• Tidak ada hasil yang ditemukan

Annex A: Bill of Quantities

N/A
N/A
Protected

Academic year: 2023

Membagikan "Annex A: Bill of Quantities"

Copied!
2
0
0

Teks penuh

(1)

Page 1 of 2

Annex A: Bill of Quantities

Name of Project:

REPAIR OF ENGINE, UNDER-CHASSIS AND ELECTRICAL PARTS OF VEHICLE SHZ 702

ITEM

NO.

DESCRIPTION QTY UNIT

Unit Price

(in Pesos)

Total Cost (in Pesos)

ENGINE OVERHAUL AND CLUTCH

1 Labor, Pull Down Engine for general engine overhaul 1 lot

2 Labor, Replacement of parts 1 lot

3 Machine Shop 1 lot

4 Overhauling Gasket 1 set

5 Engine Valve Intake 8 piece

6 Engine Valve Exhaust 8 piece

7 Cam Follower 16 piece

8 Valve Lifter 16 piece

9 Main Bearing 1 set

10 Connecting Rod Bearing 1 set

11 Piston Ring STD 1 set

12 Piston Assy STD 4 piece

13 Washer-Fuel Injector 4 piece

14 Engine Oil 8 bottle

15 Oil Filter 1 piece

16 Timing Chain Set 1 set

17 Cylinder Liner 1 piece

18 Cleaning Solvent 4 piece

19 Silicon gasket 3 piece

20 Fuel Filter Assy 1 piece

21 Oil Pump Assy 1 piece

22 Air Filter 1 piece

23 Aircon Filter 1 piece

24 Turbo Bypass Hose 2 piece

25 Hose Clamp 8 piece

26 Radiator Assy 1 piece

27 Radiator Hose Upper & Lower 2 piece

28 Clutch Disc Assy 1 piece

29 Released Bearing 1 piece

30 Brake Pads FRT 1 piece

31 Hand Brake Cable 2 piece

32 Fan Belt 1 piece

33 Idler Pulley 3 piece

34 Auto Tensioner 1 piece

(2)

Page 2 of 2

UNDERCHASSIS & ELECTRICAL

35 Labor, Replacement of the parts 1 lot

36 Illumination Light Switch 1 piece

37 Fog Lamp Assy Left 1 piece

38 Fog Lamp Assy Right 1 piece

39 Shock Absorber FRT 2 piece

40 Shock Mountain FRT 2 piece

41 Stabilizer Link FRT 2 piece

42 Complete Wheel Alignment 1 lot

TOTAL BID AMOUNT (in figures): Php TOTAL BID AMOUNT (in words): Pesos

Note: The Bill of Quantities (BOQ) contains the following parts:

a. Repair Job Estimates Project Duration: 30 calendar days

Submitted by:

Name and Signature of Bidder’s Representative: _________________________________

Position: ________________________________

Name of Bidder: ______________________________

Date: _______________________

Referensi

Dokumen terkait

DESCRIPTION QTY UNIT Unit Price in Pesos Total Cost in Pesos 17001 CLEARING, GRUBBING AND LAY OUT 20.00 sq.m 8031a STRUCTURE EXCAVATION Common Soil 7.14 cu.. 8041a EMBANKMENT from