• Tidak ada hasil yang ditemukan

Penubuhan dan Kapasiti Kolej Komuniti

N/A
N/A
Protected

Academic year: 2024

Membagikan "Penubuhan dan Kapasiti Kolej Komuniti"

Copied!
5
0
0

Teks penuh

(1)

JADUAL 1: PENUBUHAN DAN KAPASITI KOLEJ KOMUNITI TABLE 1: ESTABLISHMENT AND COMMUNITY COLLEGE CAPACITY

Bil.

No. Kolej Komuniti Community College

Rancangan Malaysia (RMK)

Malaysia Plan Tahun Mula Beroperasi Operational Year

Kapasiti Asal Original Capacity

Kapasiti Semasa/Naik

Taraf Current/

Upgraded Capacity

Punca Kewangan Source of Funding Diluluskan

Approved Dibina

Constructed

Kampus Sementara Transit Campus

Kampus Tetap/

Kampus Sewaan Permanent Campus/ Rented

Premises

1 TELUK INTAN 8 9 2001 2009 360 360 Tempatan/ Local

2 CHENDEROH 8 9 2002 2005 540 540 Tempatan/ Local

3 GERIK 8 8 2003 2005 600 720 Tempatan/ Local

4 SUNGAI SIPUT 8 8 2003 2004 600 720 Tempatan/ Local

5 PASIR SALAK 8 8 2003 2004 600 720 Tempatan/ Local

6 BATU GAJAH 9 9 - 2011 360 360 Tempatan/ Local

7 TAIPING 9 9 - 2011 360 360 Tempatan/ Local

8 BAGAN DATUK 10 10 - 2013 540 360 Tempatan/ Local

9 BAGAN SERAI 10 11 - 2017 360 360 Tempatan/ Local

10 MANJUNG 9 9 - 2009 90 45 Tempatan/ Local

11 KUALA KANGSAR 9 9 - 2010 90 45 Tempatan/ Local

12 TAPAH 9 9 - 2010 90 90 Tempatan/ Local

13 RTC GOPENG 10 10 - 2012 90 45 Tempatan/ Local

14 SABAK BERNAM 8 8 2001 2002 1000 580 Tempatan/ Local

15 KUALA LANGAT 8 8 2003 2003 1000 920 Tempatan/ Local

16 HULU SELANGOR 8 9 2003 2009 360 360 Tempatan/ Local

17 HULU LANGAT 8 9 2003 2009 360 380 Tempatan/ Local

18 SELAYANG 8 8 2003 2006 600 740 Tempatan/ Local

19 AMPANG 10 10 2014 2015 360 360 Tempatan/ Local

20 KELANA JAYA 10 10 - 2015 360 110 Tempatan/ Local

INSTITUSI | INSTITUTION

(2)

Premises

21 TANJONG KARANG 9 9 - 2008 90 90 Tempatan/ Local

22 KLANG 9 9 - 2008 90 90 Tempatan/ Local

23 SHAH ALAM 9 9 - 2010 90 45 Tempatan/ Local

24 KUANTAN 8 8 2001 2002 1000 920 Tempatan/ Local

25 BENTONG 8 8 2003 2004 600 360 Tempatan/ Local

26 TEMERLOH 8 8 2003 2006 600 720 Tempatan/ Local

27 PAYA BESAR 8 8 2003 2007 600 720 Tempatan/ Local

28 CAWANGAN MARAN 11 11 - 2017 180 180 Tempatan/ Local

29 ROMPIN 8 8 2003 2004 600 720 Tempatan/ Local

30 PEKAN 9 9 2011 2012 360 360 Tempatan/ Local

31 JERANTUT 9 9 - 2012 360 360 Tempatan/ Local

32 RAUB 9 9 - 2007 90 45 Tempatan/ Local

33 BERA 9 9 - 2010 90 45 Tempatan/ Local

34 LIPIS 9 9 - 2007 90 45 Tempatan/ Local

35 KOK LANAS 9 9 2005 2009 360 360 Tempatan/ Local

36 JELI 9 9 - 2006 90 90 Tempatan/ Local

37 CAWANGAN TANAH

MERAH 11 11 - 2017 180 180 Tempatan/ Local

38 PASIR MAS 9 9 - 2006 180 90 Tempatan/ Local

39 CAWANGAN RANTAU

PANJANG 11 11 - 2018 90 90 Tempatan/ Local

40 SEGAMAT 8 8 2001 2002 1000 900 Tempatan/ Local

41 LEDANG 8 8 2002 2004 600 720 Tempatan/ Local

42 BANDAR PENAWAR 8 8 2003 2005 600 720 Tempatan/ Local

(3)

Bil.

No. Kolej Komuniti Community College

Rancangan Malaysia (RMK)

Malaysia Plan Tahun Mula Beroperasi Operational Year

Kapasiti Asal Original Capacity

Kapasiti Semasa/Naik

Taraf Current/

Upgraded Capacity

Punca Kewangan Source of Funding Diluluskan

Approved Dibina

Constructed

Kampus Sementara Transit Campus

Kampus Tetap/

Kampus Sewaan Permanent Campus/ Rented

Premises 43 CAWANGAN GELANG

PATAH 11 11 - 2018 90 90 Tempatan/ Local

44 SEGAMAT 2 8 8 2003 2005 600 540 Tempatan/ Local

45 PASIR GUDANG 8 8 - 2006 400 360 Tempatan/ Local

46 KLUANG 9 9 - 2012 360 360 Tempatan/ Local

47 BATU PAHAT 9 9 - 2011 360 360 Tempatan/ Local

48 MUAR 9 9 - 2009 90 90 Tempatan/ Local

49 BANDAR TENGGARA 9 9 - 2006 90 45 Tempatan/ Local

50 TANJUNG PIAI 9 9 - 2008 90 90 Tempatan/ Local

51 PAGOH 9 9 - 2009 90 90 Tempatan/ Local

52 KOTA TINGGI 9 9 - 2009 90 45 Tempatan/ Local

53 BANDAR

DARULAMAN 8 8 2001 2002 600 720 Tempatan/ Local

54 CAWANGAN JERLUN 11 11 - 2018 90 90 Tempatan/ Local

55 SUNGAI PETANI 8 9 2002 2009 360 540 Tempatan/ Local

56 KULIM 9 9 2006 2007 360 360 Tempatan/ Local

57 LANGKAWI TOURISM ACADEMY @KK

LANGKAWI 8 9 2003 2007 360 384 Tempatan/ Local

58 BALING 9 9 2006 2010 360 360 Tempatan/ Local

59 PADANG TERAP 9 9 2011 2011 360 360 Tempatan/ Local

60 SIK 10 10 - 2014 360 180 Tempatan/ Local

61 BANDAR BAHARU 9 9 - 2006 90 90 Tempatan/ Local

62 JERAI 9 9 - 2007 90 90 Tempatan/ Local

63 BUKIT BERUANG 8 8 2001 2002 600 720 Tempatan/ Local

INSTITUSI | INSTITUTION

(4)

Premises

64 MASJID TANAH 8 8 2003 2005 600 720 Tempatan/ Local

65 SELANDAR 8 8 2003 2004 600 720 Tempatan/ Local

66 JASIN 8 8 2003 2004 600 720 Tempatan/ Local

67 KOTA MELAKA 9 9 2007 2008 90 90 Tempatan/ Local

68 TANGGA BATU 9 9 - 2010 90 45 Tempatan/ Local

69 JEMPOL 8 8 2001 2002 300 720 Tempatan/ Local

70 JELEBU 8 8 2003 2004 600 720 Tempatan/ Local

71 REMBAU 9 9 - 2009 360 360 Tempatan/ Local

72 TAMPIN 9 9 - 2009 360 360 Tempatan/ Local

73 KUALA PILAH 10 10 - 2015 180 180 Tempatan/ Local

74 KEPALA BATAS 8 8 2001 2002 600 720 Tempatan/ Local

75 BAYAN BARU 8 9 2002 2011 360 360 Tempatan/ Local

76 SEBERANG JAYA 9 9 - 2011 360 405 Tempatan/ Local

77 NIBONG TEBAL 9 9 - 2009 90 45 Tempatan/ Local

78 BUKIT MERTAJAM 9 9 - 2008 90 45 Tempatan/ Local

79 TASEK GELUGOR 9 (kampus sewaan)

10 (kampus tetap) 11 - 2009 (kampus sewaan)

2018 (kampus tetap) 90 225 Tempatan/ Local

80 KUCHING 8 8 2001 2002 400 720 Tempatan/ Local

81 MAS GADING 8 9 2002 2009 360 360 Tempatan/ Local

82 MIRI 9 9 2009 2010 360 360 Tempatan/ Local

83 SARIKEI 10 10 - 2013 360 180 Tempatan/ Local

84 SANTUBONG 9 9 - 2007 90 45 Tempatan/ Local

85 BETONG 9 9 - 2007 90 180 Tempatan/ Local

86 ARAU 8 8 2001 2005 1000 900 Tempatan/ Local

(5)

Bil.

No. Kolej Komuniti Community College

Rancangan Malaysia (RMK)

Malaysia Plan Tahun Mula Beroperasi Operational Year

Kapasiti Asal Original Capacity

Kapasiti Semasa/Naik

Taraf Current/

Upgraded Capacity

Punca Kewangan Source of Funding Diluluskan

Approved Dibina

Constructed

Kampus Sementara Transit Campus

Kampus Tetap/

Kampus Sewaan Permanent Campus/ Rented

Premises

87 CAWANGAN KANGAR 11 11 - 2018 180 180 Tempatan/ Local

88 TAWAU 8 8 2001 2002 400 405 Tempatan/ Local

89 LAHAD DATU 9 9 - 2011 360 360 Tempatan/ Local

90 SANDAKAN 10 10 - 2012 360 180 Tempatan/ Local

91 BEAUFORT 9 9 - 2011 360 540 Tempatan/ Local

92 TAMBUNAN 10 (kampus sewaan)

10 (kampus tetap) 11 - 2013 360 420 Tempatan/ Local

93 PENAMPANG 10 10 - 2013 360 180 Tempatan/ Local

94 KOTA MARUDU 10 10 - 2014 360 180 Tempatan/ Local

95 SEMPORNA 9 9 - 2009 90 45 Tempatan/ Local

96 KUALA TERENGGANU 8 8 2001 2001 1000 990 Tempatan/ Local

97 CAWANGAN SETIU 11 11 - 2018 90 90 Tempatan/ Local

98 CAWANGAN HULU

TERENGGANU 11 11 - 2018 180 180 Tempatan/ Local

99 BESUT 10 10 - 2014 180 210 Tempatan/ Local

100 KEMAMAN 9 9 - 2009 90 45 Tempatan/ Local

INSTITUSI | INSTITUTION

Referensi

Dokumen terkait

Tawaran ke Politeknik/ Kolej Komuniti akan terbatal dan calon perlu memohon atau membuat rayuan semula ke Institusi yang ingin dipohon.?. Hubungi Politeknik / Kolej Komuniti

Kajian ini merupakan kajian awal yang dijalankan untuk mengenalpasti kesediaan pelajar Kolej Komuniti Selayang dari aspek minat dan sikap terhadap bidang kemahiran pendidikan

Majikan mendapati lulusan kolej komuniti mudah dilentur. Lulusan kolej ini bukan sahaja mempunyai kefahaman yang jelas terhadap pengkhususan mereka, malah mereka

Jadual 6 menunjukkan tidak terdapat perbezaan yang signifikan tahap motivasi berdasarkan kelajuan internet dalam kalangan pelajar kolej komuniti sepanjang pembelajaran

Program Keusahawanan Komuniti Mobile E-Kasih Amal Rice 2019 (MEKAR’19) merupakan projek keusahawanan sosial yang telah diperkenalkan oleh Kolej Komuniti Jerantut bertujuan

1.6 Kolej Komuniti Kuala Pilah TIDAK AKAN memulangkan yuran yang telah dibayar sekiranya pelajar memutuskan untuk berhenti dari pengajian selepas rasmi berdaftar

Justeru itu keperluan untuk mengkaji profil dan faktor kritikal kejayaan lulusan Kolej Komuniti yang telah berjaya amat perlu untuk dijadikan panduan kepada pelajar Kolej Komuniti

2018 JADUAL 17a: BANTUAN PEMBIAYAAN KEWANGAN PELAJAR KOLEJ KOMUNITI TABLE 17a: FINANCIAL ASSISTANCE FOR COMMUNITY COLLEGE STUDENTS Sijil Certificate Lokasi Location Arau Sungai