PERSPECTIVE
BATAAN PENINSULA STATE UNIVERSITY
COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)
(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUÑGOL
BATAAN PENINSULA STATE UNIVERSITY
APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
1 2 3 4
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
MECHANICAL ELECTRICAL
SANITARY STRUCTURAL ARCHITECTURAL
LINE & GRADE LAND USE & ZONING
DISTRICT/CITY/MUNICIPALITY
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS REPUBLIC OF THE PHILIPPINES OFFICE OF THE BUILDING OFFICIAL
ELECTRONICS SCHEDULE SHEET
ARCHITECTURAL
COLLEGE BUILDING STUDENT
CENTER BUSINESS CENTER
CR
SEPTIC TANK
GUARD HOUSE
PATHWALK
S T U D Y S H E D S
SHED SHED SHED
COVERED COURT
NSTP
DUMP
CANTEEN HIGH SCHOOL
BUILDING STAGE
FLAG POLE
S T U D Y S H E D S
CARPENTRY/OFFICE SHOP OF THE CAMPUS DIRECTOR
OPEN FIELD COURT
MANHOLE
MANHOLE
MANHOLE
MANHOLE
MANHOLE
MANHOLE
MANHOLE MANHOLE
MANHOLE
ELECTRIC POST ELECTRIC
POST
ELECTRIC POST
ELECTRIC POST MANHOLE
NATIONAL ROAD EXISTING CYCLONE
WIRE FENCE
BPSU BOUNDARY LINE
PATH WALK ADMINISTRATION BUILDING PRESIDENT'S OFFICE CAMPUS DIRECTOR'S
OFFICE
LEARNING AND RESOURCE CENTER/ OSA EXISTING CHB WALL
PERIMETER FENCE
MAIN GATE
PROPOSED PE ROOM
SITE
A
SITE
MUNICIPAL PARK
JOSE C. PAYUMO JR.
MEMORIAL HOSPITAL CHOWKING
LA VERCONS BAKESHOP
ZAMBALES RURAL BANK, INC. DINALUPIHAN BRANCH
MUNICIPAL HALL
7-ELEVEN LANDBANK
ANGELES-PORAC-FLORIDA BLANCA SAN RAMON
PARISH CHURCH SAN JUAN ST.
BPSU
SHEET NUMBER:
SITE DEVELOPMENT PLAN
VICINITY MAP A1
AT DINALUPIHAN CAMPUS
AA
5.50 5.50 5.50 5.50
11.00 11.00
22.00 2.00
3.00 1.50 1.50 3.00 9.00
W 3
CR
(FEMALE)
CR
(MALE)
EXISTING PHASE 1 EXISTING PHASE 1
BB
W 3
D 3 D
3 D
2
D 2
D 3
Landing up
1 2
up Landing
3 4 5 6 7 8 9
11.00 23.50
5.50 2.00
3.50 2.75
2.75 5.50
3.15
6.00 3.00 2.25
2.25
A
B
C
E D
F
1.50
12.50
(8.25 sq.m) (8.25 sq.m)
+0.10 +0.10
+1.95
+1.95
WALL WALL
1.50 9.00
2.85
3.75 3.75
FLOOR FINISH SCHEDULE WALL FINISH SCHEDULE PARTITION SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
PROJECT TITLE:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
GROUND FLOOR PLAN
F-3 F-3
P 8
DR. EDMUNDO C. TUÑGOL
P 6
BATAAN PENINSULA STATE UNIVERSITY
COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)
(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN
AT DINALUPIHAN CAMPUS
BB
11.00
5.50 5.50 5.50
9.00
5.50 5.50 5.50 5.50
11.00 11.00
22.00
3 4 5 6 9
MUSIC ROOM
DANCE ROOM
D 1
W W
1 1
2
W W
1 1
W 2 W
TO
ROOF DECK
up
down
W
2
3 W 3
D 2 COMMON
CR
COMMON CR D
1 D
Landing Landing
W 4
AA
D 1
1 2 7 8
A
B
C
D
E
F
Landing down
+1.95
2.25
WALL WALL WALL
WALL
3.00 2.25
1.50
11.00
23.50
1.50
4.50 4.50
1.65 1.20
+3.90
Landing
(66 sq. m)
(99 sq. m)
+1.95 +3.90
+5.55
+4.00
+4.00
MIRROR MIRROR MIRROR
(3.30 sq.m)
2.00 2.00
1.50
(3.30 sq.m)
+3.90 +3.90
RAILINGS RAILINGS
RAILINGS
H A L L W A Y
9.00
3.15
3.75 3.75
FLOOR FINISH SCHEDULE WALL FINISH SCHEDULE PARTITION SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUÑGOL
APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
SECOND FLOOR PLAN P
8
F-3 F-3
P 6
P 8
P
8 P
8 P
8 P
P 6 4
P 8
P 8
P 8
F-3
F-7
BATAAN PENINSULA STATE UNIVERSITY
(P.E BLDG. AND COVERED COURT)
(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN
AT DINALUPIHAN CAMPUS
PARTITION SCHEDULE
FLOOR FINISH SCHEDULE WALL FINISH SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
PROJECT TITLE:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
4.50 4.50 9.00
5.50 5.50 5.50 5.50
11.00 11.00
22.00
3 4 5 7 9
ROOF DECK
RAILINGS RAILINGS
RAILINGS RAILINGS
RAILINGS RAILINGS
RAILINGS
RAILINGS RAILINGS
RAILINGS RAILINGS
Landing down
AA BB
3.00
5.50 5.50
11.00 11.00
5.50 5.50
1
B A
C
D
E
F
2 6 8
(165 sq. m)
+5.55
+7.30
+7.35
down
6.00
ROOF DECK PLAN P
9 P
9
P
9 P
9
9 P
9 P
9 P
9 P 9
P
P 9
P 9 F-7
BATAAN PENINSULA STATE UNIVERSITY
COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)
(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN
AT DINALUPIHAN CAMPUS
FLOOR FINISH SCHEDULE WALL FINISH SCHEDULE PARTITION SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
3.40 3.90 1.30 1.20
0.25
TOP OF ROOF BEAM
ELEV.: 8.60m
SECOND FLOOR FINISH
ELEV.: 5.20m
GROUND FLOOR FINISH
ELEV.: 1.30m
NGL
ELEV.: +0.00m
MOULDING CANOPY
CANOPY
AWNING WINDOW
RAILINGS RAILINGS RAILINGS RAILINGS
PANEL DOOR
3.40 3.90 1.30 1.20
0.25
TOP OF ROOF BEAM
ELEV.: 8.60m
SECOND FLOOR FINISH
ELEV.: 5.20m
GROUND FLOOR FINISH
ELEV.: 1.30m
NGL
ELEV.: +0.00m
MOULDING CANOPY
CANOPY
AWNING WINDOW
RAILINGS RAILINGS RAILINGS RAILINGS
PANEL DOOR
TOP OF ROOF DECK RAILINGS
ELEV.: 9.80m
LAMP
3.40 3.90 1.30 1.20 TOP OF ROOF BEAM
ELEV.: 8.60m
SECOND FLOOR FINISH
ELEV.: 5.20m
GROUND FLOOR FINISH
ELEV.: 1.30m
NGL
ELEV.: +0.00m
AWNING WINDOW SLIDING WINDOW
RAILINGS RAILINGS RAILINGS RAILINGS
PANEL DOOR CANOPY TOP OF ROOF DECK RAILINGS
ELEV.: 9.80m
WALL LAMP
A5
FRONT ELEVATION REAR ELEVATION
DR. EDMUNDO C. TUÑGOL
W 1
W 1 W
1 W
4 W
1
W 4
DECO. STONE
W 4
W 1
W
1 W
4
W 1
W 1
W 4
BATAAN PENINSULA STATE UNIVERSITY
(P.E BLDG. AND COVERED COURT)
(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN
AT DINALUPIHAN CAMPUS
FLOOR FINISH SCHEDULE WALL FINISH SCHEDULE PARTITION SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
PROJECT TITLE:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
TOP OF ROOF BEAM
ELEV.: 8.60m
SECOND FLOOR FINISH
ELEV.: 5.20m
GROUND FLOOR FINISH
ELEV.: 1.30m
NGL
ELEV.: +0.00m
3.40 3.90 0.25
1.30 1.20
RAILINGS RAILINGS
EXISTING SLIDING WINDOW EXISTING PANEL DOOR DECO. STONE
METAL SIGNAGE (NAME PLATE)
STAIRS
TOP OF ROOF DECK RAILINGS
ELEV.: 9.80m
MOULDING GRILLS
GREEN WALL LAMP
TOP OF ROOF BEAM
ELEV.: 8.60m
SECOND FLOOR FINISH
ELEV.: 5.20m
GROUND FLOOR FINISH
ELEV.: 1.30m
NGL
ELEV.: +0.00m
3.40 3.90 1.30 1.20
PANEL DOOR WINDOWED
RAILINGS RAILINGS
STAIRS
TOP OF ROOF DECK RAILINGS
ELEV.: 9.80m
RAILINGS
STAIRS CANOPY
EXISTING SLIDING WINDOW LAMP
A6
RIGHT SIDE ELEVATION LEFT SIDE ELEVATION
DR. EDMUNDO C. TUÑGOL
W
1 W
4
W 1
W 1
W 4
W 1
BATAAN PENINSULA STATE UNIVERSITY
COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)
(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN
AT DINALUPIHAN CAMPUS
FLOOR FINISH SCHEDULE WALL FINISH SCHEDULE PARTITION SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
3.40 3.90 1.30 1.20
0.25
TOP OF ROOF BEAM
ELEV.: 8.60m
SECOND FLOOR FINISH
ELEV.: 5.20m
GROUND FLOOR FINISH
ELEV.: 1.30m
NGL
ELEV.: +0.00m
MUSIC ROOM DANCE ROOM
3 4 5 7 9
RAILINGS RAILINGS RAILINGS RAILINGS
2
TOP OF ROOF DECK RAILINGS
ELEV.: 9.80m
1.20 1.30 3.90 3.40
MUSIC ROOM COMMON
STAIRS CR
CR (Female)
TOP OF ROOF BEAM
ELEV.: 8.60m
SECOND FLOOR FINISH
ELEV.: 5.20m
GROUND FLOOR FINISH
ELEV.: 1.30m
NGL
ELEV.: +0.00m
B C D F
RAILINGS RAILINGS
A
TOP OF ROOF DECK RAILINGS
ELEV.: 8.60m
A7
SECTION THRU A-A SECTION THRU B-B
DR. EDMUNDO C. TUÑGOL
BATAAN PENINSULA STATE UNIVERSITY
(P.E BLDG. AND COVERED COURT)
(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN
AT DINALUPIHAN CAMPUS
FLOOR FINISH SCHEDULE WALL FINISH SCHEDULE PARTITION SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
PROJECT TITLE:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
FFL
1.50
3.20 0.80
0.80
TYPE: GLASS, SLIDING WINDOW
LOCATION: MUSIC ROOM & DANCE ROOM 2 SETS
REMARKS : AS PER MANUFACTURERS
W 2
TYPE: GLASS, AWNING WINDOW
LOCATION: COMFORT ROOMS 4 SETS
REMARKS : AS PER MANUFACTURERS
W 3
TYPE: GLASS, AWNING WINDOW
LOCATION: MUSIC ROOM & DANCE ROOM 4 SETS
REMARKS : AS PER MANUFACTURERS 3.20
W
1.50
1
0.60 0.60 1.30
TYPE: GLASS,SLIDING WINDOW
LOCATION: DANCE ROOM 1 SET
REMARKS : AS PER MANUFACTURERS
1.50
1.60
0.60 W
4
FFL 2.10 2.10
1.00 0.80 0.60
2.10
D 1
TYPE: PANEL DOOR
WINDOWED, SWING
LOCATION: MUSIC ROOM & DANCE ROOM
3 SETS
REMARKS : AS PER MANUFACTURERS
D 2
TYPE: PANEL DOOR, SWING
LOCATION: COMFORT ROOMS 4 SETS
REMARKS : AS PER MANUFACTURERS
D 3
TYPE: uPVC DOOR
LOCATION: TOILET CUBICLES 3 SETS
REMARKS : AS PER MANUFACTURERS
SCHEDULE OF DOORS AND WINDOWS
DR. EDMUNDO C. TUÑGOL
BATAAN PENINSULA STATE UNIVERSITY
COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)
(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN
AT DINALUPIHAN CAMPUS
FLOOR FINISH SCHEDULE WALL FINISH SCHEDULE PARTITION SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
10
11
12
13
0.25
0.15
RUN
RISE
0.1250 Landing down
+1.95
RAILINGS
1.20
1.50
+3.90
RAILINGS 0.25
RAILINGS RAILINGS
3.00 1.50 3.00
3.00
9.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
up
down Landing
Landing
WALL WALL WALL
Landing +1.95
+3.90
+5.55
2.25
1.00 1.00
2.00
3.50 3.00 4.25
2.50 1.75 2.75 2.00
0.25 10.75
11.00
+7.35
1 2 3 4 5 6 7 8 9 10 11 12 13
14 15 16 17 18 19 20 21 22 23 24 25
31 30 29 28 27
26 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
TO ROOF DECK
STAIRS PLAN 1 STAIRS PLAN 2 STAIRS DETAIL
DR. EDMUNDO C. TUÑGOL
BATAAN PENINSULA STATE UNIVERSITY
(P.E BLDG. AND COVERED COURT)
(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN
AT DINALUPIHAN CAMPUS
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
PROJECT TITLE:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
RB1 RB1
RB1 RB1
RB1
RB1 RB1 RB1 RB1
RB1
100mm THICK REINFORCED CONCRETE SLAB WITH 10mmØ REBARS @ 400mm O.C. B.W.
RB1 RB1 RB1
RB2 RB1 RB1
RB2 RB2
RB1
RB1 RB1
RB1 RB1
RB1 RB1
C1
C1 C1 C1
C1 C1 C1
C1
C1 C1
C1 C1
5.50 5.50 5.50 5.50
6.00 3.00 4.50 4.50
5.50 5.50 5.50 5.50
22.00
9.00
22.00
9.00
3 4 5 7 9
1.50
B
C
D
F
ROOF DECK FRAMING PLAN
S
DR. EDMUNDO C. TUÑGOL
BATAAN PENINSULA STATE UNIVERSITY
COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)
(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN
AT DINALUPIHAN CAMPUS
SHEET NUMBER:
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
UNIVERSITY PRESIDENT VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
DR. GREGORIO J. RODIS
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
SUPPORT
MIDSPAN
MIDSPAN SUPPORT
MARK
WIDTH
(mm)
DEPTH
(mm)
LEFT MID RIGHT
10mm STIRRUPs
(DIAMETER, SPACING)
RB1 400
RB2 450
BEAM SCHEDULE
DIMENSION MAIN REINFORCEMENT
1 @ 50mm 10 @ 100mm REST @ 200MM O.C.
200
200
5 - 20mm Ø 3 - 20mm Ø
1 @ 50mm 10 @ 100mm REST @ 200MM O.C.
5 - 20mm Ø 3 - 20mm Ø
SUPPORT SUPPORT
5 - 20mm Ø 3 - 20mm Ø
5 - 20mm Ø 3 - 20mm Ø 3 - 20mm Ø
5 - 20mm Ø 3 - 20mm Ø 5 - 20mm Ø
MARK WIDTH
(mm)
DEPTH
(mm) SECTION REINFORCEMENT BARS
STIRRUP - TIES
SIZE SPACING (FROM EACH END)
C1
1 @ 50mm 3 @ 100mm 3 @ 150mm REST @ 200MM O.C.
300 300 8 - 16mm Ø 10mm Ø
C2
1 @ 50mm 3 @ 100mm 3 @ 150mm REST @ 200MM O.C.
10mm Ø
COLUMN SCHEDULE
200 300 6 - 16mm Ø
400 mm
400 mm 200 mm
400 mm
200 mm
200 mm
450 mm 450 mm
ROOF DECK FRAMING PLAN
S2
DR. EDMUNDO C. TUÑGOL
BATAAN PENINSULA STATE UNIVERSITY
(P.E BLDG. AND COVERED COURT)
(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN
AT DINALUPIHAN CAMPUS
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
PROJECT TITLE:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
9.00
11.00 11.00
6.00
5.50 5.50 5.50
5.50 5.50 5.50
11.00
22.00
2.00
3.00 1.50 3.00
2.75 2.75
22.00
3.00
5.50
5.50
11.00
2.00
1.50 9.00
TO EXISTING
PANEL BOARD 1
GROUND FLOOR LIGHTING LAYOUT
E
DR. EDMUNDO C. TUÑGOL
BATAAN PENINSULA STATE UNIVERSITY
COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)
(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN
AT DINALUPIHAN CAMPUS
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
11.00 11.00
22.00
5.50 5.50 5.50
4.50 4.50 9.00
5.50 5.50 5.50 5.50
11.00 11.00
22.00
1.65 4.35
4.00 1.50
3.00
1
1
SECOND FLOOR LIGHTING LAYOUT
E2
DR. EDMUNDO C. TUÑGOL
BATAAN PENINSULA STATE UNIVERSITY
(P.E BLDG. AND COVERED COURT)
(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN
AT DINALUPIHAN CAMPUS
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
PROJECT TITLE:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
11.00 11.00
22.00
3.00 6.00
9.00
5.50 5.50 5.50 5.50
4.50 4.50 9.00
5.50 5.50 5.50 5.50
11.00 11.00
22.00
2
ROOF DECK LIGHTING LAYOUT
E3
DR. EDMUNDO C. TUÑGOL
BATAAN PENINSULA STATE UNIVERSITY
COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)
(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN
AT DINALUPIHAN CAMPUS
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
11.00 11.00
22.00
5.50 5.50 5.50
4.50 4.50 9.00
5.50 5.50 5.50 5.50
11.00 11.00
22.00
1.65 4.35
4.00 1.50
3.00
2
3 4
4 3
5
SECOND FLOOR POWER LAYOUT
E4
DR. EDMUNDO C. TUÑGOL
BATAAN PENINSULA STATE UNIVERSITY
(P.E BLDG. AND COVERED COURT)
(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN
AT DINALUPIHAN CAMPUS
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
PROJECT TITLE:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
SCHEDULE & COMPUTATION OF LOADS
LIGHTING OUTLET 12 230 1200 15 AT 2 # 2.00 mm THHN CU
15 mmØ
2
DESCRIPTION NO. OF
OUTLET VOLTS WATTS AMPERE
PER CKT.
PROTECTION PER CKT.
SIZE OF WIRE/
CONDUITS CKT.
NO.
30 AT
1 230 1 HP
30 AT 230 1 HP
20 AT
5 230 1800
1 2 3 4 5
PANEL BOARD (MUSIC ROOM)
5.2174
7.8261 8.0000
AIRCONDITION 8.0000 2 # 3.50 mm THHN CU
25 mmØ 1 # 3.50 mm THHN CU
2 2
AIRCONDITION 1 2 # 3.50 mm THHN CU
25 mmØ 1 # 3.50 mm THHN CU
2 2
CONVENIENCE OUTLET 2 # 3.50 mm THHN CU
20 mmØ 1 # 3.50 mm THHN CU
2 2
SPARE
TOTAL
230 20 AT 25 mmØ
29.0435 40 AT 2 # 8.0 mm THHN CU 32 mmØ 1 # 3.50 mm THHN CU
2 2
6 SPARE 230 20 AT 25 mmØ
LEGEND
ACO
DESCRIPTION
PANEL BOARD
LIGHTING OUTLET
AIR CONDITIONING OUTLET
N CIRCUIT HOMERUN
SINGLE GANG SWITCH
S1
CONVENIENCE OUTLET
THREE GANG SWITCH
S3
CIRCUIT LINE
h. REFRIGERATOR OUTLET
0.50m A.F.F.
g. RANGE OUTLET
1.10m A.F.F.
f. GROUND FAULT INTERRUPTER
SHALL BE ELECTRICAL METALLIC CONDUIT (EMT).
CROWN SUPREME SCH. 40
CLIPSAL C-CONCEPT / NATIONAL WIDE SERIES FUMACO
PHILFLEX OR APPROVED EQUAL MITSUBISHI/SQUARE D/ABB/SIEMENS
GROUND --- GREEN 2
c. WIRING DEVICES
17. ADDITIONAL MATERIALS SPECIFICATIONS:
b. CIRCUIT BREAKER (BOLT-ON TYPE) d. POLYVINYL CHLORIDE CONDUIT (PVC) e. JUNCTION / UTILITY BOX GA.16 a. WIRES AND CABLES
LINE 2 --- RED LINE 1 --- BLACK
21. WIRES SHALL BE COLOR CODED:
2
0.30m A.F.F.
1.30m A.F.F.
1.10m A.F.F.
1.40m A.F.F. AT CENTER
23. NO REVISION IN THE DESIGN SHALL BE DONE WITHOUT THE PRIOR KNOWLEDGE AND APPROVAL OF THE DESIGNER AND THE OWNER. ANY SUCH REVISION DONE WITHOUT THE APPROVAL SHALL CAUSE 24. ALL WEATHER-EXPOSED INSTALLATIONS SHALL USE WEATHERPROOF TYPE MATERIALS, ESPECIALLY
25. ALL EQUIPMENT WIRE, ROYAL CORDS, SPECIAL TYPE PLUGS AND RECEPTACLE AS REQUIRED 26. ALL ELECTRICAL WORKS SHALL BE DONE UNDER THE DIRECT SUPERVISION OF A DULY LICENSED
WEATHERPROOF CONVENIENCE OUTLET, CAST-BOXES, JUNCTION BOXES SUBMIT SAMPLE FOR APPROVAL.
ELECTRICAL ENGINEER AND / OR MASTER ELECTRICIAN.
SHALL BE PROVIDED BY THE ELECTRICAL CONTRACTOR.
RESPONSIBILITY OF THE DESIGNER TO CEASED AS A WHOLE.
CIRCUIT BREAKER. EACH PANEL WILL BE PROVIDED WITH A TYPEWRITTEN CIRCUIT DIRECTORY.
18. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR THE PROPER IDENTIFICATION AND LABELING OF ALL 16. ALL 30-AMPERES CIRCUIT HOMERUN TO PANELBOARD MORE THAN 30 METERS IN LENGTH
COMPLETE IN ALL ASPECTS AS REQUIRED IN PLANS AND SPECIFICATION AND READY FOR OPERATION.
AND DISTANCES OF EQUIPMENT. THE CONTRACTOR IS HEREBY REQUIRED TO MAKE ADJUSTMENT AT THE JOBSITE AS LOCATIONS, LEVELS AND DISTANCES ARE GOVERNED BY ACTUAL FIELD CONDITIONS.
19. THE JOB SHALL BE EXECUTED IN THE MOST THROUGH PROMPT AND WORKMAN LIKE MANNER, EMPLOYING
20. THE DRAWING AND SPECIFICATIONS ARE INTENDED TO PRESENT A GENERAL LAYOUT AND BROAD OUTLINE STANDARD TOOLS, EQUIPMENT, METHODS AND GOOD ENGINEERING PRACTICES. THE JOB SHALL BE DONE SHALL BE 5.5mm THHN (#10 AWG), UNLESS OTHERWISE SPECIFIED ON PLANS.
OF ITS RATING.
ON PLANS.
b. RECEPTACLES
1. ALL ELECTRICAL WORK SHALL CONFORM TO THE LATEST EDITION THE PHILIPPINE ELECTRICAL AND THE REQUIREMENTS OF LOCAL UTILITY COMPANIES.
WHENEVER REQUIRED AND NECESSARY, ALTHOUGH SUCH BOXES ARE NOT INDICATED 3. MINIMUM SIZE OF WIRE AND CONDUIT SHALL BE 2.0 mm THHN AND 20MM (1/2") NOMINAL DIA.
4. NO BRANCH CIRCUIT WIRING IN LIGHTING AND POWER SHALL HAVE A LOAD MORE THAN 80%
7. FOR EACH SPARE CIRCUIT IN PANELBOARD, PROVIDE AN EMPTY CONDUIT 20MM (3/4") DIA.
RESPECTIVELY. UNLESS OTHERWISE SPECIFIED ON PLANS.
5. LIGHT CONTROL SWITCHES SHALL BE RATED 16 AMPERES, 230 Vac.
6. UNLESS OTHERWISE SPECIFIED PULLBOXES OR JUNCTION BOXES SHALL BE PROVIDED
10. MOUNTING HEIGHTS SHALL BE AS FOLLOWS:
8. ALL MATERIALS AND EQUIPMENT TO BE USED SHALL BE BRAND NEW AND OF APPROVED 9. ALL METAL FRAMES SHALL BE PROPERLY AND ADEQUATELY GROUNDED. GROUND WIRE SHALL
CODE, TO THE RULES AND REGULATIONS OF LOCAL AND NATIONAL AUTHORITIES CONCERNED
d. RANGEHOOD OUTLET e. PANELBOARDS c. COUNTER TOP OUTLET a. LIGHT SWITCHES
TYPE FOR BOTH LOCATION AND PURPOSES.
BE PROVIDED ON ALL EQUIPMENT FEEDER.
TERMINATING TO A COVERED SQUARE BOX.
2. ALL PIPE EMBEDDED IN CONCRETE SHALL BE POLYVINYL CHLORIDE (PVC) AND ALL EXPOSED
SERVICE ENTRANCE SHALL BE 230 VOLTS, SINGLE-PHASE, 2WIRE+GROUND, 60Hz.
22. THERE SHALL BE ONLY ONE SERVICE DROP TO THE PROPOSED BUILDING. SECONDARY 12. ALL FLUORESCENT LAMPS SHALL BE PROVIDED WITH POLYESTER FILLED PRE-HEAT
14. THE CONTRACTOR SHALL SECURE ALL PERMITS AND PAY FEES REQUIRED FOR THE WORKS, AND SHALL FURNISH THE OWNER THROUGH THE ENGINEER'S FINAL CERTIFICATE OF INSPECTION AND APPROVAL FROM PROPER GOVERNMENT AUTHORITIES FOR COMPLETE WORKS.
15. EXPOSED CONDUIT RUN SHALL BE INSTALLED PARALLEL TO OR PERPENDICULAR WITH THE FLOOR AND SUPPORTED BY CLAMPS EVERY 152.4 CM, DIAGONAL RUN SHALL NOT BE ACCEPTED. (THIS IS ALSO APPLICABLE TO CONDUITS RUNNING OVERHEAD INSIDE CEILING ).
AS REQUIRED UNDERFIELD CONDITION
I. ACU's ( WINDOW TYPE ) AS REQUIRED UNDERFIELD CONDITION 0.50m A.F.F.
THERMALLY PROTECTED HIGH POWER BALLAST.
13.DUPLEX RECEPTACLES SHALL BE RATED 10 AMP, 250 VOLTS, ROUNDED SLOT FOR 220 VOLTS AND SPECIAL OUTLETS SHALL BE RATED 15AMP.,250 VOLTS AS REQUIRED.
11.OUTLET BOXES SHALL BE AS FOLLOWS:
LIGHT OUT 1-1/2" DEEP, 4" OCTAGONAL BOX 1 OR 2 WAY ENTRIES 2-1/8" DEEP, 4" OCTAGONAL BOX 3 OR 4 WAY ENTRIES RECEPTACLES AND TELEVISION ANT.
AND TELEPHONE OUT 2-1/8" DEEP, 2"X4" UTILITY BOX 1 OR 2 RACEWAY ENTRIES 1-1/2" DEEP, 4" SQUARE BOX WITH 1-GANG RAISED PLASTIC COVER FOR 3 OR 4 RACEWAY ENTRIES
GENERAL ELECTRICAL NOTES :
1 3
2 4 5
GROUND
15AT 30AT
30AT 20AT
SERVICE ENTRANCE
M
20AT
40 AT
20AT
6
1 3
2 4 5
GROUND
15AT 15AT
30AT 30AT
6
SERVICE ENTRANCE
M
20AT
40 AT
20AT
SCHEDULE & COMPUTATION OF LOADS
LIGHTING OUTLET 12 230 1200 15 AT 2 # 2.00 mm THHN CU
15 mmØ
2
DESCRIPTION NO. OF
OUTLET VOLTS WATTS AMPERE
PER CKT.
PROTECTION PER CKT.
SIZE OF WIRE/
CONDUITS CKT.
NO.
12 230 12 15AT
30 AT 230 1 HP
230 1
2 3 4 5
PANEL BOARD (DANCE ROOM)
5 230
5.2174
8.0000
6 20 AT
CONVENIENCE OUTLET
230
40 AT SPARE
LIGHTING OUTLET 5.2174
AIRCONDITION 1 2 # 3.50 mm THHN CU
25 mmØ 1 # 3.50 mm THHN CU
2 2
AIRCONDITION 1
TOTAL
30 AT
1 HP 8.0000 2 # 3.50 mm THHN CU
25 mmØ 1 # 3.50 mm THHN CU
220 AT
1800 7.8261 2 # 3.50 mm THHN CU
20 mmØ 1 # 3.50 mm THHN CU
2 2
25 mmØ 2 # 2.00 mm THHN CU
15 mmØ
2
2 # 8.0 mm THHN CU 32 mmØ 1 # 3.50 mm THHN CU
2 2 2
34.2609
SCHEDULE OF LOADS RISER DIAGRAM LEGENDS
GENERAL NOTES
DR. EDMUNDO C. TUÑGOL
BATAAN PENINSULA STATE UNIVERSITY
COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)
(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN
AT DINALUPIHAN CAMPUS
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
PROJECT TITLE:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
9.00
11.00 11.00
6.00
5.50 5.50 5.50
5.50 5.50 5.50
11.00
22.00
2.00
3.00 1.50 3.00
2.75 2.75
22.00
3.00
5.50
5.50
11.00
2.00
1.50 9.00
RISER PIPE wc
wc wc ur
lav lav TAP
TO NEAREST WATER LINE SYSTEM
WATER LINE LAYOUT
P1
GROUND FLOOR PLAN
P
DR. EDMUNDO C. TUÑGOL
BATAAN PENINSULA STATE UNIVERSITY
COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)
(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN
AT DINALUPIHAN CAMPUS
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
CHECKED BY:
PROJECT TITLE:
BATAAN PENINSULA STATE UNIVERSITY
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
PREPARED BY:
REVIEWED BY:
SHEET NUMBER:
11.00 11.00
22.00
5.50 5.50 5.50
4.50 4.50 9.00
5.50 5.50 5.50 5.50
11.00 11.00
22.00
1.65 4.35
4.00 1.50
3.00
wc wc
lav ur ur
lav RISER PIPE
WATER LINE LAYOUT
P2
SECOND FLOOR PLAN
DR. EDMUNDO C. TUÑGOL
BATAAN PENINSULA STATE UNIVERSITY
COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)
(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN
AT DINALUPIHAN CAMPUS
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
9.00 6.00
11.00 11.00
5.50 5.50
5.50
5.50
11.00
22.00
5.50 5.50
2.00
3.00 3.00 1.50
2.75 2.75
3.00
22.00
5.50
11.00 5.50
9.00
2.00
1.50
RISER PIPE RISER PIPE lav
fd
wc fd lav
ur
wc wc
fd fd fd
EXISTING SEPTIC TANK
CB CB
CB
CB CB
TO NEAREST PUBLIC SEWER
LINE CB
CB
CB CB
CB CB
TO NEAREST PUBLIC SEWER LINE
co
TO NEAREST PUBLIC SEWER LINE
co co co
SANITARY LAYOUT
P3
GROUND FLOOR PLAN
DR. EDMUNDO C. TUÑGOL
BATAAN PENINSULA STATE UNIVERSITY
(P.E BLDG. AND COVERED COURT)
(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN
AT DINALUPIHAN CAMPUS
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
PROJECT TITLE:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
11.00 11.00
22.00
5.50 5.50 5.50
4.50 4.50 9.00
5.50 5.50 5.50 5.50
11.00 11.00
22.00
1.65 4.35
4.00 1.50
3.00
lav ur ur
fd fd
wc wc lav
RISER PIPE RISER PIPE
co co
SANITARY LAYOUT
P4
SECOND FLOOR PLAN
DR. EDMUNDO C. TUÑGOL
BATAAN PENINSULA STATE UNIVERSITY
COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)
(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN
AT DINALUPIHAN CAMPUS
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
11.00
22.00
6.00
9.00
5.50 5.50 5.50 5.50
4.50 4.50 9.00
5.50 5.50 5.50 5.50
11.00 11.00
22.00 fd fd
fd
fd fd fd fd
fd fd fd
fd
CB
TO CATCH BASIN TO CATCH BASIN
TO CATCH BASIN
TO CATCH BASIN TO CATCH BASIN TO CATCH BASIN
TO CATCH BASIN TO CATCH BASIN
TO CATCH BASIN TO CATCH BASIN
TO CATCH BASIN
CB CB CB CB CB
CB CB CB
CB
CB
slope slope
slope slope slope
slope
slope slope
slope
slope
fd
3.00
SANITARY LAYOUT
P5
ROOF DECK PLAN
DR. EDMUNDO C. TUÑGOL
BATAAN PENINSULA STATE UNIVERSITY
(P.E BLDG. AND COVERED COURT)
(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN
AT DINALUPIHAN CAMPUS
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
REVISION
NO. DESCRIPTION
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA
PREPARED BY:
ARCHITECT II, TWG CONSULTANT REVIEWED BY:
UNIVERSITY PRESIDENT APPROVED BY:
RECOMMENDED BY:
2
DATE
AR. ROXETTE S. UMEREZ
CHECKED BY:
PROJECT TITLE:
AR. DANILO Y. GALURA
SHEET NUMBER:
9.00
11.00
11.00 6.00
5.50
5.50
5.50 5.50
5.50
5.50 11.00
22.00
2.00
3.00 1.50
3.00 2.75
2.75 22.00
3.00
5.50
5.50
11.00
2.00
1.50 9.00 RISER PIPE
wc wc wc
ur lav
lav TO TAP
NEAREST WATER SYSTEM LINE
WATER LINE LAYOUT (ISOMETRIC)
P6
GROUND FLOOR PLAN
DR. EDMUNDO C. TUÑGOL
BATAAN PENINSULA STATE UNIVERSITY
COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)
(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN
AT DINALUPIHAN CAMPUS
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
11.00
11.00 22.00
5.50
5.50
5.50
4.50
4.50
9.00 5.50
5.50
5.50
5.50 11.00
11.00 22.00
1.65
4.35
4.00 1.50
3.00
wc wc lav
ur
ur lav RISER PIPE
WATER LINE LAYOUT (ISOMETRIC)
P7
SECOND FLOOR PLAN
DR. EDMUNDO C. TUÑGOL
BATAAN PENINSULA STATE UNIVERSITY
(P.E BLDG. AND COVERED COURT)
(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN
AT DINALUPIHAN CAMPUS
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
PROJECT TITLE:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
9.00
11.00 11.00
6.00
5.50
5.50
5.50
5.50 5.50
22.00 11.00
5.50
1.50
3.00
2.00
3.00 2.75
2.75 22.00
3.00
5.50
5.50
11.00
2.00
1.50 9.00 RISER PIPE RISER PIPE
lav fd lav
wc fd ur
wc
wc fd fd
fd EXISTING SEPTIC TANK
NEAREST TO PUBLIC SEWER LINE
CB
CB
CB
CB
CB
CB
CB CB
CB
CB
CB
NEAREST TO PUBLIC SEWER LINE
NEAREST TO PUBLIC SEWER
LINE co
co co co
SANITARY LAYOUT (ISOMETRIC)
P8
GROUND FLOOR PLAN
DR. EDMUNDO C. TUÑGOL
BATAAN PENINSULA STATE UNIVERSITY
COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)
(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN
AT DINALUPIHAN CAMPUS
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
11.00
11.00 22.00
5.50
5.50
5.50
4.50
4.50
9.00 5.50
5.50
5.50
5.50 11.00
11.00 22.00
1.65
4.35
4.00 1.50
3.00
lav ur
ur fd
fd wc
wc lav
RISER PIPE RISER PIPE co co
SANITARY LAYOUT (ISOMETRIC)
P9
SECOND FLOOR PLAN
DR. EDMUNDO C. TUÑGOL
BATAAN PENINSULA STATE UNIVERSITY
(P.E BLDG. AND COVERED COURT)
(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN
AT DINALUPIHAN CAMPUS
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
PROJECT TITLE:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
11.00
22.00 6.00
9.00
5.50
5.50
5.50
5.50
4.50
4.50
9.00 5.50
5.50
5.50
5.50 11.00
11.00 22.00
fd fd
fd
fd
fd
fd
fd
fd
fd fd
fd
CB
TO CATCH BASIN
TO CATCH BASIN
TO CATCH BASIN TO CATCH BASIN
TO CATCH BASIN
TO CATCH BASIN
TO CATCH BASIN TO CATCH BASIN
TO CATCH BASIN TO CATCH BASIN
TO CATCH BASIN
CB
CB
CB
CB
CB
CB
CB CB
CB CB
slope
slope
slope
slope
slope slope
slope
slope
slope
slope fd
3.00
SANITARY LAYOUT (ISOMETRIC)
P10
ROOF DECK PLAN
DR. EDMUNDO C. TUÑGOL
BATAAN PENINSULA STATE UNIVERSITY
COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)
(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN
AT DINALUPIHAN CAMPUS
WALL FINISH SCHEDULE
FLOOR FINISH SCHEDULE PARTITION SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE RECOMMENDED BY:
APPROVED BY:
REVISION
NO.
2
DESCRIPTION DATE
LOCATION:
SHEET CONTENT:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
CHECKED BY:
PREPARED BY:
ARCHITECT II, TWG CONSULTANT REVIEWED BY:
AR. DANILO Y. GALURA
SHEET NUMBER:
1.25 12.25
3.55
STAGE
(60cm X 60 cm FLOOR TILES) SUBMIT SAMPLE FOR APPROVAL
5.00
1.25
0.34
12.55
3.55
14.75
7.25 7.25
DRESSING ROOM/STORAGE OFFICE
CR AA
BB
D 1
D
1 D
1
D 1 W
1
W 1 W
2 W
1
D 2
1 2 3 4
A
C
B (8.25 sq.m)
+0.75
+0.65
(58.30 sq.m)
up up
1.60
3.25 7.70
1.45 2.25
(2.32 sq.m)
+0.75
up
(20.44 sq.m)
+0.75
3.70
1.20
GROUND FLOOR PLAN PERSPECTIVE
DR. EDMUNDO C. TUÑGOL
F-8 F-3
F-1 F-1
P P 9
9
P 9
P 9
P 4
9 P
9 P 9
P
BATAAN PENINSULA STATE UNIVERSITY
(P.E BLDG. AND COVERED COURT)
(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN
AT DINALUPIHAN CAMPUS
FLOOR FINISH SCHEDULE WALL FINISH SCHEDULE PARTITION SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
DR. GREGORIO J. RODIS
UNIVERSITY PRESIDENT VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:
RECOMMENDED BY:
REVISION
2
DESCRIPTION
NO. DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
CHECKED BY:
PREPARED BY:
PROJECT TITLE:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
FRONT ELEVATION REAR ELEVATION
A2
DR. EDMUNDO C. TUÑGOL
0.75
NGL
ELEV.: +0.00m
GROUND FLOOR FINISH
ELEV.: .75m
4.82
ROOF APEX
ELEV.: 4.82m
SLIDING WINDOW AWNING WINDOW
PLAIN CEMENT PLASTER FIN.
2"X4" TUBULAR BAR
SLIDING WINDOW
CANOPY
0.75
NGL
ELEV.: +0.00m
GROUND FLOOR FINISH
ELEV.: .75m
4.82
ROOF APEX
ELEV.: 4.82m
PANEL DOOR
TRACKLIGHT
2"X4" TUBULAR BAR
PLAIN CEMENT PLASTER FIN.
DECO. STONE
W 4
W 1
W 1
W 1
W 4 W
1
W 1
BATAAN PENINSULA STATE UNIVERSITY
COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)
(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN
AT DINALUPIHAN CAMPUS
FLOOR FINISH SCHEDULE WALL FINISH SCHEDULE PARTITION SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
UNIVERSITY PRESIDENT APPROVED BY:
RECOMMENDED BY:
NO.
REVISION
2
DATE DESCRIPTION
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
CHECKED BY:
PREPARED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
0.75
NGL
ELEV.: +0.00m
GROUND FLOOR FINISH
ELEV.: .75m
4.82
ROOF APEX
ELEV.: 4.82m
DRESSING ROOM/
STORAGE
0.75
NGL
ELEV.: +0.00m
GROUND FLOOR FINISH
ELEV.: .75m
4.82
ROOF APEX
ELEV.: 4.82m
OFFICE DRESSING ROOM/STORAGE
0.75
NGL
ELEV.: +0.00m
GROUND FLOOR FINISH
ELEV.: .75m
4.82
ROOF APEX
ELEV.: 4.82m PANEL DOOR
2"X4" TUBULAR BAR
PLAIN CEMENT PLASTER FIN.
CANOPY
0.75
NGL
ELEV.: +0.00m
GROUND FLOOR FINISH
ELEV.: .75m
4.82
ROOF APEX
ELEV.: 4.82m
PANEL DOOR
2"X4" TUBULAR BAR
PLAIN CEMENT PLASTER FIN.
CANOPY
RIGHT SIDE ELEVATION LEFT SIDE ELEVATION
A3
SECTION THRU A-A SECTION THRU B-B
DR. EDMUNDO C. TUÑGOL
W 4
W 1
W 4 W
1
W
1 W
1
BATAAN PENINSULA STATE UNIVERSITY
(P.E BLDG. AND COVERED COURT)
(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN
AT DINALUPIHAN CAMPUS
FLOOR FINISH SCHEDULE WALL FINISH SCHEDULE PARTITION SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE RECOMMENDED BY:
APPROVED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
CHECKED BY:
PREPARED BY:
PROJECT TITLE:
ARCHITECT II, TWG CONSULTANT
SHEET NUMBER:
AR. DANILO Y. GALURA
REVIEWED BY:
FRONT ELEVATION REAR ELEVATION
A4
DR. EDMUNDO C. TUÑGOL
W 1
W 2
1.20
1.20 0.90
0.60
0.60 1.50
2.10
1.00
D 1
0.70
2.10
D 2
BATAAN PENINSULA STATE UNIVERSITY
COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)
(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN
AT DINALUPIHAN CAMPUS
FLOOR FINISH SCHEDULE WALL FINISH SCHEDULE PARTITION SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
ADDITIONAL COLUMN & TRUSS PROPOSED NEW STAGE
5.40 5.90
5.90 5.90
5.90 5.90
6.00
40.90
5.40 5.90
5.90 5.90
5.90 5.90
6.00
40.90
17.00
17.00 EXISTING COVERED COURT
(EXISTING) COVERED COURT PLAN
A5
DR. EDMUNDO C. TUÑGOL
BATAAN PENINSULA STATE UNIVERSITY
(P.E BLDG. AND COVERED COURT)
(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN
AT DINALUPIHAN CAMPUS
FLOOR FINISH SCHEDULE WALL FINISH SCHEDULE PARTITION SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
PROJECT TITLE:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
5.40 5.90
5.90 5.90
5.90 5.90
6.00
40.90
5.40 5.90
5.90 5.90
5.90 5.90
6.00
40.90
17.00
17.00 EXISTING COVERED COURT
STAGE (60cm X 60 cm FLOOR TILES) SUBMIT SAMPLE FOR APPROVAL
(PROPOSED)
COVERED COURT PLAN
A6
DR. EDMUNDO C. TUÑGOL
BATAAN PENINSULA STATE UNIVERSITY
COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)
(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN