KERJA - KERJA MENAIKTARAF BILIK EKSIBIT UNTUK TEMPAT SIMPANAN BARANG KES BEKU DAN KERING SERTA LAIN-LAIN

KERJA BERKAITAN DI IBU PEJABAT PERHILITAN, CHERAS (TAWARAN SEMULA)

NO. SEBUT HARGA : JPS (SH) / ME / 05 / 2020 TAKLIMAT SEBUT HARGA BAGI PROJEK

PENGARAH

JABATAN PENGAIRAN DAN SALIRAN

WILAYAH PERSEKUTUAN KUALA LUMPUR

(2)

2

MATLUMAT SEBUT HARGA

NAMA SEBUT HARGA

KERJA – KERJA MENAIKTARAF BILIK EKSIBIT UNTUK TEMPAT SIMPANAN BARANG KES BEKU DAN KERING SERTA LAIN-LAIN KERJA BERKAITAN DI IBU PEJABAT PERHILITAN CHERAS

(TAWARAN SEMULA)

PELANGGAN KEMENTERIAN ALAM SEKITAR DAN AIR

PENGGUNA JABATAN PENGAIRAN DAN SALIRAN WP KUALA LUMPUR SKOP PROJEK MENAIKTARAF BILIK EKSIBIT UNTUK TEMPAT SIMPANAN

BARANG KES BEKU DAN KERING SERTA LAIN-LAIN KERJA BERKAITAN.

KELAYAKAN KONTRAKTOR

Gred : G1

Kategori : ME & B

Pengkhususan : M 01 - Sistem Hawa Dingin Dan Pengedaran Udara.

E 04 - Pemasangan Voltan Rendah.

B 04 - Kerja-kerja Pembinaan Bangunan.

(3)

3

JADUAL PERANCANGAN

TARIKH IKLAN 25 JUN 2020

TAKLIMAT SEBUT HARGA SECARA ATAS TALIAN MELALUI FB JPS KL

1 JULAI 2020 TARIKH MUAT TURUN DOKUMEN

SEBUT HARGA

1 JULAI 2020 TARIKH TUTUP SEBUT HARGA 15 JULAI 2020

TEMPOH KERJA 14 MINGGU

(4)

4

LOKASI IBU PEJABAT PERHILITAN CHERAS

3.084387, 101.743715

(5)

5

LOKASI IBU PEJABAT JABATAN PERHILITAN

(6)

6

LOKASI BANGUNAN

KEDUDUKAN BANGUAN BILIK EKSIBIT KEDUDUKAN BANGUNAN K9

(7)

7

LOKASI BILIK EKSIBIT

RUANG BANGUNAN MSB RUANG BANGUNAN GENERATOR RUANG BANGUNAN EKSIBIT

RUANG RUMAH SAMPAH

(8)

8

LOKASI NEW PARTITION BRICK WALL UNTUK BILIK KERING

(9)

9

LOKASI BILIK EKSIBIT

Ruang Bangunan Bilik Eksibit Untuk Dijadikan Bilik Sejuk.

(10)

10

LOKASI BILIK EKSIBIT

(11)

11

LOKASI BILIK EKSIBIT

PINTU MASUK BILIK EKSIBIT

(12)

12

LOKASI BANGUNAN K9

(13)

13

LOKASI CADANGAN TAPPING PIPE COLD WATER

LALUAN TAPPING AIR DARI BANGUNAN K9 CADANGAN TAPPING PIPE

(14)

CADANGAN REKABENTUK –Perspektif 1

ARAHAN KEPADA PENYEBUT HARGA

Dokumen sebut harga boleh dimuat turun dari laman web Jabatan Pengairan dan Saliran Wilayah Persekutuan Kuala Lumpur melalui

pautan http://state.water.gov.my/wpkl/ mulai dari 1 JULAI 2020 sehingga 15 JULAI 2020

Dokumen sebut harga yang dimuat turun dan telah lengkap hendaklah dikembalikan dalam bentuk hard copy.

Sebut harga ini akan ditutup pada 15 JULAI 2020 (Rabu). Dokumen sebut harga hendaklah dimasukkan ke dalam Peti Sebut Harga secara pandu lalu di Kawasan Tempat Letak Kereta, Jabatan Pengairan dan Saliran Wilayah Persekutuan Kuala Lumpur, Jalan Sultan Salahuddin, 50626, Kuala Lumpur bermula 10.30 pagi sehingga jam 12.00 tengahari pada hari tersebut.

(15)

CADANGAN REKABENTUK –Perspektif 1

ARAHAN KEPADA PENYEBUT HARGA

 Baca dan faham dengan baik  Maklumat Latar Belakang Kewangan dan Prestasi Penyebut Harga i. Perlu disahkan oleh Pengurus Cawangan Bank

berkenaan untuk 3 bulan yang terakhir

ii. Pastikan dokumen yang betul dan tidak dipalsukan

 Guna Check-list sebagai rujukan

Borang Sebut Harga WAJIB diisi dengan lengkap dan ditandatangani. (Nyatakan Tempoh dan Harga Tender)

 Surat Akuan Pembida perlu dilengkapkan

 Pendaftaran CIDB masih sah dan mempunyai Perakuan Pendaftaran Kontraktor (PPK), Sijil Taraf Bumiputera (STB) serta Sijil Perolehan Kerja Kerajaan (SPKK)

 Kemukakan semua Dokumen Asas (Dokumen Wajib,

Addendum etc)

(16)

CADANGAN REKABENTUK –Perspektif 1

SKOP KERJA

A. KERJA PERMULAAN:

i. Insurans.

ii. Laporan bergambar (sebelum mula kerja, semasa dan selepas).

iii. Shop Drawing.

iv. Method Statement.

v. As Built Drawing.

vi. Operation and Maintenance Manual.

vii. Temporary Storage Container.

viii. Shop Inspection.

ix. Testing and Commissioning.

x. System Familiarzation.

(17)

CADANGAN REKABENTUK –Perspektif 1

SKOP KERJA

B. MECHANICAL WORKS:

I. Hacking, demolishing and resurfacing the existing floor.

II. To supply, delivery and install 4’’ thick injected polyurethane panel density.

III. To supply, delivery and install of 5.0 HP Cold Room Refrigeration equipment system.

IV. Wall mounted switchboard (IP 54) for 24 hours Cold Room Refrigeration system.

V. To supply, delivery and install the indicating light with power cable.

VI. To supply, delivery and install Stainless Steel 304 racking.

VII. To dismantle and reinstall the existing exhaust fan to the area.

VIII. To supply, delivery and install Stainless Steel 304 Schedule 40 pipe and fittings.

IX. To supply, delivery and install 15mm diameter faucet lockable brass water tap.

* For Detail Please Refer Bill Of Quantities.

(18)

CADANGAN REKABENTUK –Perspektif 1

SKOP KERJA

C. C&S WORKS:

I. Brickwork.

II. Plastering.

III. Waterproofing and Asphalt Work.

IV. Painting.

V. Door : Single leaf sliding door.

VI. Ramp : To Build a ramp.

* For Detail Please Refer Bill Of Quantities.

(19)

CADANGAN REKABENTUK –Perspektif 1

SKOP KERJA

D. ELECTRICAL WORKS:

I. To supply, delivery, install and testing to Submain Cable.

II. To supply, delivery, install and testing to Distribution Board c/w internal wiring.

III. To supply, delivery, install and testing to Power, Lighting & Accessories.

* According to JKR Standard, JKR L-S1 Specification.

* For Detail Please Refer Bill Of Quantities.

(20)

1. Ir. Hasnizan Binti Hashim 011 11919676

2. En Mohd. Hood Bin Md. Noh 012 4596684

20

SEBARANG PERTANYAAN

(21)

TERIMA KASIH

Referensi

Dokumen terkait

Agar tenaga kerja bisa memasuki sektor formal lain dengan tingkat profesional kerja yang lebih tinggi maka di- butuhkanlah sebuah perencanaan yang baik bagi PJTKI

Permasalahan yang berkaitan dengan minat siswa untuk memasuki dunia kerja antara lain : (1) Bagaimanakah minat siswa jurusan Teknik Gambar Bangunan di SMK Negeri

Obyek penelitian adalah meja (tempat kerja) untuk kerja bangku mahasiswa Pendidikan Teknik Mesin FPTK IKIP Yogyakarta. Penelitian ini menggunakan metode

Hasil penelitian di lapangan menunjukan bahwa kinerja pegawai mempengaruhi terhadap efektivitas pelaksanaan program kerja, kedua hal ini saling berkaitan satu sama lain

Peran jender yang menganggap status $anita yang rendah  berakumulasi dengan indikat!r-indikat!r lain seperti kemiskinan, pendidikan, ka$in muda dan beban kerja yang

Pekerjaan luar – Pekerjaan lain yang dilakukan selepas waktu kerja Haemonetics boleh menimbulkan konflik kepentingan jika pekerjaan itu memberikan kesan yang negatif

Variabel yang lain yaitu pendekatan berfokus pada individu dan kelompok memiliki hubungan yang tidak bermakna dengan kepuasan kerja p(0,534 dan 0,096 pada =0,05).. RSI F

Rancangan usulan pembagian kerja yang baik dan optimal pada proses produksi custome sparepart yang didasarkan pada hasil perhitungan menggunakan metode DRAWS, work sampling dan juga