STUDY OF TRAVEL TIME AND DELAY IN NORTH KLANG

N/A
N/A
Protected

Academic year: 2024

Membagikan "STUDY OF TRAVEL TIME AND DELAY IN NORTH KLANG"

Copied!
5
0
0

Teks penuh

(1)

STUDY OF TRAVEL TIME AND DELAY IN NORTH KLANG

By

NUR HAFIZAH BINTI MD SALLEH

Report is submitted as the requirement for the degree o f Bachelor Engineering (Hons) (Civil)

UNIV ER SITITEK N Q L0G 4 MARA APRIL 2007

(2)

DECLARATION BY THE CANDIDATE

I Nur Hafizah Md. Salleh, 2004362521 confirm that the work is my own and that appropriate credit has been given where reference has been made to the work o f others.

0fc}Ci?aly

DECLARATION BY THE SUPERVISOR/S

I/vye* confirm that I/\ye* have read and check this report and to my/our opinion the report is suitable in term o f scope and quality required for awarding the Bachelor o f

Civil Engineering (Hons). a

Signature:

Name o f the Main Supervisor:

Date:

T ^ —

»[l [!2

i

(3)

ABSTRACT

Travel time is the time required to traverse from one point to the point of interest while delay is the time lost by traffic due to traffic frictions and traffic control devices. Travel-time and delay information could be applied in various fields. This information will be used by the engineer, planner and analysts to determine the effectiveness of transportation system. The objective of this research is to obtain the duration to transverse from the starting point to the end point along the study routes in North Klang. The purpose of this study is to determine the location, duration and causes of delay occurred. It will also used to quantify the traffic movement during of peak and off-peak hour period. This research was done using the average speed vehicle method. In this research, the travel time and delay will be recorded, and the travel time is expected to increase due to the increasing number of vehicles. The travel time and delay during the off peak is done to enable in making comparison with the travel time data determined during peak hour.

(4)

A ( K N O W I E DC E M ENTS

Alhamdulillah and thanks to God for blessing me.

1 would like to express my gratitude to my supervisor, Miss Tey Li Sian for her advice, guidance, supervision, support and constructive criticisms throughout the course of this thesis.

My appreciation also to my lecture of Highway and Traffic Engineering Assoc. Prof.

Dr Yusof B. Abdul Rahman and to all staff from Department of Engineering, Majlis Perbandaran Klang (MPK) for their helped and cooperation in providing valuable information for this study. A special thanks to Mr Azhar bt Mohammad, the technical assistant for giving me his help to obtain the required information.

1 would also want to express my sincere appreciation to my family for giving me both morally and financially. Last but not least, I would like express my special thanks to my friend Zulkifli B. Musa, without his helps I will not be able to collect the travel time and delay data, for giving me moral support, advice, guidance and information during the preparation of project report.

iii

(5)

TABLE OF CONTENT

FACE

DECLARATION i

ABSTRACT ii

ACKNOWLEDGEMENT lii

TABLE OF CONTENT iv

LIST OF FIGURE viii

LIST OF TABLE x

CHAPTER

CHAPTER 1: INTRODUCTION

1.1 Introduction of time travel and traffic delay I

1.2 Problem statement 3

1.3 Objective 4

1.4 Scope of work 4

1.5 Significant of study 5

CHAPTER 2: LITERATURE REVIEW

2.1 Travel l ime and Delay Study 8

2.2 Definition of Travel Time 9

2.3 Definition of Delay 11

2.4 Causes of Delay 13

2.4.1 Economic Trend 14

iv

Referensi

Dokumen terkait

TIIE INFLUENCE OF MANAGEMENT REQUIREMENT LEVEL ON FINANCIAL STATEMENT AND BOOKEEPER'S ABILITY TO.. ACCOUNTING

This paper entitled “The Implementation of Role -Play in Teaching Speaking to the Students of Tour and Travel Business Study Program” was intended to investigate

3) Based on Test Results-F Audit Delay and Timeliness, showed results that together there is a significant effect between all independent variables (level of

It is therefore, a root definition formula arranged as follows :”A certification system that participating student and government agencies in a college of tours and travel

The method used to build the model is a time delay model by considering the vaccination factor as a model parameter, model analysis using the next generation matrix method to