BATAAN PENINSULA STATE UNIVERSITY A1
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
BATAAN PENINSULA STATE UNIVERSITY, ABUCAY CAMPUS
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
C:\Users\User\Desktop\CJAE\logo-bpsu.png
SHEET NUMBER:
ABUCAY CAMPUS
dn dn
LOCATION :
WINDOW TYPE - W-3
SETS REQUIRED:
TOILET FACILITY ELEM. ROOM
SPECIFICATION:
LOCKSET: AS PER MANUFACTURER SPECIFICATION
TYPE: SLIDING WINDOW
1/4" THK ORDINARY CLEAR GLASS uPVC FRAME WITH
POWDER COATED FINISHED
F.F.L.
5 SETS
LOCATION :
WINDOW TYPE - W-2
SETS REQUIRED:
LECTURE ROOM (ELEMENTARY)
SPECIFICATION:
LOCKSET: AS PER MANUFACTURER SPECIFICATION TYPE: JALOUSIE WINDOW
1/4" THK ORDINARY JALOUSIE GLASS ALUMINUM WITH
WHITE POWDER COATED FINISHED
F.F.L.
10 SETS
LOCATION :
WINDOW TYPE - W-1
SETS REQUIRED:
LECTURE ROOM (ELEMENTARY)
SPECIFICATION:
LOCKSET: AS PER MANUFACTURER SPECIFICATION TYPE: JALOUSIE WINDOW
1/4" THK ORDINARY JALOUSIE GLASS ALUMINUM WITH
WHITE POWDER COATED FINISHED
F.F.L.
45 SETS
TYPE :
SETS REQUIRED:
CASING:
HINGES : LOCATION :
LOCKSET/
HANDLE:
FRAMING / JAMB:
AS PER MANUFACTURER SPECIFICATION.
AS PER MANUFACTURER
DOOR TYPE - D-1
PRE-PAINTED
WINDOWED SOLID PANEL DOOR LECTURE ROOM (ELEM. ROOM)
AS PER MANUFACTURER SPECIFICATION.
46 SETS
F.F.L.
D 1
F
KILN DRIED
TYPE :
SETS REQUIRED:
CASING:
HINGES : LOCATION :
LOCKSET/
HANDLE:
FRAMING / JAMB:
AS PER MANUFACTURER SPECIFICATION.
AS PER MANUFACTURER
DOOR TYPE - D-2
PRE-PAINTED uPVC DOOR TOILET FAC. (ELEM.RM)
AS PER MANUFACTURER SPECIFICATION.
5 SETS
F.F.L.
D 2
BATAAN PENINSULA STATE UNIVERSITY A2
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
BATAAN PENINSULA STATE UNIVERSITY,
REHABILITATION OF OLD ENGINEERING BUIILDING AT
ABUCAY CAMPUS
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
C:\Users\User\Desktop\CJAE\logo-bpsu.png
SHEET NUMBER:
ABUCAY CAMPUS
d
dn dn
d
dn dn
BATAAN PENINSULA STATE UNIVERSITY A3
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
BATAAN PENINSULA STATE UNIVERSITY, ABUCAY CAMPUS
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
C:\Users\User\Desktop\CJAE\logo-bpsu.png
SHEET NUMBER:
ABUCAY CAMPUS
INSTALLATION SHALL BE NEW SUITABLE FOR THE TYPE 3. WORKMANSHIP SHALL BE HIGHEST STANDARDS AND 2. UTILIZATION VOLTAGE SHALL BE 230V 3 Ø 60 Hz.
BUILDING OFFICIALS WITH JURISDICTIONS. BUREAU OF 1. ALL WORKS SHALL COMPLY WITH THE PROVISION
WALL RECEPTACLES = 300 MM ON CENTER WALL SWITCHES = 1300 MM ON CENTER
REFER TO ARCHITECT FOR OTHER CASES OF PANEL BOARDS = 1800 MM ON CENTER
PERPENDICULAR TO THE BUILDING STRUCTURES AND
ENGINEER/ MASTER ELECTRICIAN.
EQUIPMENT ARE AS FOLLOWS:
SUPERVISION OF A DULY LICENSED ELECTRICAL 6. ALL WORK SHALL BE DONE UNDER DIRECT INSTALLATIONS.
5. GENERAL MOUNTING HEIGHT OF DEVICES AND FINISHES.
THE REQUIREMENTS AND ORDINANCE OF THE
QUALITY. ALL MATERIALS TO BE USED FOR
4. EXPOSED WIRING WORK SHALL RUN IN PANEL OR AND PURPOSE OF APPLICATION.
FIRE DEPARTMENT AND LOCAL POWER/ TELEPHONE COMPANY.
GENERAL NOTES
ELECTRICAL CODE (PEC) AND SPECIFICATION WITH OF THE LATEST EDITION OF THE PHILIPPINE
BATAAN PENINSULA STATE UNIVERSITY E1
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
BATAAN PENINSULA STATE UNIVERSITY,
REHABILITATION OF OLD ENGINEERING BUIILDING AT
ABUCAY CAMPUS
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
C:\Users\User\Desktop\CJAE\logo-bpsu.png
SHEET NUMBER:
ABUCAY CAMPUS
ALL PLUMBING WORK INCLUDE HEREIN SHALL BE EXECUTED ACCORDING TO THE REQIREMENT OF THE PHILIPPINE'S PLUMBING CODE THE RULES AND THE REGULATION OF THE CITY GOVERNMENT, OR MUNICIPALITY
COORDINATION WITH DRAWING AND OTHER RELATED SPECIFICATION, THE ARCHITECT SHALL BE NOTED IMMEDIATELY IF ANY DESCREPANCY FOUND THEREIN
PIPES SHALL BE INSTALLED AS INDICATED ANY RELOCATION
REQUIREMENT FOR PROPER EXECUTION OF OTHER TRADES SHALL BE WITH PRIOR APROVAL OF ARCHITECT AND ENGINEER
PROPOSE SANITARY UTILITIES SHALL CONFORMED TOTHE ACTUAL LOCATION, DEPTH AND INVERTED ELEVATION OF ALL EXISTING PIPES AND STRUCTURE
ALL FIXTURES SHALL BE VENTED UNLESS OTHERWISE INDICATED
RUN ALL HORIZONTAL PIPING PERPECT ALLIGNMENT AND AT UNIFORM OF NOT LESS THAN TWO PERCENT (%)
ALL CHANGE OF DIRECTION SHALL BE MADE BY APPROPRIATE USE OF THE 45° WYES, LONG SWEEP, QUARTER BEND SIXTH OR EIGHTH TO SIXTEENTH BENDS A SINGLE 1/8 BEND COMBINATION MAY BE USE ON VERTICAL STACK AND SHORT QUARTER BEND MAY BE USE VENT TYPES
NO DOUBLE HUBS, DOUBLE TEE BRANCH SHALL BE USE ON HORIZONTAL SOIL WASTE LINE, THE DRILLING OR TAPPING OF HOUSE DRAIN WASTE OR VENT PIPES AND SADDLE HUBS AND VENT PROHIBITED
PROVIDE PIPE SLEEVES AT WALLS COLUMN SLAB ONE SLAB ONE BIGGER THAN ACTUAL SIZE PASSING THROUGH WALLS OR SLAB TO PIPES FROM BREAKAGE
CLEANOUT ARE REQUIRE UNDER THE FOLLOWING CONDITION 1. EVERY CHANGE IN HORIZONTAL DIRECTION EXCEEDING 22 1/2 ONE HALF DEGREES.
2. 1500mm INSIDE THE PROPERTY LINE THE DRAIN CONNECTOR 3. EVERY 150mmØ IN HORIZONTAL RUN PIPE
4. AT THE END OF THE HORIZONTAL PIPE LINE
A DEAD END IN THE INSTALLATION OF ANY PLUMBING SYSTEM IS PROHIBITED
NO REVISION IN THE DESIGN SHALL BE DONE WITH OUT THE PROPER KNOWLEDGE AND APPROVAL OF THE DESIGNER AND THE OWNER ANY SUCH REVISION DONE WITHOUT THE APPROVAL SHALL COURSE RESPONSIBILITY OF THE DESIGNER/ARCHITECT TO CEAS A WHOLE NO PIPING WORK FIXTURE OR EQUIPMENT SHALL BE CONCEALED OR COVERED BY ANY MAINS BEFORE THEY HAVE BEEN PRESSURE TESTED, FLOW TESTED AND INSPECTED BY THE ARCHITECT HAVING THE
JURISDICTION OF THE WORK
ALL WORK SHALL BE COMPLETELY INSTALLED AND TESTED AS REQUIRED BY THE SECTION 1378 AND SHALL BE LEAKTIGHT A T Q
UNLESS OTHERWISE NOTED AND SPECIFIED. USE NELTEX BRAND TO ALL MATERIALS OF ROUGHING OR AND APPROVED BY EQUIVALENT
XI DEAD END AVOIDED X CLEANOUT PIPES
VIII PROHIBITED FITTINGS VII CHANGE OF DIRECTION
VI GRADES OF HORIZONTAL PIPING
XIII
XV XIV XII
IX SLEEVES (NOT APPLICABLE) V FIXTURES
IV SANITARY UTILITIES III RELOCATION OF PIPES
II NOTIFICATION OF ARCHITECT I EXECUTION OF PLUMBING WORK
REF.RA 1378 NATIONAL PLUMBING CODE OF THE PHILS.
BATAAN PENINSULA STATE UNIVERSITY P1
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
BATAAN PENINSULA STATE UNIVERSITY, ABUCAY CAMPUS
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
C:\Users\User\Desktop\CJAE\logo-bpsu.png
SHEET NUMBER: