高層建築物施工防災計畫書研擬之研究 江崇誠,蔡許宏,林鴻志

建築與都市計畫學系 建築與規劃學院 [email protected]

摘要

  Building industry is belongs to the physical strength negative load capacity, the work environment in the tradition is bad and the occupation injury accident has a frequency higher industry, thus has brought the ornamental hairpin h laborer's in construction operational security

question. The architectural engineering carries on once has the mistake, the construction disaster event follows immediately comes, Not only

creates building industry and suffers injury loss the household life and property, has consumed the ornamental hairpin h society cost. But at present domestic local agency (Taipei county city and Kaohsiung) is the reduced construction disaster has and the occupation injury, thus

subscribes decides above the certain scale the new construction.Before the declaration push model conducts an inquest, we should construct

institution of association the master unit request to the county municipal government to apply for the convention construction to guard against the disaster relief plan explanation to be able. Although various counties municipal government takes to construct the construction disaster day by day the prevention, but also only is the person has the shape article also domestic existing builds in the law standard to take measures against

natural disasters the new construction construction the plan book to

compose by no means the form and the content includes in the law standard.

The architectural engineering "the zero disaster" is always goal of the building pursue, this namely for this research main cause.

Thus,this research penetration construction disaster case... Literature review, collects the entire construction period often has the labor

peaceful accident place,and discusses each construction stage disaster to have the reason, to took the high-rise building construction takes

measures against natural disasters the plan record project overhead

construction to grind draws up the reference. Initially will draw up the

(2)

high-rise building construction to take measures against natural disasters in addition the plan record project overhead construction to penetrate the expert to ask the volume, evaluates audiences of the result by way of the expert to count with the reason cancels chooses the frequency, screens conforms to the high-rise building construction to take measures against natural disasters record project the plan,and then discusses importance of the various projects and the influence, establishes "the high-rise

building construction to take measures against natural disasters the plan record project" the whole overhead construction. Peaceful will be

comprehensive by the time promotion high-rise building construction and is connected in the future of reference the law revision.

關鍵字:The high-rise building construction takes measures against natural disasters the plan, the construction construction takes measures against natural disasters the plan, the construction disaster, the expert asks the volume

Referensi

Dokumen terkait

表2 國內外衝突處理行為之相關研究 作者(年代) 研究題目 研究目的 研究對象 研究地點 研究工具 Cetin & Hacıfazlıoglu 2004 Conflict management styles a comparative study of university academics and high school

1 臺北市立松山高級中學 111 年度「高中物理適性教材研發實驗計畫」 教師增能研習實施計畫 壹、依據:本校111年度高中物理適性教材研發實驗計畫 貳、目的: 一、 促進教師專業成長與進修,精進教學品質與增進學生學習。 二、 分享教師個人學術專業,發展多元適性課程。 參、辦理單位:臺北市立松山高級中學。 肆、研習資訊