• Tidak ada hasil yang ditemukan

liffifl

N/A
N/A
Protected

Academic year: 2024

Membagikan "liffifl"

Copied!
3
0
0

Teks penuh

(1)

qrq TuTRRfir

,

r$ fudf

nta

: .41493984

hfiF

: 41493981

tfd :

[email protected]

hfAcr miB-c g+ar

Tender Notice

Affql ;i.

D /tst

/ctvtL woRK/20i7

-zora

I 3 lO

qi6ci6.RtFrh tr qt $'

futrsr(quotation) 3n

ifrd fS(' dr$ t

E+*or(qrot"tion)

arfru OUffiZOlt

qT

3qt

o-,-n

s.s.Tqqq *t a.ooss a-o ffie rnF-i' F-{r"(quot"tionjit fra 3irch Tr#;'3flq* 3HqRft *-i.io#

lgtd dr{i -'5

eTrdfq Hifurfi drarrd

ffifin

rTFffirEffiil-l

liffifl

FffiIq

I uxrrY-lx-Eiv-EFEfFI

arts:

- 27togt2o17

7 ,

vs s try

,

Tl;fiFttnF[ qlat

,

gge 6t@ t

qRr

qiaqftqr F{r{r n$ fuffi

Providing and Fixing of Plumbing Cl Pipelines and and waterproofing work in old hostel room no. 31s-316

ur No.

I

Description of item of work Unit Qtv Rate Amount

DISMANTLING AND DEMOLISHING

1

Dismantling tile work

Including stacking material within S0 metres lead.

For thickness of tiles above 25 mm and up to 40 mm sqm 4.998

2

Dismantling old

c.l.

pipes including

excava@

trenches after taking out the pipes, breaking lead caulked joints, melting of lead and making into blocks, incruding stacking of pipes at site lead up to 50 metre:

meter 6.3

3 Labour for cutting C.l. pipe with steel saw.

100 mm diameter C.l. pipe each cut 3

4

raKtng our or flusnrng clstern of ail types (c.1./pvcA/itrious china)/ indian/european wc/washbasin incruding stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead.

each 3

5 KeTtxlng or flusntng clstern of alt

vpes

(c.1./pvcA/itrious

chinET-

indian/european wc/wash basin etc.

wc/cistern/wash basin each 3

6 Hrovtotng anct taylng

s&s

centrifugally Cast (Spunl/Ductile

lion

Pipes conforming to lS : 8329 :

4" meter 1.5

3" meter 1.8

7 providing and fixing of Cl P- Trap- 4" to 3,' each 1

8 Providing and Fixing of upvc bend 65 mm 90 degree each 2

9 providing and fixing of upvc pipe 05 mm meter 3

10 providing and fixing cp jali drain floor-3" each 2

4" each 2

11

Providing/supplying lead caulked joints to spun rron or

c.l.

pipes

and specials, including testing of joints incruding the cost of pig lead:

100 mm diameter pipe each 5

TILE FLOORING

lo.qr.- No -

t c.,'.

f.
(2)

Sr No. Description of item of work Unit

otv

Rate Amount

12

Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to lS : 15622 of approved make in colours such as White, lvory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement: 4 Coarse sand), jointing with grey cement slurry @ 3.3kg/sqm including pointing the joints with white cement and matching pigment

etc., complete.

sqm 4.998

REPAIRS TO BUILDING

13

Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq. meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per directions of Engineer-ln-

With cement mortar 1:4 (1 cement : 4 fine sand) sqm 8.998 FINISHING

14

Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete

sqm 15.4198

15

urstempenng

wtn

ory orstemper ot approveo Drano ano manufacture (one or more coats) and of required shade on old work to give an even shade.

sqm 15.4198

Old work (one or more coats)

16

Providing and applying white cement based putty of average thickness 1 mm, of approved brand

and

anufacturer, over the plastered wall surface to prepare the surface even and smooth complete.

40 % of painting sqm 6.167

17

Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consistinq of applvinq:

(a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. This layer will be allowed to air cure for 4 hours.

(b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0 126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of alljoints, corners, junctions of pipes and masonry with polymer mixed slurry.

sqm 4.998

Total(inclusive taxes) extra taxes if any Total( inclusive taxes) Rebate/discount if any Grand Total (inclusive taxes)

€,S,=rffif l},tt "'ffilqlzot: 1/t\ c'{

3TF{idr Rfrd 's

'

fuaa No' L carl

(3)

Sr No. Description of item of work Unit

otv

Rate Amount

qffir

1.

yFrd ti h

c-6n

fM(quotationer)fiT wrn *) tsar 3lffi t

.

z *r4

fa-+rur(specification)

{ffd s RFfr 3tF-{idr *.

sra+at

ildr sIGt

.

g 614

rrreer

ffi t sra tsF+ t

efl-rr

6rd sarr

6tdr

srfr(r.

4.

ffilqro1"tioner) fu+tq

wrf(quotation)

*' gFr 'ta rq* " tffi)-" d

srn-ar

3rffi

F

5. The quantity will be increased or decreased as per the actual site condition.

6.Fir{rur

qd1qu6ta1;sn1

M{r Grn fi $tr grsq dqft {jt{ Fdr il mt} Stt f{R f*q qtrrm.

z.

altsra f frq 4(' flrqh 6-d rtrt qr tdo qdlh-c-d {il.

a.

ara gffi m $frft6'f-{rqr

s{rsr

lr gfrw

errsr a-€t

frqr dra-lr

e.6ffifi EqrG-c .rv"grfi-a rqr ffii slqh

.n-fr

nRt w s 16ri * Fr' a\r

{FJf.

10.

qsqig nFt +rq * Tffr qr qrc tr ('d+-{d ;r€t TFn

.

tt.*rq o.ri grrq ffi

afi

c-fiK 6r dEt *. tr\'

tst Dethi

centreFfia-R d€t

{Frfr.

12. The

lsl

Delhi Centre reserve the right the whole tender process may be treated as a cancelled/terminated at any stage without assisgning any reason.

13.

(ffiI- i.)

GST

-

No. is a mandatary from

of lST

JULLY 2017. Please enclosed GST Regbtratlon document.

14. For any clarification OSD may be contacted

15. The Quotationer Should be in PWD, CPWD Registered. The Registration Document encloslng lc must.

cfr:-

1.

qil;rr

qFrc

z.

iq Frd $rt w

3rB

ffdff +q

fu* No.3

Referensi

Dokumen terkait

This investigation is carried out to study effect of carbon filled glass ceramic: from waste to wealth in order to produce more porous and lightweight tiles.. The apparent

The aim of the present work is to study corrosion properties of glass composite materials from recycled glass and ceramic waste as raw materials in the production of ceramic

Step 3 : Breaking and Fixing of Ceramic Tiles • Lay 50 mm thick bed of cement mortar over the waterprooing layer and smoothen surface using edger.. • Break the

MOST MODERN YACHT CLUB REQUIRES MODERN FLOOR TILES if The building is of steel frame construction with panel brick walls, asbestos roof and concrete floor slabs.. The section facing

"In all, 1,100 yards of Vinyl Wall Tiles and 1,000 yards of Vinyl Floor Tiles were used in this installation." Next time you feel like throwing acid — or simply want sound advice on

Arch lays the first tile, Bill doubles the area tiled by laying another tile to make a rectangle.. Then Arch lays two more tiles to make a square-shaped set of

4.2 Result for poly-buffered LOCOS 4.2.1 Pad oxide, nitride and amorphous thickness measurement Table 4.7: Thickness for 1st pad oxide Table 4.7 indicates the thickness of pad

Also, it was shown that floor impact sound insulation performance of floating floor is significantly influenced by dynamic stiffness, thickness of resilient materials, and ceilings..