IOP Conference Series: Earth and Environmental Science

PAPER • OPEN ACCESS

Exploring Building Information Modeling (BIM) Awareness in Sarawak Construction Industry

To cite this article: S D Tamjehi et al 2020 IOP Conf. Ser.: Earth Environ. Sci. 498 012090

View the article online for updates and enhancements.

This content was downloaded from IP address 49.50.236.213 on 02/07/2020 at 04:31

(2)

Content from this work may be used under the terms of theCreative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.

Published under licence by IOP Publishing Ltd

IConCEES 2019

IOP Conf. Series: Earth and Environmental Science 498 (2020) 012090

IOP Publishing doi:10.1088/1755-1315/498/1/012090

1

Exploring Building Information Modeling (BIM) Awareness in Sarawak Construction Industry

S D Tamjehi1, A Ahmad Zaini1*, N Zaini1, A W Razali1 and H C Gui1

1 Department of Quantity Surveying, Faculty of Built Environment, Universiti Malaysia Sarawak (UNIMAS), Malaysia

*Corresponding author: [email protected]

Abstract. Building Information Modeling (BIM) is a digital view which represent the functional and physical of building in construction project. BIM has become a necessity in today's construction industry from the point of of providing digital representation and integration between project stakeholders, as well as providing the possibility of processing and storing the project information in a common database. Despite these advantages, the acceptance of BIM remain at a marginal level. Sarawak construction industry itself has fallen far behind on BIM implementation. Moreover, as construction projects in the state of Sarawak become increasingly diversify and complex, the need for BIM in Sarawak becomes increasingly important. Therefore, this paper has explored the awareness of BIM in the Sarawak construction industry. To realize this, a structured questionnaire survey form was distributed to 300 construction stakeholders through simple random sampling method. Out of the 300 questionnaire surveys, a total of 133 were returned and analyzed using descriptive, mean and factor analysis. The results were tabulated and ranked in descending order. Findings of this paper revealed that awareness level of BIM is gaining its momentum and the implementation of related software in Sarawak construction industry is still low. Factor analysis procedure for awareness of BIM has been conducted and this has extracted two distinct components which is awareness on knowledge and software with eigenvalues exceeding 1.0. This paper therefore encourages and recommends BIM implementation in the Sarawak construction industry, derivable through BIM awareness to increase productivity, better coordination, and minimized errors and repetition of works in the construction operations.

1. Introduction

In early 2000, Building Information Modelling (BIMIs considered a key technology not built within the framework of Architecture, Engineering & Construction (AEC) [1]. Parallel with the improvement in construction industry around the world, the subject BIM has become an essential topic to the point where the conception is being enlarge into the realm it was not primitively apprehended to deliver [2]. In Malaysia, BIM can be effectively managing the construction projects and has been applied by AEC industries [3].

The definition of BIM is systematically changing due to the rapid improvement of Information Technologies in AEC, along with in Architecture, Engineering, Construction and Owner/Operator (AECO) [4]. It can be defined as headlining the universal concepts for that commodity determination output build on the management of building cerebral 3D virtual model correlated with construction process starting from project initiation until demolition. BIM can be defined as a series or combination

Referensi

Dokumen terkait

Series: Earth and Environmental Science 497 (2020) 012045 IOP Publishing doi:10.1088/1755-1315/497/1/012045 1 Farmer perceptions of microsystem salt production in Bluka

Keywords: Awareness, Building Information Modelling, Contractors, Malaysian Construction Industry, Sustainability 1.0 INTRODUCTION Building Information Modeling BIM is the latest

Series: Earth and Environmental Science788 2021 012053 IOP Publishing doi:10.1088/1755-1315/788/1/012053 Effects of addition chitosan-oligosaccharide of snail shell in the diet on

From Table 3, it can be found that the top ten most important factors that could increase the pace of implementing BIM are: 1 Support and enforcement in the implementation of BIM by

Challenges of BIM technology in IBS application amongst Malaysian construction players Mean value Standard deviation Technology High cost for new technology and only large

Series: Earth and Environmental Science469 2020 011004 IOP Publishingdoi:10.1088/1755-1315/469/1/011004 12 Madiun Exports and Dollar Exchange Rates 145 Tony Yulianto University of

Series: Earth and Environmental Science 1027 2022 012010 IOP Publishing doi:10.1088/1755-1315/1027/1/012010 1 Effectiveness of using of brown algae alginate to immobilize the

Modul pelatihan BIM untuk perencanaan konstruksi di Indonesia, membahas prinsip dasar dan implementasi teknologi Building Information Modeling