CONSTRUCTION OF CVMBS ACADEMIC BUILDING

2.751.502.75

HE

DN

3.503.502.00 9.00

1 2 3 4

SCALE 1 : 100 MTS.

SECOND FLOOR PLAN

2.00 H A L L W A Y

CANOPY

4.50 3.00

21.00

4.50 4.50

H A L L W A Y

CLASSROOM CLASSROOM CLASSROOM CLASSROOM

CANOPY

4.50

D 1 D 1

D 1 D 1

D 2 D 4

W 2 W 2

W 2 W 2

W 3

W 5

1a W 1a W

1a W 1a W

1a W 1a W

1a W 1a W

1a W

1a W 1a W

1a W 1a W

1a W 1a W

1a W 1a W

1a W 1a W

D 5

FE

W 6

D C

B

A E F

BID BULLETIN

(2)

2.503.003.003.200.40

SCALE 1 : 100 MTS.

FRONT ELEVATION

FIN. FLOOR LINE 2ND FLOOR LINE 3RD FLOOR LINE TOP OF ROOF BEAM APEX LINE OF TRUSS

2.60

D C

B

A E F

CONSTRUCTION OF CVMBS ACADEMIC BUILDING

BID BULLETIN

(3)

1 2 3 4

SCALE 1 : 100 MTS.

RIGHT SIDE ELEVATION

2.503.003.003.20 0.40

FIN. FLOOR LINE 2ND FLOOR LINE 3RD FLOOR LINE TOP OF ROOF BEAM APEX LINE OF TRUSS

2.60

1 2

3 4

2.503.003.003.200.40 FIN. FLOOR LINE

2ND FLOOR LINE 3RD FLOOR LINE TOP OF ROOF BEAM APEX LINE OF TRUSS

SCALE 1 : 100 MTS.

LEFT SIDE ELEVATION

CONSTRUCTION OF CVMBS ACADEMIC BUILDING

BID BULLETIN

(4)

2.503.003.003.20 0.40

FIN. FLOOR LINE 2ND FLOOR LINE 3RD FLOOR LINE TOP OF ROOF BEAM APEX LINE OF TRUSS

SCALE 1 : 100 MTS.

REAR ELEVATION

D C B A

F E

CONSTRUCTION OF CVMBS ACADEMIC BUILDING

BID BULLETIN

(5)

2.751.502.75

SCALE 1 : 100 MTS.

2ND FLOOR BEAM PLAN

4.50 4.50

3.00

21.00

3.503.502.00 9.00

1 2 3 4

2.00

4.50 4.50

B1

B1

B1

B1

B1 B1 B1 B1 B1

B1 B1

B1

B1

B1

B1 B1

B1

B1 B1 B1

B1 B4

B4 B4 B4 B4 B4 B4

B2 B2

B3 B3 B5

B5 B6

B6 B6

B6

CB CB

C O N C. C A N O P Y

CONC. CANOPY

CONC. CANOPY CB

CB

CB CB

C O N C. C A N O P Y C O N C. C A N O P Y C O N C. C A N O P Y C O N C. C A N O P Y C O N C. C A N O P Y

C O N C. C A N O P Y C O N C. C A N O P Y

C O N C. C A N O P Y

C O N C. C A N O P YC O N C. C A N O P Y C O N C. C A N O P Y

B2

S2 S2

S2 S2 S2

S2 S2

S2 S2

S1 S1

S1 S1

S1 S1

D C

B

A E F

CONSTRUCTION OF CVMBS ACADEMIC BUILDING

BID BULLETIN

(6)

9.50

0.25 2.50

TRUSS 1

SCALE 1 : 50 MTS.

TRUSS DIAGRAM

NOTE:

USE THE FOLLOWING:

· 2 - 50mm x 50mm x 6mm ANGULAR BAR FOR TOP CHORDS

· 2 - 50mm x 50mm x 6mm ANGULAR BAR FOR BOTTOM CHORDS

· 2 - 50mm x 50mm x 6mm ANGULAR BAR FOR KING POSTS

· 2 - 38mm x 38mm x 6mm ANGULAR BAR FOR WEB MEMBERS

· 6mm THICK GUSSET PLATES ON ALL JOINTS

· 16mm Ø ROUND BAR CROSS BRACING W/ TURN BUCKLES

· 12mm Ø ROUND BAR SAG ROD AT MIDDLE THIRD

· 50mm x 150mm x 1.5mm CEE PURLINS SPACED @ 0.53 M. O.C.

· 12mm THICK BASE PLATES

· 16mm Ø ANCHOR BOLTS

2.38

0.25 2.50

HT 1

0.25 2.50

6.65

HT 2

SCALE NTS.

DETAIL OF CONCRETE GUTTER CB

RB

CONCRETE COLUMN

0.30 1.15

100MM Ø NELTEX PVC ORANGE PIPE

0.10 0.60 0.60

0.30 0.25

0.10 1.125 0.10

12MM THK. BASE PLATE W/

4- 16MM Ø ANCHOR BOLTS

0.10

RB

100MM THK. SLAB W/ 12MM Ø REINF. SP. @ 150MM O.C. B.W.

100MM Ø BRASS STRAINER

0.30 1.20

CONCRETE COLUMN

0.10

OR APPROVED EQUAL

100MM THK. PARAPET W/ 12MM Ø REINF. SP. @ 200MM O.C. B.W.

CONSTRUCTION OF CVMBS ACADEMIC BUILDING

BID BULLETIN

0.95

0.53