IMPROVEMENT OF PSYCHOLOGY LABORATORY ROOMS - MATERIALS Item
No. Quantity Unit Description Unit Cost Total Cost
Masonry Works
1 110 pcs Floor tiles, 60x60 300.00 33,000.00
2 10 bags Tile adhesive 450.00 4,500.00
3 8 kgs Tile grout 140.00/cu.m 1,120.00
4 1 lot consumables 1,931.00 1,931.00
Sub total 40,551.00
Carpentry Works
5 50 pcs Ordinary gypsum board, 2.40m x 1.20m
x 12mm thick 540.00 27,000.00
6 70 pcs Metal studs, 32mm x 102mm x 0.80mm
thick 240.00 16,800.00
7 20 pcs Metal track, 32mm x 102mm x 0.80mm
thick 210.00 4,200.00
8 1 lot consumables 2,400.00 2,400.00
Sub total 50,400.00
Miscellaneous Works
9 1 Set D1 – Double Sliding door with complete
accessories – 1.80 x 2.10 18,000.00 18,000.00 10 1 Set D2 – Solid door with complete
accessories – 1.00 x 2.10 8,000.00 8,000.00 11 1 Set D3 - Solid door with complete
accessories – 0.80 x 2.10 4,000.00 4,000.00 12 4 Sets W1 – One way mirror with aluminum
casement – 1.2 x 2.4 20,000.00 80,000.00
13 1 set
W2 – Aluminum casement ¼” thick clear glass on powder coated finish aluminum frame – 1.2 x 2.4
11,200.00 11,200.00
Sub total 121,200.00
Painting Works
14 1 Bag Skimcoat 540.00 540.00
15 25 ltrs Primer permacoat flat latex 250.00 6,250.00
16 25 ltrs Topcoat permacoat latex 250.00 6,250.00
17 1 lot consumables 1,304.00 1,304.00
Sub total 14,344.00
Total Material Cost 226,495.00