(10)
.1(10 x 1 = 10 Marks)
(1)
(200)
(4)
(7)
.2(4 x 5 = 20 Marks)
(5)
(500)
(3)
(5)
.3(3 x 10 = 30 Marks)
(10)
1
Isohytes i.Rainfall (d) Humidity (c) Height (b) Pressure (a)
Precipitation ii.All of these (d) Hails(c) Snow (b) Rain (a)
Runoff .iiiCubic metres per second (b) Cubic metres (a) Cubic metres per hour (d) Cubic metres per minutes (c)
Symon's Rain Gauge .iv Weighing type gauge (b) Tipping bucket gauge (a)Non Recoding gauge(d) Float type recoding gauge (c)
Crop Period .v
Diploma in Engineering
V Semester Exams: AICTE - January- 2023 DPCE511PCT - Water Resource Engineering
Total Time : 3 hrs Total Marks :60
P.T.O. 1/2
Culturable command area = Gross command area-unculturable area .vi
(True/False)
Maximum Flood Discharge
Maximum Rainfall .vii(True/False)
---
Ogee Spillway .viii
---Elementary Profile
Gravity Dam .ix None (d) Sqaure (c) Triangular (b) Trapeziodal (a)
Canal Lining
.x
920
120
.2
Hydrological
Hydrology .3
Barrage
Weir .4
.5Sprinkler Irrigation (b) Duty and Delta (a)
Siphon Spillway
.6
Pheratic Line
Saturation Gradient
Earthen Dam .7
Canal Alignment .8
Irrigation
Irrigation .9
'Middle Third Rule'
Drainage Gallery .10
Gravity Dams .11
Silt
Water Quality Requirements
Irrigation .12
.13Head Regulator (c) Ryve's and Dicken's Formula (b) Float type rain gauge (a)
2/2