• Tidak ada hasil yang ditemukan

EAP216 - EPrints USM

N/A
N/A
Protected

Academic year: 2024

Membagikan "EAP216 - EPrints USM"

Copied!
6
0
0

Teks penuh

(1)

SULIT SULIT

Second Semester Examination 2021/2022 Academic Session

July/August 2022

EAP216 – Introduction to Environmental Engineering

Duration : 3 hours

Please ensure that this examination paper consists of SIX (6) pages of printed material before you begin the examination.

Instructions: This paper contains SIX (6) questions. Answer ANY FIVE (5) questions.

All questions MUST BE answered on a new page.

...2/-

(2)

SULIT 1. (a) The following analysis values were obtained from a chemical analysis

of mineral water.

Ca2+ = 70 mg/L Mg2+ = 30 mg/L Na+ = 125 mg/L HCO3-= 165 mg/L SO42- = 173 mg/L Cl- = 202 mg/L

Determine the ion balance for this chemical analysis and identify that the analysis is in the acceptable range (10%) according to Standard Methods for the Examination of Water and Wastewater, APHA, 1999.

[10 marks]

(b) In evaluating a chemical’s fate and treatment, an equilibrium approach is used whenever reactions are very fast and the final conditions resulting from the reactions are of interest. Select TWO (2) equilibrium processes that are important in environmental engineering. Discuss the selected processes.

[10 marks]

...3/-

(3)

SULIT 2. (a) A pond is used to treat dilute municipal wastewater before the liquid is discharged into a river. The inflow to the pond has a flow rate of 4X00 m3/day and a BOD concentration of 25 mg/L. The volume of the pond is 20,000 m3. BOD decays in the pond with a first-order rate constant equal to 0.25/day. With the help of a sketch, determine the BOD concentration in mg/L at the outflow of the pond. (X value is taken from the final digit of your index number).

[10 marks]

(b) Describe with a diagram, human perturbation carbon cycle with activities that increase carbon content in the environment.

[10 marks]

3. (a) A noise measurement exercise was carried out at a residential area due to construction site nearby during daytime working hours as shown in Table 1. Calculate LAeq for the monitoring data. (X is last digit of your Index Number).

Table 1

Duration (minutes) Sound Level dB(A)

10 71

20 73

30 69

40 65

50 7X

60 7X

[10 marks]

…4/-

(4)

SULIT (b) The water supply for drinking water in Malaysia comes primarily from rivers. To provide clean and safe drinking water to consumers, river water undergoes a series of treatments.

Sewage is effluent from household usage that ends up in a sewage treatment plant (STP). Here, the wastewater goes through a series of treatments to release clean effluent into a waterbody (as required by law).

Briefly describe the differences in treatment methods for these two types of water.

[10 marks]

4. (a) It is difficult to get public participation and cooperation in the waste management system if the awareness on the importance of proper waste handling and disposal is lacking.

i) Describe the importance of a proper waste management system.

[4 marks]

ii) Suggest THREE (3) ways to increase public awareness on the importance of proper waste management.

[6 marks]

(b) Name the components in the trilogy of air pollution. Then, explain the component that is important in its dispersion.

[10 marks]

5/-

(5)

SULIT 5. Briefly discuss TEN (10) significant elements of the environment in the

vicinity of a project site and study boundaries.

[20 marks]

6. (a) Define ‘Environmental Contingency Plan’ and discuss the importance of this plan in the Environmental Management Plan (EMP).

[6 marks]

(b) Kerian District Council plans to upgrade Kuala Gula in Bagan Serai, Perak as shown in Figure 1 as an international tourism spot to boost the economy and create more jobs. Certain mangrove area needs to be cleared. The Kuala Gula Bird Sanctuary, which is important for more than 60 species of waterbird, including migratory birds, need to be protected as this will be a major tourist attraction.

Explain the environmental issues relevant to this project.

[14 marks]

…6/-

(6)

SULIT Figure 1

-oooOOOooo-

Referensi

Dokumen terkait

Producers are to follow established and approved protocols for proper waste processing as defined for hazardous wastes within the "IUPUI Chemical Hygiene Plan" and the "Waste Disposal

5 markah Nyatakan yang mana diantara yang berikut bergantung keadaan laluan: Tekanan, haba" entalpi, suhu, entropi, ketumpatan, kerja dan kelikatan.. Sfafe which of the following

Figure 1: Hazardous waste compatibility chart i Based on chemical group in Figure 1, describe the reaction between oxidizing mineral acid and halogenated organics.. [5 marks] ii

The cabin of the cable car shown in Figure 1 is suspended from a set of wheels that can roll freely on the support cable ACB and is being pulled at a constant speed by cable DE... [10

[4 marks] iii By using conditional probability relation, calculate the probability that the first dice is showing “6” and the sum of all the dices is less or equal to 10.. A flow meter

Parents' participation on equal footing 'With the professional worker and an informal socia1 enviJ onment ale considered crucial for the success of partnership in rehabilitation of the

Therefore, an effort to sensitize the public on proper waste management becomes necessary especially now in developing countries like Nigeria because improper solid waste disposal and