. This Technical Circular and the material contained in it is provided only for the purpose of supplying current information to the reader and not as an advice to be relied upon by any person.

. While we have taken utmost care to be as factual as possible, readers/ users are advised to verify the exact text and content of the Regulation from the original source/ issuing Authority.

Subject: Structural Failure of Provision Crane Maintenance Platform.

 In a recent accident, ship’s provision crane lower maintenance platform extension got detached and collapsed with a crew member standing on the extension.

 The above provision crane was subjected to periodical testing and inspections by competent third-party in accordance with International Labour Organization (ILO) Convention No.152 and quarterly inspections by the ship’s crew in accordance with the ship’s Preventive Maintenance System.

 Upon examination during Administrator’s marine safety investigation, it was determined that:

a. The welds for all three of the brackets attached to the main platform had failed.

b. Heavy corrosion was observed on the main platform where all the three brackets were attached.

c. The ship’s crew reported that the corrosion was not visible prior to the extension falling.

d. Welds lacked full penetration.

 Based on the above, Administration vide Marine Safety Advisory No. 23-19 (copy attached) has recommended that ship managers:

1. Inspect the maintenance platforms for cranes fitted on-board the ships in their managed fleet to determine if they include any portion that is supported by brackets as those shown in Figure 1 of the attached MSA 23-19. If they do, ship managers should ensure that:

 the connections are inspected to determine if they show any indication of damage or deterioration;

 any potential damage or deterioration is reported and corrected as soon as possible;

 if only brackets such as those shown in Figure 1 of the attached MSA 23-19 are used to connect any part of the maintenance platform to the crane, to consult with the crane manufacturer regarding recommendations for reinforcing the connection and to make the required modifications as soon as possible;

 ship’s staff do not use the platform until any required modifications or repairs are completed; and

No.: 028/2019 Date: 14th August 2019

Technical Circular

(2)

Whilst the utmost care has been taken in the compilation of the Technical Information, neither Indian Register of Shipping, its affiliates and subsidiaries if any, nor any of its directors, officers, employees or agents assume any responsibility and shall not be liable to any person for any loss, damage or expense caused in any manner whatsoever by reliance on the information in this document.

 the maintenance and inspection procedures for shipboard cranes are reviewed and, if necessary, revised to ensure that the connections are subject to regular inspections.

2. Review and, if necessary, revise the safe work procedures in their Safety Management System to ensure that as part of the pre-task planning for any work aloft, near, or over the ship’s side includes the identification of appropriate strong points for attaching safety lines or fall arresters.

 Ship Owners, Operators and Masters are advised to be guided by the attached Circular.

Enclosure:

1. RMI Marine Safety Advisory No. 23-19.

Referensi

Dokumen terkait

Copies of University publi- cations may be obtained from the Melbourne University Bookroom, or they may be inspected at any university in Australia and at the Associa- tion of

3 Students who have not recently traveled to China, Hong Kong or Macao, but show symptoms They will be sent to the University Medical Clinic for determination if their condition

 Any attempt or threat to seize control of a ship by force;  To damage or destroy a ship or its cargo;  To injure or kill a person on board a ship; or  To endanger in any way the

Nevertheless, if any person uses services of the Society, or relies on any information or advice given by or on behalf of the Society and suffers loss damage or expenses thereby which

Inputs for objectives may be obtained from Ship Security Plan, changing threats, new factors and/or lessons learnt from previous exercises.. o Scenario – the setting for an exercise

Whilst the utmost care has been taken in the compilation of the Technical Information, neither Indian Register of Shipping, its affiliates and subsidiaries if any, nor any of its

Any ISM Company whose vessel has been detained in a US port is required  To submit a corrective action plan to address the underlying root cause of the substandard condition or

From 19th July 2018, all vessels entering or intending to enter Japanese ports directly from foreign ports are required to provided additional ship security information which includes