CERTIFICATION OF APPROVAL

Development of Spreadsheet MRP model for Panel Front Door Left Hand Side Assembly

by Nazri Talib

A project dissertation submitted to the Mechanical Engineering Programme

Universiti Teknologi PETRONAS in partial fulfilment of the requirement for the

BACHELOR OF ENGINEERING (Hons) (MECHANICAL ENGINEERING)

Approved by,

(I

r. A.P. Dr. Mohd Amin Bin Abd Majid

)

UNIVERSITI TEKNOLOGI PETRONAS TRONOH, PERAK

June 2010

(2)

CERTIFICATION OF ORIGINALITY

This is to certify that I am responsible for the work submitted in this project, that the original work is my own except as specified in the references and acknowledgements, and that the original work contained herein have not been undertaken or done by unspecified sources or persons.

______________________

NAZRI BIN TALIB

(3)

ABSTRACT

The project focus on the development spreedsheet model of material requirement planning (MRP) for panel front door left hand side assembly for an automotive part. The objective of the study was to identify the elements of MRP implementation and develop the model. Three major inputs required to develop MRP model were identified. There were production schedule for the panel front door left hand side assembly, inventory status records, and bill of material of the components. Using the inputs, mathematical modelling of products was developed and integrated using a spreadsheet, the model was expanded to MRP model. The developed MRP was used to prepare MRP for 12 components of the panel.

Simulation results indicate the MRP was able to estimate the net requirements for all components for each period based on lot-for-lot.

(4)

ACKNOWLEDGEMENTS

First and foremost, I would like to praise God the Almighty for His guidance and giving me the strength to complete a Final Year Project (FYP) although difficulties occurred. I would also like to take this opportunity to acknowledge and thank everyone that has given me all the support, guidance and facilities throughout the whole period of completing the project of ‘Develop spreadsheet MRP model for Panel Front Door Left Hand side Assembly’. My deepest appreciation goes to my supervisor, Ir. Ap Dr. Mohd Amin Bin Abd Majid who has given me endless support and guidance throughout the one year period of this final year project. He never stopped given me guidance even though I have made some delays and errors upon completing the project. Apart from that, I would like to thank my colleagues for their support and advices. Finally, special thanks to my parents and family for their continuous love and support. Thank you.

(5)

TABLE OF CONTENTS

CERTIFICATION . . . . . . . i ABSTRACT . . . . . . . . iii ACKNOWLEDGEMENT . . . . . . iv CHAPTER 1: INTRODUCTION . . . .

1.1 Background of study . . . 1.2 Problem statement . . . 1.3 Objective . . . . . 1.4 Scope of Study . . . .

CHAPTER 2: LITERATURE REVIEW . . . 4

2.1 Conceptual Model . . . 4

2.2 Conceptual Model Methodology . 5

2.3 MRP Approach . . . . 8

2.4 MRP Parameters . . . . 12

CHAPTER 3: METHODOLOGY . . . . 15

CHAPTER 4: RESULTS AND DISCUSSION . . 25

CHAPTER 5: CONCLUSION . . . . . 31

REFERENCE . . . . . . . . 32

APPENDIX . . . . . . . . 33

(6)

LIST OF FIGURE

Fig. 2.1: Conceptual modelling methodology..……….6

Fig. 2.2: Bills of material……….………...9

Fig. 2.3: Master Production Schedule………...9

Fig. 2.4: MRP Process………..11

Fig. 2.5: MRP Parameters………12

Fig. 3.1: Methodology Approach……….15

Fig. 3.2: Bill of material Panel Front Door Left Hand Side Assembly....17

Fig. 3.3: Flow MRP model………...22

Fig 3.4: Flowchart of MRP Simulation………24

TABLE

Table 3.1: Lead time of Panel Front Door Left Hand Side Assembly….18 Table 3.2: Explosion Process for Panel Fr Dr Left Hand Side Assbly…19

LIST OF ABBREVIATIONS

MRP Material Requirement Planning

MPS Master Production Schedule

BOM Bill of Material

Referensi

Dokumen terkait

Paris A project dissertation submitted to the Electrical & Electronic Engineering Programme Universiti Teknologi PETRONAS in partial fulfilment of the requirement for the Bachelor of

https://doi.org/ 10.1017/jie.2019.13 Received: 17 September 2018 Revised: 17 October 2018 Accepted: 23 April 2019 First published online: 2 September 2019 Key words: Aboriginal