cross-sectional views, elevations, and distances, potentially for a project near Malinjak and