• Tidak ada hasil yang ditemukan

土木・建築一式工事で予定価格が3億円以上の工事

N/A
N/A
Protected

Academic year: 2024

Membagikan "土木・建築一式工事で予定価格が3億円以上の工事"

Copied!
15
0
0

Teks penuh

Something wrong

Referensi

Dokumen terkait

Akila, Syed Shuja Hussain, Dinesh Mavaluru, "A Cost-Aware Method for Tasks Allocation on the Internet of Things by Grouping the Submitted Tasks," Journal of Internet Technology, vol..

[r]

[r]

In a construction site, the utilization of RFID can improve the original management model and allow material type, quantity, and inventory can be obtained correctly and integrated

[r]

[r]

[r]

[r]