Semester Ganjil
Potongan TOTAL Potongan TOTAL Potongan TOTAL
1 Teknik Elektro 2,500,000 4,600,000 20 sks 350,000 7,450,000 10,000,000 17,450,000 2,500,000 14,950,000 1,250,000 16,200,000 625,000 16,825,000 2 Teknik Kimia 2,500,000 5,060,000 22 sks 230,000 7,790,000 12,500,000 20,290,000 2,500,000 17,790,000 1,250,000 19,040,000 625,000 19,665,000 3 Informatika 2,500,000 4,600,000 20 sks 230,000 7,330,000 12,500,000 19,830,000 2,500,000 17,330,000 1,250,000 18,580,000 625,000 19,205,000 4 Sistem Informasi 2,500,000 4,600,000 20 sks 0 7,100,000 10,000,000 17,100,000 2,500,000 14,600,000 1,250,000 15,850,000 625,000 16,475,000 5 Teknik Geodesi 2,500,000 4,370,000 19 sks 135,000 7,005,000 12,500,000 19,505,000 2,500,000 17,005,000 1,250,000 18,255,000- 625,000 18,880,000-
Potongan TOTAL Potongan TOTAL Potongan TOTAL
6 Teknik Mesin 2,500,000 5,000,000 20 sks 0 7,500,000 15,000,000 22,500,000 2,500,000 20,000,000 1,250,000 21,250,000 625,000 21,875,000 7 Teknik Industri 2,500,000 5,000,000 20 sks 250,000 7,750,000 15,000,000 22,750,000 2,500,000 20,250,000 1,250,000 21,500,000 625,000 22,125,000 8 Teknik Sipil 2,500,000 5,000,000 20 sks 220,000 7,720,000 15,000,000 22,720,000 2,500,000 20,220,000 1,250,000 21,470,000 625,000 22,095,000 9 Perencanaan Wilayah & Kota 2,500,000 4,750,000 19 sks 150,000 7,400,000 12,500,000 19,900,000 2,500,000 17,400,000 1,250,000 18,650,000 625,000 19,275,000 10 Teknik Lingkungan 2,500,000 5,000,000 20 sks 870,000 8,370,000 15,000,000 23,370,000 2,500,000 20,870,000 1,250,000 22,120,000 625,000 22,745,000
Potongan TOTAL Potongan TOTAL Potongan TOTAL
11 Arsitektur 2,500,000 4,940,000 19 sks 400,000 7,840,000 15,000,000 22,840,000 2,500,000 20,340,000 1,250,000 21,590,000 625,000 22,215,000 12 Desain Interior 2,500,000 5,980,000 23 sks 750,000 9,230,000 15,000,000 24,230,000 2,500,000 21,730,000 1,250,000 22,980,000 625,000 23,605,000 13 Desain Produk 2,500,000 5,460,000 21 sks 600,000 8,560,000 15,000,000 23,560,000 2,500,000 21,060,000 1,250,000 22,310,000 625,000 22,935,000 14 Desain Komunikasi Visual 2,500,000 5,200,000 20 sks 900,000 8,600,000 15,000,000 23,600,000 2,500,000 21,100,000 1,250,000 22,350,000 625,000 22,975,000
*) DPP (Dana Pengembangan Pendidikan Wajib) adalah dana pengembangan yang wajib dibayar diawal tahun ajaran
**) Total biaya belum termasuk Dana Pengembangan Pendidikan Sukarela yang besarnya mulai dari Rp 0,- atau kelipatan Rp 500.000,-
***) Periode 1 adalah bagi pendaftar jalur PMDK periode 1 (14 Oktober 2019 - 4 Desember 2019)
****) Periode 2 adalah bagi pendaftar jalur PMDK periode 2 (9 Desember 2019 - 12 Februari 2020)
*****)Periode 3 adalah bagi pendaftar jalur PMDK periode 3 (17 Februari 2020 - 8 April 2020) Biaya Jalur PMDK Potongan UKT hanya untuk semester Ganjil 2020/2021
Catatan :
Pembayaran uang kuliah dapat dilakukan dengan cara online pada jadwal yang telah ditentukan
Periode 3 *****) (Potongan 25% UKT)
Periode 3 *****) (Potongan 25% UKT)
Periode 3 *****) (Potongan 25% UKT) Biaya Jalur PMDK
Biaya Jalur PMDK Periode 2 ****) (Potongan 50% UKT) Uang
Prakt./Studio
Jumlah Uang
Kuliah DPP Wajib *) Total Biaya **)
Periode 1 ***) (Potongan 100% UKT)
Periode 1 ***) (Potongan 100% UKT)
Periode 2 ****) (Potongan 50% UKT) Rp 250.000,-/sks
Rp 260.000,-/sks Biaya Jalur USM
No. Program Studi Uang Kuliah
Tetap (UKT)
Uang Kuliah Variabel (UKV)
No. Program Studi Uang Kuliah
Tetap (UKT)
Uang Kuliah
Variabel (UKV) Uang Prakt./Studio Biaya Jalur USM
Jumlah Uang
Kuliah DPP Wajib *) Total Biaya **) Uang Kuliah
Variabel (UKV) Uang Prakt./Studio Rp 230.000,-/sks
Jumlah Uang
Kuliah DPP Wajib *) Total Biaya **)
UANG KULIAH ANGKATAN 2020 TAHUN AKADEMIK 2020/2021
(dibayarkan pada awal tahun ajaran)
Periode 1 ***) (Potongan 100% UKT)
Periode 2 ****) (Potongan 50% UKT) Biaya Jalur USM
No. Program Studi Uang Kuliah
Tetap (UKT)
Biaya Jalur PMDK
Semester Genap
1 Teknik Elektro 2,500,000 3,910,000 17 sks 230,000 6,640,000
2 Teknik Kimia 2,500,000 3,910,000 17 sks 230,000 6,640,000
3 Informatika 2,500,000 3,680,000 16 sks 0 6,180,000
4 Sistem Informasi 2,500,000 4,370,000 19 sks 0 6,870,000
5 Teknik Geodesi 2,500,000 3,680,000 16 sks 355,000 6,535,000
6 Teknik Mesin 2,500,000 3,750,000 15 sks 100,000 6,350,000
7 Teknik Industri 2,500,000 4,000,000 16 sks 500,000 7,000,000
8 Teknik Sipil 2,500,000 4,000,000 16 sks 220,000 6,720,000
9 Perencanaan Wilayah & Kota 2,500,000 4,250,000 17 sks 250,000 7,000,000 10 Teknik Lingkungan 2,500,000 4,000,000 16 sks 735,000 7,235,000
11 Arsitektur 2,500,000 4,680,000 18 sks 450,000 7,630,000
12 Desain Interior 2,500,000 4,940,000 19 sks 650,000 8,090,000
13 Desain Produk 2,500,000 4,680,000 18 sks 700,000 7,880,000
14 Desain Komunikasi Visual 2,500,000 4,420,000 17 sks 990,000 7,910,000
No. Program Studi Uang Kuliah
Tetap (UKT)
Uang Kuliah
Variabel (UKV) Uang Prakt./Studio Rp 260.000,-/sks
Uang Prakt./Studio
Jumlah Uang Kuliah Jumlah Uang
Kuliah Rp 250.000,-/sks
No. Program Studi Uang Kuliah
Tetap (UKT)
Uang Kuliah
Variabel (UKV) Uang Prakt./Studio
No. Program Studi Uang Kuliah
Tetap (UKT)
Uang Kuliah Variabel (UKV) Rp 230.000,-/sks
Jumlah Uang Kuliah