T & B
1.25
2.30
FIBER CEMENT BOARD CEILING DROOPED @ 0.20m
DROP LIGHT
MIRROR
WALL TILES
MARBLE FINISH TILES MARBLE FINISH TILES
MARBLE FINISH TILES
WATER CLOSET SHOWER
PATTERNED SEAMLESS WALL TILES (FOR ARCHITECTS APPROVAL)
0.65m X 2.10m REFLECTIVE MIRROR
2.30
3.00 0.20
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
BATAAN PENINSULA STATE UNIVERSITY
REHABILITATION OF UNIVERSITY HOSTEL(FEMALE AND MALE)
TENEJERO, BALANGA CITY
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
PROJECT TITLE:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
F:\logo-bpsu.png
FLOOR FINISH SCHEDULE WALL FINISH SCHEDULE PARTITION SCHEDULE
FF1 FF2 FF3
6mmx600mm CERAMIC VITRIFIED TILES
POLISHED CONCRETE SALT AND PEPPER RESIN 3000 FINISH OUTDOOR WOOD TEXTURE TILES NON-SKID
W1
W3 W4 W5 W2
SEMI GLOSS LATEX PAINT
SEMI GLOSS LATEX PAINT LESS FINAL COAT 6mmx600mmx600mm CERAMIC VITRIFIED TILES
PATTERNED SEAMLESS WALL TILES(FOR ARCHITECTS APPROVAL) WALL STONE DECO TILES(FOR ARCHITECTS APPROVAL)
W6 GREEN WALL BLOW-UP PLAN
DETAILS ELEVATION PERSPECTIVE
2.75
1.70 T & B
WALL TILES
MIRROR
FIBER CEMENT BOARD CEILING DROPPED @ 0.20m
DROP LIGHT
MARBLE FINISH TILES
MARBLE FINISH TILES
MARBLE FINISH TILES
WATER CLOSET BATHTUB
SHOWER
WOOD PANEL PATTERNED SEAMLESS WALL TILES
(FOR ARCHITECTS APPROVAL)
0.65m X 2.10m REFLECTIVE MIRROR
2.75
3.00 0.20
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
BATAAN PENINSULA STATE UNIVERSITY
REHABILITATION OF UNIVERSITY HOSTEL(FEMALE AND MALE)
TENEJERO, BALANGA CITY
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
PROJECT TITLE:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
F:\logo-bpsu.png
FLOOR FINISH SCHEDULE WALL FINISH SCHEDULE PARTITION SCHEDULE
FF1 FF2 FF3
6mmx600mm CERAMIC VITRIFIED TILES
POLISHED CONCRETE SALT AND PEPPER RESIN 3000 FINISH OUTDOOR WOOD TEXTURE TILES NON-SKID
W1
W3 W4 W5 W2
SEMI GLOSS LATEX PAINT
SEMI GLOSS LATEX PAINT LESS FINAL COAT 6mmx600mmx600mm CERAMIC VITRIFIED TILES
PATTERNED SEAMLESS WALL TILES(FOR ARCHITECTS APPROVAL) WALL STONE DECO TILES(FOR ARCHITECTS APPROVAL)
W6 GREEN WALL BLOW-UP PLAN
DETAILS ELEVATION PERSPECTIVE
6.00
CLOSET
CABINET
WOOD TILES (GLOSSY) VANITY MIRROR TV
VERTICAL WOOD SLAT DESIGN
WOOD PANEL
PIN LIGHT
2.30m X 3.00m VERTICAL WOOD SLAT
2.80m X 1.45m WOOD PANEL
2.30m X 0.65m CABINET
3.00 0.20
5.75
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
BATAAN PENINSULA STATE UNIVERSITY
REHABILITATION OF UNIVERSITY HOSTEL(FEMALE AND MALE)
TENEJERO, BALANGA CITY
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
PROJECT TITLE:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
F:\logo-bpsu.png
FLOOR FINISH SCHEDULE WALL FINISH SCHEDULE PARTITION SCHEDULE
FF1 FF2 FF3
6mmx600mm CERAMIC VITRIFIED TILES
POLISHED CONCRETE SALT AND PEPPER RESIN 3000 FINISH OUTDOOR WOOD TEXTURE TILES NON-SKID
W1
W3 W4 W5 W2
SEMI GLOSS LATEX PAINT
SEMI GLOSS LATEX PAINT LESS FINAL COAT 6mmx600mmx600mm CERAMIC VITRIFIED TILES
PATTERNED SEAMLESS WALL TILES(FOR ARCHITECTS APPROVAL) WALL STONE DECO TILES(FOR ARCHITECTS APPROVAL)
W6 GREEN WALL BLOW-UP PLAN
DETAILS ELEVATION PERSPECTIVE