• Tidak ada hasil yang ditemukan

N S E W

N/A
N/A
Protected

Academic year: 2023

Membagikan "N S E W"

Copied!
41
0
0

Teks penuh

(1)

PERSPECTIVE

BATAAN PENINSULA STATE UNIVERSITY

COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)

(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUÑGOL

BATAAN PENINSULA STATE UNIVERSITY

APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

1 2 3 4

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

MECHANICAL ELECTRICAL

SANITARY STRUCTURAL ARCHITECTURAL

LINE & GRADE LAND USE & ZONING

DISTRICT/CITY/MUNICIPALITY

DEPARTMENT OF PUBLIC WORKS & HIGHWAYS REPUBLIC OF THE PHILIPPINES OFFICE OF THE BUILDING OFFICIAL

ELECTRONICS SCHEDULE SHEET

ARCHITECTURAL

COLLEGE BUILDING STUDENT

CENTER BUSINESS CENTER

CR

SEPTIC TANK

GUARD HOUSE

PATHWALK

S T U D Y S H E D S

SHED SHED SHED

COVERED COURT

NSTP

DUMP

CANTEEN HIGH SCHOOL

BUILDING STAGE

FLAG POLE

S T U D Y S H E D S

CARPENTRY/OFFICE SHOP OF THE CAMPUS DIRECTOR

OPEN FIELD COURT

MANHOLE

MANHOLE

MANHOLE

MANHOLE

MANHOLE

MANHOLE

MANHOLE MANHOLE

MANHOLE

ELECTRIC POST ELECTRIC

POST

ELECTRIC POST

ELECTRIC POST MANHOLE

NATIONAL ROAD EXISTING CYCLONE

WIRE FENCE

BPSU BOUNDARY LINE

PATH WALK ADMINISTRATION BUILDING PRESIDENT'S OFFICE CAMPUS DIRECTOR'S

OFFICE

LEARNING AND RESOURCE CENTER/ OSA EXISTING CHB WALL

PERIMETER FENCE

MAIN GATE

PROPOSED PE ROOM

SITE

A

SITE

MUNICIPAL PARK

JOSE C. PAYUMO JR.

MEMORIAL HOSPITAL CHOWKING

LA VERCONS BAKESHOP

ZAMBALES RURAL BANK, INC. DINALUPIHAN BRANCH

MUNICIPAL HALL

7-ELEVEN LANDBANK

ANGELES-PORAC-FLORIDA BLANCA SAN RAMON

PARISH CHURCH SAN JUAN ST.

BPSU

SHEET NUMBER:

SITE DEVELOPMENT PLAN

VICINITY MAP A1

AT DINALUPIHAN CAMPUS

(2)

AA

5.50 5.50 5.50 5.50

11.00 11.00

22.00 2.00

3.00 1.50 1.50 3.00 9.00

W 3

CR

(FEMALE)

CR

(MALE)

EXISTING PHASE 1 EXISTING PHASE 1

BB

W 3

D 3 D

3 D

2

D 2

D 3

Landing up

1 2

up Landing

3 4 5 6 7 8 9

11.00 23.50

5.50 2.00

3.50 2.75

2.75 5.50

3.15

6.00 3.00 2.25

2.25

A

B

C

E D

F

1.50

12.50

(8.25 sq.m) (8.25 sq.m)

+0.10 +0.10

+1.95

+1.95

WALL WALL

1.50 9.00

2.85

3.75 3.75

FLOOR FINISH SCHEDULE WALL FINISH SCHEDULE PARTITION SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

PROJECT TITLE:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

GROUND FLOOR PLAN

F-3 F-3

P 8

DR. EDMUNDO C. TUÑGOL

P 6

BATAAN PENINSULA STATE UNIVERSITY

COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)

(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN

AT DINALUPIHAN CAMPUS

(3)

BB

11.00

5.50 5.50 5.50

9.00

5.50 5.50 5.50 5.50

11.00 11.00

22.00

3 4 5 6 9

MUSIC ROOM

DANCE ROOM

D 1

W W

1 1

2

W W

1 1

W 2 W

TO

ROOF DECK

up

down

W

2

3 W 3

D 2 COMMON

CR

COMMON CR D

1 D

Landing Landing

W 4

AA

D 1

1 2 7 8

A

B

C

D

E

F

Landing down

+1.95

2.25

WALL WALL WALL

WALL

3.00 2.25

1.50

11.00

23.50

1.50

4.50 4.50

1.65 1.20

+3.90

Landing

(66 sq. m)

(99 sq. m)

+1.95 +3.90

+5.55

+4.00

+4.00

MIRROR MIRROR MIRROR

(3.30 sq.m)

2.00 2.00

1.50

(3.30 sq.m)

+3.90 +3.90

RAILINGS RAILINGS

RAILINGS

H A L L W A Y

9.00

3.15

3.75 3.75

FLOOR FINISH SCHEDULE WALL FINISH SCHEDULE PARTITION SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUÑGOL

APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

SECOND FLOOR PLAN P

8

F-3 F-3

P 6

P 8

P

8 P

8 P

8 P

P 6 4

P 8

P 8

P 8

F-3

F-7

BATAAN PENINSULA STATE UNIVERSITY

(P.E BLDG. AND COVERED COURT)

(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN

AT DINALUPIHAN CAMPUS

(4)

PARTITION SCHEDULE

FLOOR FINISH SCHEDULE WALL FINISH SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

PROJECT TITLE:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

4.50 4.50 9.00

5.50 5.50 5.50 5.50

11.00 11.00

22.00

3 4 5 7 9

ROOF DECK

RAILINGS RAILINGS

RAILINGS RAILINGS

RAILINGS RAILINGS

RAILINGS

RAILINGS RAILINGS

RAILINGS RAILINGS

Landing down

AA BB

3.00

5.50 5.50

11.00 11.00

5.50 5.50

1

B A

C

D

E

F

2 6 8

(165 sq. m)

+5.55

+7.30

+7.35

down

6.00

ROOF DECK PLAN P

9 P

9

P

9 P

9

9 P

9 P

9 P

9 P 9

P

P 9

P 9 F-7

BATAAN PENINSULA STATE UNIVERSITY

COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)

(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN

AT DINALUPIHAN CAMPUS

(5)

FLOOR FINISH SCHEDULE WALL FINISH SCHEDULE PARTITION SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

3.40 3.90 1.30 1.20

0.25

TOP OF ROOF BEAM

ELEV.: 8.60m

SECOND FLOOR FINISH

ELEV.: 5.20m

GROUND FLOOR FINISH

ELEV.: 1.30m

NGL

ELEV.: +0.00m

MOULDING CANOPY

CANOPY

AWNING WINDOW

RAILINGS RAILINGS RAILINGS RAILINGS

PANEL DOOR

3.40 3.90 1.30 1.20

0.25

TOP OF ROOF BEAM

ELEV.: 8.60m

SECOND FLOOR FINISH

ELEV.: 5.20m

GROUND FLOOR FINISH

ELEV.: 1.30m

NGL

ELEV.: +0.00m

MOULDING CANOPY

CANOPY

AWNING WINDOW

RAILINGS RAILINGS RAILINGS RAILINGS

PANEL DOOR

TOP OF ROOF DECK RAILINGS

ELEV.: 9.80m

LAMP

3.40 3.90 1.30 1.20 TOP OF ROOF BEAM

ELEV.: 8.60m

SECOND FLOOR FINISH

ELEV.: 5.20m

GROUND FLOOR FINISH

ELEV.: 1.30m

NGL

ELEV.: +0.00m

AWNING WINDOW SLIDING WINDOW

RAILINGS RAILINGS RAILINGS RAILINGS

PANEL DOOR CANOPY TOP OF ROOF DECK RAILINGS

ELEV.: 9.80m

WALL LAMP

A5

FRONT ELEVATION REAR ELEVATION

DR. EDMUNDO C. TUÑGOL

W 1

W 1 W

1 W

4 W

1

W 4

DECO. STONE

W 4

W 1

W

1 W

4

W 1

W 1

W 4

BATAAN PENINSULA STATE UNIVERSITY

(P.E BLDG. AND COVERED COURT)

(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN

AT DINALUPIHAN CAMPUS

(6)

FLOOR FINISH SCHEDULE WALL FINISH SCHEDULE PARTITION SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

PROJECT TITLE:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

TOP OF ROOF BEAM

ELEV.: 8.60m

SECOND FLOOR FINISH

ELEV.: 5.20m

GROUND FLOOR FINISH

ELEV.: 1.30m

NGL

ELEV.: +0.00m

3.40 3.90 0.25

1.30 1.20

RAILINGS RAILINGS

EXISTING SLIDING WINDOW EXISTING PANEL DOOR DECO. STONE

METAL SIGNAGE (NAME PLATE)

STAIRS

TOP OF ROOF DECK RAILINGS

ELEV.: 9.80m

MOULDING GRILLS

GREEN WALL LAMP

TOP OF ROOF BEAM

ELEV.: 8.60m

SECOND FLOOR FINISH

ELEV.: 5.20m

GROUND FLOOR FINISH

ELEV.: 1.30m

NGL

ELEV.: +0.00m

3.40 3.90 1.30 1.20

PANEL DOOR WINDOWED

RAILINGS RAILINGS

STAIRS

TOP OF ROOF DECK RAILINGS

ELEV.: 9.80m

RAILINGS

STAIRS CANOPY

EXISTING SLIDING WINDOW LAMP

A6

RIGHT SIDE ELEVATION LEFT SIDE ELEVATION

DR. EDMUNDO C. TUÑGOL

W

1 W

4

W 1

W 1

W 4

W 1

BATAAN PENINSULA STATE UNIVERSITY

COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)

(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN

AT DINALUPIHAN CAMPUS

(7)

FLOOR FINISH SCHEDULE WALL FINISH SCHEDULE PARTITION SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

3.40 3.90 1.30 1.20

0.25

TOP OF ROOF BEAM

ELEV.: 8.60m

SECOND FLOOR FINISH

ELEV.: 5.20m

GROUND FLOOR FINISH

ELEV.: 1.30m

NGL

ELEV.: +0.00m

MUSIC ROOM DANCE ROOM

3 4 5 7 9

RAILINGS RAILINGS RAILINGS RAILINGS

2

TOP OF ROOF DECK RAILINGS

ELEV.: 9.80m

1.20 1.30 3.90 3.40

MUSIC ROOM COMMON

STAIRS CR

CR (Female)

TOP OF ROOF BEAM

ELEV.: 8.60m

SECOND FLOOR FINISH

ELEV.: 5.20m

GROUND FLOOR FINISH

ELEV.: 1.30m

NGL

ELEV.: +0.00m

B C D F

RAILINGS RAILINGS

A

TOP OF ROOF DECK RAILINGS

ELEV.: 8.60m

A7

SECTION THRU A-A SECTION THRU B-B

DR. EDMUNDO C. TUÑGOL

BATAAN PENINSULA STATE UNIVERSITY

(P.E BLDG. AND COVERED COURT)

(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN

AT DINALUPIHAN CAMPUS

(8)

FLOOR FINISH SCHEDULE WALL FINISH SCHEDULE PARTITION SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

PROJECT TITLE:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

FFL

1.50

3.20 0.80

0.80

TYPE: GLASS, SLIDING WINDOW

LOCATION: MUSIC ROOM & DANCE ROOM 2 SETS

REMARKS : AS PER MANUFACTURERS

W 2

TYPE: GLASS, AWNING WINDOW

LOCATION: COMFORT ROOMS 4 SETS

REMARKS : AS PER MANUFACTURERS

W 3

TYPE: GLASS, AWNING WINDOW

LOCATION: MUSIC ROOM & DANCE ROOM 4 SETS

REMARKS : AS PER MANUFACTURERS 3.20

W

1.50

1

0.60 0.60 1.30

TYPE: GLASS,SLIDING WINDOW

LOCATION: DANCE ROOM 1 SET

REMARKS : AS PER MANUFACTURERS

1.50

1.60

0.60 W

4

FFL 2.10 2.10

1.00 0.80 0.60

2.10

D 1

TYPE: PANEL DOOR

WINDOWED, SWING

LOCATION: MUSIC ROOM & DANCE ROOM

3 SETS

REMARKS : AS PER MANUFACTURERS

D 2

TYPE: PANEL DOOR, SWING

LOCATION: COMFORT ROOMS 4 SETS

REMARKS : AS PER MANUFACTURERS

D 3

TYPE: uPVC DOOR

LOCATION: TOILET CUBICLES 3 SETS

REMARKS : AS PER MANUFACTURERS

SCHEDULE OF DOORS AND WINDOWS

DR. EDMUNDO C. TUÑGOL

BATAAN PENINSULA STATE UNIVERSITY

COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)

(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN

AT DINALUPIHAN CAMPUS

(9)

FLOOR FINISH SCHEDULE WALL FINISH SCHEDULE PARTITION SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

10

11

12

13

0.25

0.15

RUN

RISE

0.1250 Landing down

+1.95

RAILINGS

1.20

1.50

+3.90

RAILINGS 0.25

RAILINGS RAILINGS

3.00 1.50 3.00

3.00

9.00

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

up

down Landing

Landing

WALL WALL WALL

Landing +1.95

+3.90

+5.55

2.25

1.00 1.00

2.00

3.50 3.00 4.25

2.50 1.75 2.75 2.00

0.25 10.75

11.00

+7.35

1 2 3 4 5 6 7 8 9 10 11 12 13

14 15 16 17 18 19 20 21 22 23 24 25

31 30 29 28 27

26 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

TO ROOF DECK

STAIRS PLAN 1 STAIRS PLAN 2 STAIRS DETAIL

DR. EDMUNDO C. TUÑGOL

BATAAN PENINSULA STATE UNIVERSITY

(P.E BLDG. AND COVERED COURT)

(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN

AT DINALUPIHAN CAMPUS

(10)

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

PROJECT TITLE:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

RB1 RB1

RB1 RB1

RB1

RB1 RB1 RB1 RB1

RB1

100mm THICK REINFORCED CONCRETE SLAB WITH 10mmØ REBARS @ 400mm O.C. B.W.

RB1 RB1 RB1

RB2 RB1 RB1

RB2 RB2

RB1

RB1 RB1

RB1 RB1

RB1 RB1

C1

C1 C1 C1

C1 C1 C1

C1

C1 C1

C1 C1

5.50 5.50 5.50 5.50

6.00 3.00 4.50 4.50

5.50 5.50 5.50 5.50

22.00

9.00

22.00

9.00

3 4 5 7 9

1.50

B

C

D

F

ROOF DECK FRAMING PLAN

S

DR. EDMUNDO C. TUÑGOL

BATAAN PENINSULA STATE UNIVERSITY

COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)

(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN

AT DINALUPIHAN CAMPUS

(11)

SHEET NUMBER:

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

UNIVERSITY PRESIDENT VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

DR. GREGORIO J. RODIS

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

SUPPORT

MIDSPAN

MIDSPAN SUPPORT

MARK

WIDTH

(mm)

DEPTH

(mm)

LEFT MID RIGHT

10mm STIRRUPs

(DIAMETER, SPACING)

RB1 400

RB2 450

BEAM SCHEDULE

DIMENSION MAIN REINFORCEMENT

1 @ 50mm 10 @ 100mm REST @ 200MM O.C.

200

200

5 - 20mm Ø 3 - 20mm Ø

1 @ 50mm 10 @ 100mm REST @ 200MM O.C.

5 - 20mm Ø 3 - 20mm Ø

SUPPORT SUPPORT

5 - 20mm Ø 3 - 20mm Ø

5 - 20mm Ø 3 - 20mm Ø 3 - 20mm Ø

5 - 20mm Ø 3 - 20mm Ø 5 - 20mm Ø

MARK WIDTH

(mm)

DEPTH

(mm) SECTION REINFORCEMENT BARS

STIRRUP - TIES

SIZE SPACING (FROM EACH END)

C1

1 @ 50mm 3 @ 100mm 3 @ 150mm REST @ 200MM O.C.

300 300 8 - 16mm Ø 10mm Ø

C2

1 @ 50mm 3 @ 100mm 3 @ 150mm REST @ 200MM O.C.

10mm Ø

COLUMN SCHEDULE

200 300 6 - 16mm Ø

400 mm

400 mm 200 mm

400 mm

200 mm

200 mm

450 mm 450 mm

ROOF DECK FRAMING PLAN

S2

DR. EDMUNDO C. TUÑGOL

BATAAN PENINSULA STATE UNIVERSITY

(P.E BLDG. AND COVERED COURT)

(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN

AT DINALUPIHAN CAMPUS

(12)

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

PROJECT TITLE:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

9.00

11.00 11.00

6.00

5.50 5.50 5.50

5.50 5.50 5.50

11.00

22.00

2.00

3.00 1.50 3.00

2.75 2.75

22.00

3.00

5.50

5.50

11.00

2.00

1.50 9.00

TO EXISTING

PANEL BOARD 1

GROUND FLOOR LIGHTING LAYOUT

E

DR. EDMUNDO C. TUÑGOL

BATAAN PENINSULA STATE UNIVERSITY

COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)

(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN

AT DINALUPIHAN CAMPUS

(13)

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

11.00 11.00

22.00

5.50 5.50 5.50

4.50 4.50 9.00

5.50 5.50 5.50 5.50

11.00 11.00

22.00

1.65 4.35

4.00 1.50

3.00

1

1

SECOND FLOOR LIGHTING LAYOUT

E2

DR. EDMUNDO C. TUÑGOL

BATAAN PENINSULA STATE UNIVERSITY

(P.E BLDG. AND COVERED COURT)

(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN

AT DINALUPIHAN CAMPUS

(14)

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

PROJECT TITLE:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

11.00 11.00

22.00

3.00 6.00

9.00

5.50 5.50 5.50 5.50

4.50 4.50 9.00

5.50 5.50 5.50 5.50

11.00 11.00

22.00

2

ROOF DECK LIGHTING LAYOUT

E3

DR. EDMUNDO C. TUÑGOL

BATAAN PENINSULA STATE UNIVERSITY

COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)

(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN

AT DINALUPIHAN CAMPUS

(15)

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

11.00 11.00

22.00

5.50 5.50 5.50

4.50 4.50 9.00

5.50 5.50 5.50 5.50

11.00 11.00

22.00

1.65 4.35

4.00 1.50

3.00

2

3 4

4 3

5

SECOND FLOOR POWER LAYOUT

E4

DR. EDMUNDO C. TUÑGOL

BATAAN PENINSULA STATE UNIVERSITY

(P.E BLDG. AND COVERED COURT)

(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN

AT DINALUPIHAN CAMPUS

(16)

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

PROJECT TITLE:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

SCHEDULE & COMPUTATION OF LOADS

LIGHTING OUTLET 12 230 1200 15 AT 2 # 2.00 mm THHN CU

15 mmØ

2

DESCRIPTION NO. OF

OUTLET VOLTS WATTS AMPERE

PER CKT.

PROTECTION PER CKT.

SIZE OF WIRE/

CONDUITS CKT.

NO.

30 AT

1 230 1 HP

30 AT 230 1 HP

20 AT

5 230 1800

1 2 3 4 5

PANEL BOARD (MUSIC ROOM)

5.2174

7.8261 8.0000

AIRCONDITION 8.0000 2 # 3.50 mm THHN CU

25 mmØ 1 # 3.50 mm THHN CU

2 2

AIRCONDITION 1 2 # 3.50 mm THHN CU

25 mmØ 1 # 3.50 mm THHN CU

2 2

CONVENIENCE OUTLET 2 # 3.50 mm THHN CU

20 mmØ 1 # 3.50 mm THHN CU

2 2

SPARE

TOTAL

230 20 AT 25 mmØ

29.0435 40 AT 2 # 8.0 mm THHN CU 32 mmØ 1 # 3.50 mm THHN CU

2 2

6 SPARE 230 20 AT 25 mmØ

LEGEND

ACO

DESCRIPTION

PANEL BOARD

LIGHTING OUTLET

AIR CONDITIONING OUTLET

N CIRCUIT HOMERUN

SINGLE GANG SWITCH

S1

CONVENIENCE OUTLET

THREE GANG SWITCH

S3

CIRCUIT LINE

h. REFRIGERATOR OUTLET

0.50m A.F.F.

g. RANGE OUTLET

1.10m A.F.F.

f. GROUND FAULT INTERRUPTER

SHALL BE ELECTRICAL METALLIC CONDUIT (EMT).

CROWN SUPREME SCH. 40

CLIPSAL C-CONCEPT / NATIONAL WIDE SERIES FUMACO

PHILFLEX OR APPROVED EQUAL MITSUBISHI/SQUARE D/ABB/SIEMENS

GROUND --- GREEN 2

c. WIRING DEVICES

17. ADDITIONAL MATERIALS SPECIFICATIONS:

b. CIRCUIT BREAKER (BOLT-ON TYPE) d. POLYVINYL CHLORIDE CONDUIT (PVC) e. JUNCTION / UTILITY BOX GA.16 a. WIRES AND CABLES

LINE 2 --- RED LINE 1 --- BLACK

21. WIRES SHALL BE COLOR CODED:

2

0.30m A.F.F.

1.30m A.F.F.

1.10m A.F.F.

1.40m A.F.F. AT CENTER

23. NO REVISION IN THE DESIGN SHALL BE DONE WITHOUT THE PRIOR KNOWLEDGE AND APPROVAL OF THE DESIGNER AND THE OWNER. ANY SUCH REVISION DONE WITHOUT THE APPROVAL SHALL CAUSE 24. ALL WEATHER-EXPOSED INSTALLATIONS SHALL USE WEATHERPROOF TYPE MATERIALS, ESPECIALLY

25. ALL EQUIPMENT WIRE, ROYAL CORDS, SPECIAL TYPE PLUGS AND RECEPTACLE AS REQUIRED 26. ALL ELECTRICAL WORKS SHALL BE DONE UNDER THE DIRECT SUPERVISION OF A DULY LICENSED

WEATHERPROOF CONVENIENCE OUTLET, CAST-BOXES, JUNCTION BOXES SUBMIT SAMPLE FOR APPROVAL.

ELECTRICAL ENGINEER AND / OR MASTER ELECTRICIAN.

SHALL BE PROVIDED BY THE ELECTRICAL CONTRACTOR.

RESPONSIBILITY OF THE DESIGNER TO CEASED AS A WHOLE.

CIRCUIT BREAKER. EACH PANEL WILL BE PROVIDED WITH A TYPEWRITTEN CIRCUIT DIRECTORY.

18. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR THE PROPER IDENTIFICATION AND LABELING OF ALL 16. ALL 30-AMPERES CIRCUIT HOMERUN TO PANELBOARD MORE THAN 30 METERS IN LENGTH

COMPLETE IN ALL ASPECTS AS REQUIRED IN PLANS AND SPECIFICATION AND READY FOR OPERATION.

AND DISTANCES OF EQUIPMENT. THE CONTRACTOR IS HEREBY REQUIRED TO MAKE ADJUSTMENT AT THE JOBSITE AS LOCATIONS, LEVELS AND DISTANCES ARE GOVERNED BY ACTUAL FIELD CONDITIONS.

19. THE JOB SHALL BE EXECUTED IN THE MOST THROUGH PROMPT AND WORKMAN LIKE MANNER, EMPLOYING

20. THE DRAWING AND SPECIFICATIONS ARE INTENDED TO PRESENT A GENERAL LAYOUT AND BROAD OUTLINE STANDARD TOOLS, EQUIPMENT, METHODS AND GOOD ENGINEERING PRACTICES. THE JOB SHALL BE DONE SHALL BE 5.5mm THHN (#10 AWG), UNLESS OTHERWISE SPECIFIED ON PLANS.

OF ITS RATING.

ON PLANS.

b. RECEPTACLES

1. ALL ELECTRICAL WORK SHALL CONFORM TO THE LATEST EDITION THE PHILIPPINE ELECTRICAL AND THE REQUIREMENTS OF LOCAL UTILITY COMPANIES.

WHENEVER REQUIRED AND NECESSARY, ALTHOUGH SUCH BOXES ARE NOT INDICATED 3. MINIMUM SIZE OF WIRE AND CONDUIT SHALL BE 2.0 mm THHN AND 20MM (1/2") NOMINAL DIA.

4. NO BRANCH CIRCUIT WIRING IN LIGHTING AND POWER SHALL HAVE A LOAD MORE THAN 80%

7. FOR EACH SPARE CIRCUIT IN PANELBOARD, PROVIDE AN EMPTY CONDUIT 20MM (3/4") DIA.

RESPECTIVELY. UNLESS OTHERWISE SPECIFIED ON PLANS.

5. LIGHT CONTROL SWITCHES SHALL BE RATED 16 AMPERES, 230 Vac.

6. UNLESS OTHERWISE SPECIFIED PULLBOXES OR JUNCTION BOXES SHALL BE PROVIDED

10. MOUNTING HEIGHTS SHALL BE AS FOLLOWS:

8. ALL MATERIALS AND EQUIPMENT TO BE USED SHALL BE BRAND NEW AND OF APPROVED 9. ALL METAL FRAMES SHALL BE PROPERLY AND ADEQUATELY GROUNDED. GROUND WIRE SHALL

CODE, TO THE RULES AND REGULATIONS OF LOCAL AND NATIONAL AUTHORITIES CONCERNED

d. RANGEHOOD OUTLET e. PANELBOARDS c. COUNTER TOP OUTLET a. LIGHT SWITCHES

TYPE FOR BOTH LOCATION AND PURPOSES.

BE PROVIDED ON ALL EQUIPMENT FEEDER.

TERMINATING TO A COVERED SQUARE BOX.

2. ALL PIPE EMBEDDED IN CONCRETE SHALL BE POLYVINYL CHLORIDE (PVC) AND ALL EXPOSED

SERVICE ENTRANCE SHALL BE 230 VOLTS, SINGLE-PHASE, 2WIRE+GROUND, 60Hz.

22. THERE SHALL BE ONLY ONE SERVICE DROP TO THE PROPOSED BUILDING. SECONDARY 12. ALL FLUORESCENT LAMPS SHALL BE PROVIDED WITH POLYESTER FILLED PRE-HEAT

14. THE CONTRACTOR SHALL SECURE ALL PERMITS AND PAY FEES REQUIRED FOR THE WORKS, AND SHALL FURNISH THE OWNER THROUGH THE ENGINEER'S FINAL CERTIFICATE OF INSPECTION AND APPROVAL FROM PROPER GOVERNMENT AUTHORITIES FOR COMPLETE WORKS.

15. EXPOSED CONDUIT RUN SHALL BE INSTALLED PARALLEL TO OR PERPENDICULAR WITH THE FLOOR AND SUPPORTED BY CLAMPS EVERY 152.4 CM, DIAGONAL RUN SHALL NOT BE ACCEPTED. (THIS IS ALSO APPLICABLE TO CONDUITS RUNNING OVERHEAD INSIDE CEILING ).

AS REQUIRED UNDERFIELD CONDITION

I. ACU's ( WINDOW TYPE ) AS REQUIRED UNDERFIELD CONDITION 0.50m A.F.F.

THERMALLY PROTECTED HIGH POWER BALLAST.

13.DUPLEX RECEPTACLES SHALL BE RATED 10 AMP, 250 VOLTS, ROUNDED SLOT FOR 220 VOLTS AND SPECIAL OUTLETS SHALL BE RATED 15AMP.,250 VOLTS AS REQUIRED.

11.OUTLET BOXES SHALL BE AS FOLLOWS:

LIGHT OUT 1-1/2" DEEP, 4" OCTAGONAL BOX 1 OR 2 WAY ENTRIES 2-1/8" DEEP, 4" OCTAGONAL BOX 3 OR 4 WAY ENTRIES RECEPTACLES AND TELEVISION ANT.

AND TELEPHONE OUT 2-1/8" DEEP, 2"X4" UTILITY BOX 1 OR 2 RACEWAY ENTRIES 1-1/2" DEEP, 4" SQUARE BOX WITH 1-GANG RAISED PLASTIC COVER FOR 3 OR 4 RACEWAY ENTRIES

GENERAL ELECTRICAL NOTES :

1 3

2 4 5

GROUND

15AT 30AT

30AT 20AT

SERVICE ENTRANCE

M

20AT

40 AT

20AT

6

1 3

2 4 5

GROUND

15AT 15AT

30AT 30AT

6

SERVICE ENTRANCE

M

20AT

40 AT

20AT

SCHEDULE & COMPUTATION OF LOADS

LIGHTING OUTLET 12 230 1200 15 AT 2 # 2.00 mm THHN CU

15 mmØ

2

DESCRIPTION NO. OF

OUTLET VOLTS WATTS AMPERE

PER CKT.

PROTECTION PER CKT.

SIZE OF WIRE/

CONDUITS CKT.

NO.

12 230 12 15AT

30 AT 230 1 HP

230 1

2 3 4 5

PANEL BOARD (DANCE ROOM)

5 230

5.2174

8.0000

6 20 AT

CONVENIENCE OUTLET

230

40 AT SPARE

LIGHTING OUTLET 5.2174

AIRCONDITION 1 2 # 3.50 mm THHN CU

25 mmØ 1 # 3.50 mm THHN CU

2 2

AIRCONDITION 1

TOTAL

30 AT

1 HP 8.0000 2 # 3.50 mm THHN CU

25 mmØ 1 # 3.50 mm THHN CU

2

20 AT

1800 7.8261 2 # 3.50 mm THHN CU

20 mmØ 1 # 3.50 mm THHN CU

2 2

25 mmØ 2 # 2.00 mm THHN CU

15 mmØ

2

2 # 8.0 mm THHN CU 32 mmØ 1 # 3.50 mm THHN CU

2 2 2

34.2609

SCHEDULE OF LOADS RISER DIAGRAM LEGENDS

GENERAL NOTES

DR. EDMUNDO C. TUÑGOL

BATAAN PENINSULA STATE UNIVERSITY

COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)

(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN

AT DINALUPIHAN CAMPUS

(17)

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

PROJECT TITLE:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

9.00

11.00 11.00

6.00

5.50 5.50 5.50

5.50 5.50 5.50

11.00

22.00

2.00

3.00 1.50 3.00

2.75 2.75

22.00

3.00

5.50

5.50

11.00

2.00

1.50 9.00

RISER PIPE wc

wc wc ur

lav lav TAP

TO NEAREST WATER LINE SYSTEM

WATER LINE LAYOUT

P1

GROUND FLOOR PLAN

P

DR. EDMUNDO C. TUÑGOL

BATAAN PENINSULA STATE UNIVERSITY

COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)

(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN

AT DINALUPIHAN CAMPUS

(18)

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

CHECKED BY:

PROJECT TITLE:

BATAAN PENINSULA STATE UNIVERSITY

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

PREPARED BY:

REVIEWED BY:

SHEET NUMBER:

11.00 11.00

22.00

5.50 5.50 5.50

4.50 4.50 9.00

5.50 5.50 5.50 5.50

11.00 11.00

22.00

1.65 4.35

4.00 1.50

3.00

wc wc

lav ur ur

lav RISER PIPE

WATER LINE LAYOUT

P2

SECOND FLOOR PLAN

DR. EDMUNDO C. TUÑGOL

BATAAN PENINSULA STATE UNIVERSITY

COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)

(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN

AT DINALUPIHAN CAMPUS

(19)

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

9.00 6.00

11.00 11.00

5.50 5.50

5.50

5.50

11.00

22.00

5.50 5.50

2.00

3.00 3.00 1.50

2.75 2.75

3.00

22.00

5.50

11.00 5.50

9.00

2.00

1.50

RISER PIPE RISER PIPE lav

fd

wc fd lav

ur

wc wc

fd fd fd

EXISTING SEPTIC TANK

CB CB

CB

CB CB

TO NEAREST PUBLIC SEWER

LINE CB

CB

CB CB

CB CB

TO NEAREST PUBLIC SEWER LINE

co

TO NEAREST PUBLIC SEWER LINE

co co co

SANITARY LAYOUT

P3

GROUND FLOOR PLAN

DR. EDMUNDO C. TUÑGOL

BATAAN PENINSULA STATE UNIVERSITY

(P.E BLDG. AND COVERED COURT)

(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN

AT DINALUPIHAN CAMPUS

(20)

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

PROJECT TITLE:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

11.00 11.00

22.00

5.50 5.50 5.50

4.50 4.50 9.00

5.50 5.50 5.50 5.50

11.00 11.00

22.00

1.65 4.35

4.00 1.50

3.00

lav ur ur

fd fd

wc wc lav

RISER PIPE RISER PIPE

co co

SANITARY LAYOUT

P4

SECOND FLOOR PLAN

DR. EDMUNDO C. TUÑGOL

BATAAN PENINSULA STATE UNIVERSITY

COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)

(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN

AT DINALUPIHAN CAMPUS

(21)

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

11.00

22.00

6.00

9.00

5.50 5.50 5.50 5.50

4.50 4.50 9.00

5.50 5.50 5.50 5.50

11.00 11.00

22.00 fd fd

fd

fd fd fd fd

fd fd fd

fd

CB

TO CATCH BASIN TO CATCH BASIN

TO CATCH BASIN

TO CATCH BASIN TO CATCH BASIN TO CATCH BASIN

TO CATCH BASIN TO CATCH BASIN

TO CATCH BASIN TO CATCH BASIN

TO CATCH BASIN

CB CB CB CB CB

CB CB CB

CB

CB

slope slope

slope slope slope

slope

slope slope

slope

slope

fd

3.00

SANITARY LAYOUT

P5

ROOF DECK PLAN

DR. EDMUNDO C. TUÑGOL

BATAAN PENINSULA STATE UNIVERSITY

(P.E BLDG. AND COVERED COURT)

(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN

AT DINALUPIHAN CAMPUS

(22)

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

REVISION

NO. DESCRIPTION

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA

PREPARED BY:

ARCHITECT II, TWG CONSULTANT REVIEWED BY:

UNIVERSITY PRESIDENT APPROVED BY:

RECOMMENDED BY:

2

DATE

AR. ROXETTE S. UMEREZ

CHECKED BY:

PROJECT TITLE:

AR. DANILO Y. GALURA

SHEET NUMBER:

9.00

11.00

11.00 6.00

5.50

5.50

5.50 5.50

5.50

5.50 11.00

22.00

2.00

3.00 1.50

3.00 2.75

2.75 22.00

3.00

5.50

5.50

11.00

2.00

1.50 9.00 RISER PIPE

wc wc wc

ur lav

lav TO TAP

NEAREST WATER SYSTEM LINE

WATER LINE LAYOUT (ISOMETRIC)

P6

GROUND FLOOR PLAN

DR. EDMUNDO C. TUÑGOL

BATAAN PENINSULA STATE UNIVERSITY

COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)

(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN

AT DINALUPIHAN CAMPUS

(23)

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

11.00

11.00 22.00

5.50

5.50

5.50

4.50

4.50

9.00 5.50

5.50

5.50

5.50 11.00

11.00 22.00

1.65

4.35

4.00 1.50

3.00

wc wc lav

ur

ur lav RISER PIPE

WATER LINE LAYOUT (ISOMETRIC)

P7

SECOND FLOOR PLAN

DR. EDMUNDO C. TUÑGOL

BATAAN PENINSULA STATE UNIVERSITY

(P.E BLDG. AND COVERED COURT)

(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN

AT DINALUPIHAN CAMPUS

(24)

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

PROJECT TITLE:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

9.00

11.00 11.00

6.00

5.50

5.50

5.50

5.50 5.50

22.00 11.00

5.50

1.50

3.00

2.00

3.00 2.75

2.75 22.00

3.00

5.50

5.50

11.00

2.00

1.50 9.00 RISER PIPE RISER PIPE

lav fd lav

wc fd ur

wc

wc fd fd

fd EXISTING SEPTIC TANK

NEAREST TO PUBLIC SEWER LINE

CB

CB

CB

CB

CB

CB

CB CB

CB

CB

CB

NEAREST TO PUBLIC SEWER LINE

NEAREST TO PUBLIC SEWER

LINE co

co co co

SANITARY LAYOUT (ISOMETRIC)

P8

GROUND FLOOR PLAN

DR. EDMUNDO C. TUÑGOL

BATAAN PENINSULA STATE UNIVERSITY

COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)

(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN

AT DINALUPIHAN CAMPUS

(25)

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

11.00

11.00 22.00

5.50

5.50

5.50

4.50

4.50

9.00 5.50

5.50

5.50

5.50 11.00

11.00 22.00

1.65

4.35

4.00 1.50

3.00

lav ur

ur fd

fd wc

wc lav

RISER PIPE RISER PIPE co co

SANITARY LAYOUT (ISOMETRIC)

P9

SECOND FLOOR PLAN

DR. EDMUNDO C. TUÑGOL

BATAAN PENINSULA STATE UNIVERSITY

(P.E BLDG. AND COVERED COURT)

(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN

AT DINALUPIHAN CAMPUS

(26)

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

PROJECT TITLE:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

11.00

22.00 6.00

9.00

5.50

5.50

5.50

5.50

4.50

4.50

9.00 5.50

5.50

5.50

5.50 11.00

11.00 22.00

fd fd

fd

fd

fd

fd

fd

fd

fd fd

fd

CB

TO CATCH BASIN

TO CATCH BASIN

TO CATCH BASIN TO CATCH BASIN

TO CATCH BASIN

TO CATCH BASIN

TO CATCH BASIN TO CATCH BASIN

TO CATCH BASIN TO CATCH BASIN

TO CATCH BASIN

CB

CB

CB

CB

CB

CB

CB CB

CB CB

slope

slope

slope

slope

slope slope

slope

slope

slope

slope fd

3.00

SANITARY LAYOUT (ISOMETRIC)

P10

ROOF DECK PLAN

DR. EDMUNDO C. TUÑGOL

BATAAN PENINSULA STATE UNIVERSITY

COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)

(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN

AT DINALUPIHAN CAMPUS

(27)

WALL FINISH SCHEDULE

FLOOR FINISH SCHEDULE PARTITION SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE RECOMMENDED BY:

APPROVED BY:

REVISION

NO.

2

DESCRIPTION DATE

LOCATION:

SHEET CONTENT:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

CHECKED BY:

PREPARED BY:

ARCHITECT II, TWG CONSULTANT REVIEWED BY:

AR. DANILO Y. GALURA

SHEET NUMBER:

1.25 12.25

3.55

STAGE

(60cm X 60 cm FLOOR TILES) SUBMIT SAMPLE FOR APPROVAL

5.00

1.25

0.34

12.55

3.55

14.75

7.25 7.25

DRESSING ROOM/STORAGE OFFICE

CR AA

BB

D 1

D

1 D

1

D 1 W

1

W 1 W

2 W

1

D 2

1 2 3 4

A

C

B (8.25 sq.m)

+0.75

+0.65

(58.30 sq.m)

up up

1.60

3.25 7.70

1.45 2.25

(2.32 sq.m)

+0.75

up

(20.44 sq.m)

+0.75

3.70

1.20

GROUND FLOOR PLAN PERSPECTIVE

DR. EDMUNDO C. TUÑGOL

F-8 F-3

F-1 F-1

P P 9

9

P 9

P 9

P 4

9 P

9 P 9

P

BATAAN PENINSULA STATE UNIVERSITY

(P.E BLDG. AND COVERED COURT)

(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN

AT DINALUPIHAN CAMPUS

(28)

FLOOR FINISH SCHEDULE WALL FINISH SCHEDULE PARTITION SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

DR. GREGORIO J. RODIS

UNIVERSITY PRESIDENT VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:

RECOMMENDED BY:

REVISION

2

DESCRIPTION

NO. DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

CHECKED BY:

PREPARED BY:

PROJECT TITLE:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

FRONT ELEVATION REAR ELEVATION

A2

DR. EDMUNDO C. TUÑGOL

0.75

NGL

ELEV.: +0.00m

GROUND FLOOR FINISH

ELEV.: .75m

4.82

ROOF APEX

ELEV.: 4.82m

SLIDING WINDOW AWNING WINDOW

PLAIN CEMENT PLASTER FIN.

2"X4" TUBULAR BAR

SLIDING WINDOW

CANOPY

0.75

NGL

ELEV.: +0.00m

GROUND FLOOR FINISH

ELEV.: .75m

4.82

ROOF APEX

ELEV.: 4.82m

PANEL DOOR

TRACKLIGHT

2"X4" TUBULAR BAR

PLAIN CEMENT PLASTER FIN.

DECO. STONE

W 4

W 1

W 1

W 1

W 4 W

1

W 1

BATAAN PENINSULA STATE UNIVERSITY

COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)

(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN

AT DINALUPIHAN CAMPUS

(29)

FLOOR FINISH SCHEDULE WALL FINISH SCHEDULE PARTITION SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

UNIVERSITY PRESIDENT APPROVED BY:

RECOMMENDED BY:

NO.

REVISION

2

DATE DESCRIPTION

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

CHECKED BY:

PREPARED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

0.75

NGL

ELEV.: +0.00m

GROUND FLOOR FINISH

ELEV.: .75m

4.82

ROOF APEX

ELEV.: 4.82m

DRESSING ROOM/

STORAGE

0.75

NGL

ELEV.: +0.00m

GROUND FLOOR FINISH

ELEV.: .75m

4.82

ROOF APEX

ELEV.: 4.82m

OFFICE DRESSING ROOM/STORAGE

0.75

NGL

ELEV.: +0.00m

GROUND FLOOR FINISH

ELEV.: .75m

4.82

ROOF APEX

ELEV.: 4.82m PANEL DOOR

2"X4" TUBULAR BAR

PLAIN CEMENT PLASTER FIN.

CANOPY

0.75

NGL

ELEV.: +0.00m

GROUND FLOOR FINISH

ELEV.: .75m

4.82

ROOF APEX

ELEV.: 4.82m

PANEL DOOR

2"X4" TUBULAR BAR

PLAIN CEMENT PLASTER FIN.

CANOPY

RIGHT SIDE ELEVATION LEFT SIDE ELEVATION

A3

SECTION THRU A-A SECTION THRU B-B

DR. EDMUNDO C. TUÑGOL

W 4

W 1

W 4 W

1

W

1 W

1

BATAAN PENINSULA STATE UNIVERSITY

(P.E BLDG. AND COVERED COURT)

(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN

AT DINALUPIHAN CAMPUS

(30)

FLOOR FINISH SCHEDULE WALL FINISH SCHEDULE PARTITION SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE RECOMMENDED BY:

APPROVED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

CHECKED BY:

PREPARED BY:

PROJECT TITLE:

ARCHITECT II, TWG CONSULTANT

SHEET NUMBER:

AR. DANILO Y. GALURA

REVIEWED BY:

FRONT ELEVATION REAR ELEVATION

A4

DR. EDMUNDO C. TUÑGOL

W 1

W 2

1.20

1.20 0.90

0.60

0.60 1.50

2.10

1.00

D 1

0.70

2.10

D 2

BATAAN PENINSULA STATE UNIVERSITY

COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)

(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN

AT DINALUPIHAN CAMPUS

(31)

FLOOR FINISH SCHEDULE WALL FINISH SCHEDULE PARTITION SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

ADDITIONAL COLUMN & TRUSS PROPOSED NEW STAGE

5.40 5.90

5.90 5.90

5.90 5.90

6.00

40.90

5.40 5.90

5.90 5.90

5.90 5.90

6.00

40.90

17.00

17.00 EXISTING COVERED COURT

(EXISTING) COVERED COURT PLAN

A5

DR. EDMUNDO C. TUÑGOL

BATAAN PENINSULA STATE UNIVERSITY

(P.E BLDG. AND COVERED COURT)

(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN

AT DINALUPIHAN CAMPUS

(32)

FLOOR FINISH SCHEDULE WALL FINISH SCHEDULE PARTITION SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

PROJECT TITLE:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

5.40 5.90

5.90 5.90

5.90 5.90

6.00

40.90

5.40 5.90

5.90 5.90

5.90 5.90

6.00

40.90

17.00

17.00 EXISTING COVERED COURT

STAGE (60cm X 60 cm FLOOR TILES) SUBMIT SAMPLE FOR APPROVAL

(PROPOSED)

COVERED COURT PLAN

A6

DR. EDMUNDO C. TUÑGOL

BATAAN PENINSULA STATE UNIVERSITY

COMPLETION OF MULTIPURPOSE GYM (P.E BLDG. AND COVERED COURT)

(DINALUPIHAN CAMPUS), DINALUPIHAN, BATAAN

AT DINALUPIHAN CAMPUS

Referensi

Dokumen terkait

Dizon1,6,* 1 Graduate School, Bataan Peninsula State University, City of Balanga, Bataan, 2100, Philippines 2 College of Social and Behavioral Sciences, Bataan Peninsula State