AUDITOR'S OFFICE ELECTRONICS
FOOD TECH.
SARI GAMIT COURT MECHANICAL
TECHNOLOGY
MECHANICAL TECHNOLOGY
AUTOMOTIVE AVR DRAWING BLDG. OSA
LIBRARY CR WELDING AND FABRICATION TECH.
FOUNDRY ARCH. LAB CEME LAB
INT'L.
CENTER
PATVEP
WAF WAF
SCIENCE ROOM H.Q.
CR H.Q. 2
ELECTRONICS ELECTRONICS
ELECTRONICS
CR CR
GRAD SCHOOL I.C.T.
I.C.T.
E.S.F.
E. POST E. POST
TANGHAL LIKHA MAIN GATE PATVEP
CANTEEN
CSC BUILDING WATER
TANK
ADMINISTRATION BUILDING BASKETBALLCOURT
V . P . OFFICE
CANTEEN WATER TOURISM TANK
BLDG.
CE A
B U I L D I N G E X I S T I N G C O U R T ECE LAB
10.50
24.00
PROPOSED LOCATION OF UNIVERSITY LIBRARY
PROPOSED UNIVERISTY LIBRARY
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
BATAAN PENINSULA STATE UNIVERSITY
COMPLETION OF THIRD FLOOR LIBRARY AT MAIN CAMPUS
TENEJERO, BALANGA CITY
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
PERSPECTIVE VICINITY MAP MECHANICAL
ELECTRICAL SANITARY STRUCTURAL ARCHITECTURAL
LINE & GRADE LAND USE & ZONING
DISTRICT/CITY/MUNICIPALITY DEPARTMENT OF PUBLIC WORKS & HIGHWAYSREPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
ELECTRONICS SCHEDULE SHEET
ARCHITECTURAL
EXISTING E-LIBRAY
WHITE SCREEN AREA
ENTRY/ EXIT
RAMP UP
FIRE EXIT
E-LIBRARY
COUNTER
FIRE EXIT
BAGGAGE DEPOSITORY
UP UP
UP
LANDSCAPE AREA
SHELVES
CUBICLE FOR LIBRARIAN
SHELVES
SHELVES
LOW PARTITION
(36 UNITS)
GLASS
SHELVES SHELVES
OFFICE OF THE LIBRARIAN
(63.83 SQ.M)
SHELVESSHELVES
SHELVES SHELVES
DISCUSSION ROOM (23 SQ.M)
MEETING ROOM
MULTI-MEDIA ROOM (64 seats) (105 SQ.M)
CONTROL ROOM
SHELVES SHELVES SHELVES SHELVES
PERIODICAL SECTION
LOBBY
HE SHE
(22.05 SQ.M)
WALL SHELVES
GLASS
GLASS
GLASS GLASS WALL SHELVES
(55.55 SQ.M) DISCUSSION
ROOM (23 SQ.M)
SUPPLY OFFICE HE SHE
PANTRY
/ LOUNGE AREA
UP
(121 seats)
READING SECTION
(226.44 SQ.M)
TOILET COMMON
STORAGE
WW 1W 1W23
W 4
W 2
W 2
W 2
W 2
W 2
W 2
W 2
W 2
W 5
W 5
W 5 W 5 W 6
W 6
W 7 W2W 2W 2W 2W 2W 2W 8 D D
D D66 1
D 1
1 6 D 2D 2
7 D 2
8 D 3
D 4
D 5 D 5
D
D
UP
6 6D D
D
D
4 4
D
RAMP UP
D 8 W 8 UP
UP
UP GLASS
1008.70
D 9
D 9
COUNTER
3075.58 3575.59 4675.00
PIPE CHASE
FLOOR FINISH SCHEDULE PARTITION SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
BATAAN PENINSULA STATE UNIVERSITY TENEJERO BALANGA CITY
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)
EXISTING
GROUND FLOOR PLAN
COMPUTER SECTION HALLWAY HALLWAY
EXISTING
EXISTING EXISTING
1 2 3 4 5
ROOF BEAM LINE
FINISH GRADE LINE SECOND FLOOR LINE THIRD FLOOR LINE CEILING LINE LINE OF APEX
EXISTING SLOPE
SEE TRUSS DETAIL
PORCH
E A R T H
600.00
200.0000
READING SECTION
COMPUTER SECTION READING SECTION READING SECTION COFFEE SHOP LOBBY
HALLWAY TOILET FACILITY
EXISTING EXISTING
EXISTING
EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING
EXISTING EXISTING
EXISTING EXISTING
EXISTING EXISTING
EXISTING EXISTING
EXISTING
EXISTING
300.0000
ROOF BEAM LINE
FINISH GRADE LINE SECOND FLOOR LINE THIRD FLOOR LINE CEILING LINE LINE OF APEX
5344.2045
A B C D E F G H I J
EXISTING SLOPE
SEE TRUSS DETAIL
FLOOR FINISH SCHEDULE PARTITION SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
BATAAN PENINSULA STATE UNIVERSITY
COMPLETION OF THIRD FLOOR OF LIBRARY AT MAIN CAMPUS
TENEJERO BALANGA CITY
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)
FLASHING
CROSS SECTION LONGITUDINAL SECTION
DETAIL SECTION
BLOW-UP DETAIL
7
WALL SHELVES
CHECK DESK
WALL SHELVES
WALL SHELVES
BOOK SECTION
DOWN FIRE EXIT DOWN
TECHNICAL AREA
WALL SHELVESWALL SHELVESWALL SHELVES
(15.52 SQ.M)
(151.50 SQ.M)
SHELVESSHELVES LOW PARTITIONLOW PARTITION LOW PARTITION
COUNTER
PHOTOCOPYING AREA(406 seats)
READING SECTION
(325.91 SQ.M)
W2W 2W 2
W 3
W 2
W 7
W 7
W 7
W 7
7W
W 7
W 7
W 7 W 7 W 7 W 7 W 7 7W W
8W
W 7
W 77
W D 4
D 5 D 9D 9 UP
PIPE CHASE TO GROUND FLOOR
FLOOR FINISH SCHEDULE PARTITION SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
BATAAN PENINSULA STATE UNIVERSITY TENEJERO BALANGA CITY
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)
EXISTING SECOND FLOOR PLAN
DN
UP
40 SEATS
LOBBY 15 SEATS
READING SECTION (32 SEATS)
READING SECTION READING SECTION
40 SEATS READING SECTION
48 SEATS READING SECTION
COUNTER
HALLWAY
HALLWAY HALLWAY
HALLWAY HALLWAY
HALLWAY
A B C D E F G H I J
1 2
3
4
COFFEE SHOP
SHE SHE
SHE SHE
5
TOILET FAC.
(HE/MALE)
TOILET FAC.
(SHE/FEMALE)
STAIRWELL
TO SECOND FLOOR PIPE CHASE
ACU OUTDOOR UNIT ACU OUTDOOR UNIT ACU OUTDOOR UNIT
ACU OUTDOOR UNIT ACU OUTDOOR UNIT
ACU OUTDOOR UNIT
DN
FLOOR FINISH SCHEDULE PARTITION SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
BATAAN PENINSULA STATE UNIVERSITY
COMPLETION OF THIRD FLOOR OF LIBRARY AT MAIN CAMPUS
TENEJERO BALANGA CITY
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)
THIRD FLOOR PLAN
FINISH GRADE LINE ROOF BEAM LINE
SECOND FLOOR LINE LINE OF APEX
THIRD FLOOR LINE CEILING LINE
1 2 3 4 5
EXISTING SLOPE
5 4 3 2 1
FLOOR FINISH SCHEDULE PARTITION SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
BATAAN PENINSULA STATE UNIVERSITY TENEJERO BALANGA CITY
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)
FRONT ELEVATION
REAR ELEVATION
5344.2045
EXISTING EXISTING
EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING
EXISTING EXISTING
EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING
A B C D E F G H I J
ROOF BEAM LINE
SECOND FLOOR LINE THIRD FLOOR LINE CEILING LINE
LINE OF APEX
EXISTING SLOPE FINISH GRADE LINE
F F F F
ACU OUTDOOR UN IT
ACU OUTDOOR UNIT ACU OUTDOOR UN IT
F F F F
F F F F
F F F F
0.0000
F F
0.0000
F F
F F F F
FLOOR FINISH SCHEDULE PARTITION SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
BATAAN PENINSULA STATE UNIVERSITY
COMPLETION OF THIRD FLOOR OF LIBRARY AT MAIN CAMPUS
TENEJERO BALANGA CITY
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)
RIGHT SIDE ELEVATION
COMPUTER SECTION HALLWAY HALLWAY
EXISTING
EXISTING EXISTING
1 2 3 4 5
ROOF BEAM LINE
FINISH GRADE LINE SECOND FLOOR LINE THIRD FLOOR LINE CEILING LINE LINE OF APEX
EXISTING SLOPE
SEE TRUSS DETAIL
PORCH
E A R T H
600.00
200.0000
READING SECTION
COMPUTER SECTION READING SECTION READING SECTION COFFEE SHOP LOBBY
HALLWAY TOILET FACILITY
EXISTING EXISTING
EXISTING
EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING
EXISTING EXISTING
EXISTING EXISTING
EXISTING EXISTING
EXISTING EXISTING
EXISTING
EXISTING
300.0000
ROOF BEAM LINE
FINISH GRADE LINE SECOND FLOOR LINE THIRD FLOOR LINE CEILING LINE LINE OF APEX
5344.2045
A B C D E F G H I J
EXISTING SLOPE
SEE TRUSS DETAIL
FLOOR FINISH SCHEDULE PARTITION SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
BATAAN PENINSULA STATE UNIVERSITY TENEJERO BALANGA CITY
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)
FLASHING
CROSS SECTION LONGITUDINAL SECTION
DETAIL SECTION
BLOW-UP DETAIL
EXISTING SLOPE SECOND FLOOR LINE
THIRD FLOOR LINE
FINISH GRADE LINE ROOF BEAM LINE
LINE OF APEX
CEILING LINE
5344.2045
J I H G F E D C B A
EXISTING SLOPE
F
ACU OUTDOOR UN IT
ACU OUTDOOR UNIT ACU OUTDOOR UN IT
F F
F F F F F F F F F F
0.0000
F F
0.0000
F
F F F F F
FLOOR FINISH SCHEDULE PARTITION SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
BATAAN PENINSULA STATE UNIVERSITY
COMPLETION OF THIRD FLOOR OF LIBRARY AT MAIN CAMPUS
TENEJERO BALANGA CITY
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)
LEFT SIDE ELEVATION
co
D2
3 D
3 D
3 D 3
D 3D
3 D
LAV. LAV. LAV.
3 4
A
B
3 D
3 D
3 D
LAV. LAV. LAV. LAV.
co
D2
3 D
3 D
3 D 3
D 3D
3 D
LAV. LAV. LAV.
3 4
A
B
3 D
3 D
3 D
LAV. LAV. LAV. LAV.
FLOOR FINISH SCHEDULE PARTITION SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
BATAAN PENINSULA STATE UNIVERSITY TENEJERO BALANGA CITY
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)
TOILET FACILITY
SECTION
BLOW-UP PLAN
DOWN A
B
A
B
A
B
C
D
C
D
C
D
E
F
E
F H
O G
H
S2-bCD
G G
L L G
L G M
H H H
H
I H
G
H
I
G
G
M
G I
I I
H G
H
G
G I
H I
M H
Q
H H
N I
N L
L H
I
M M
L M
L M I
I
L
N
N L
I M
M
L L M
L
L
R O
O
O O
M M
Q
O O
L
N
O O
S
R N
Q N
R
O Q
Q O
N
N N
N
O
Q
R
Q
R R
P
O
N P
O
R P
P
R P
R
R P
P
P
Q Q
Q P
P P
R
Q
Q
R R
R
R R
Q P
R
R
Q
R
R R
R R
R R
R
R S
R
R R
3 R
S
R S
R R
S
R S
R R R
S
R S
S
S
S R
S
S S
S S
S
S
R S S
S
R
S
T S
S
S
T S U
R 2
S
U T
S
1
U J
J J
K K K K
J
w
M
M N N P P
L L N N P P
W W W W W W W W W W W W W W W W W W W
X X X X X X X X X X X X X X X X X X X
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z E Z
WL WL WL WL WL WL
WL WL WL WL WL WL
V V V
V V V
S3-123 5
5 5 5 5
5
4 4 4 4 4 4
S2-45
7X1 WATTS
DOWN LIGHT LED
7X1 WATTS DOWN LIGHT LED
9X1 WATTS DOWN LIGHT LED
PINLIGHT CASING E-27 SOCKETS
TRACKLIGHT 5 HEAD
PINLIGHT CASING SURFACE
MOUNTED, E-27 SOCKET W/ LED 18 WATTS
7X1 WATTS DOWN LIGHT LED
COVE LIGHT W/ LED STRIPLIGHT 7X1 WATTS
DOWN LIGHT LED
30" DECORATIVE CEILING PAN WITH 5 LIGHTS AND BLADES
5 HEAD TRACKLIGHT
PENDANT LIGHT
7X1 WATTS DOWN LIGHT LED
SUSPENDED ALUMINUM LED PROFILE WITH LED STRIPLIGHT
WALL LAMP WITH 12W LED BULB
1903.5000
PIPE CHASE
PINLIGHT CASING SURFACE
MOUNTED, E-27 SOCKET W/ LED 18 WATTS
a a a a a a
a a
a
a
a
b
b
b
b
b
b
b b
b b c
c
c
c c c c c c c c c
d d
d d
d d
d d
d
PINLIGHT CASING SURFACE MOUNTED, E-27 SOCKET
WITH LED BULB E,27 SOCKET FIRE EXIT
S3-567 S2-V1 S3-234 S3-TUZ S3-LNP S3-MOQ S3-EFf
S2-RS S2-JK S3-GHI
S1-WXY
W/ LED 18 WATTS
ff f f f f
f f f f f f f f f
f f f f f f
CF-1 CF-3
CF-1 CF-4
CF-1 CF-3
CF-1 CF-1
CF-1 CF-1
CF-1 CF-4
CF-4 CF-4
CF-4 CF-4 CF-4 CF-4 CF-4
CF-1 CF-1 CF-1
CF-1 CF-1
CF-1
CF-1 CF-1
CF-1
CF-4
CEILING FINISH SCHEDULE PARTITION SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
COMPLETION OF THIRD FLOOR OF LIBRARY AT MAIN CAMPUS
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
(FOR ARCHITECT'S APPROVAL) SYMBOLS AND LEGENDS (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)
RCP PLAN
WL
TRACKLIGHT 5 HEAD
7X1 WATTS DOWN LIGHT LED
PENDANT LIGHT W/LED BULB E,27 SOCKET
WALL LAMP WITH 12W LED BULB
30" DECORATIVE CEILING PAN WITH 5 LIGHTS AND BLADES
PINLIGHT CASING E-27 SOCKETS
BATAAN PENINSULA STATE UNIVERSTY TENEJERO BALANGA CITY
A
B
A
B
A
B
C
D
C
D
C
D
E
F
E
F H
G
H
S2-bCD
G G
G G
H H H
H
I H
G
H
I
G
G G
I
I I
H G
H
G
G I
H I
H H H
I
H
I I
I I
J J J
K K K K
J E
WL WL WL
WL WL WL
5 5
4 4
7X1 WATTS DOWN LIGHT LED
7X1 WATTS DOWN LIGHT LED
9X1 WATTS DOWN LIGHT LED
PINLIGHT CASING E-27 SOCKETS
TRACKLIGHT 5 HEAD
5 HEAD TRACKLIGHT
PENDANT LIGHT
PIPE CHASE a
a a a a a
a a
a
a
a
b
b
b
b
b
b
b b
b b c
c
c
c c c c
d d
d d
PINLIGHT CASING SURFACE MOUNTED, E-27 SOCKET
WITH LED BULB E,27 SOCKET FIRE EXIT
W/ LED 18 WATTS
ff f f f f
f f f f f f f f f
f f f f f f
CF-1 CF-1
CF-1
CF-1 CF-1
CF-1
CF-4
TOILET FACILITY
CF-1
HALLWAY
PINLIGHT CASING E-27 SOCKET
PINLIGHT CASING E-27 SOCKET
PINLIGHT CASING E-27 SOCKET
CF-4
READING SECTION
CF-1
COMPUTER SECTION
7X1 WATTS LED
DOWN LIGHT 7X1 WATTS LED
DOWN LIGHT PENDANT LIGHT
CF-1 CF-3
CF-1
CEILING FINISH SCHEDULE SYMBOLS AND LEGENDS
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
(FOR ARCHITECT'S APPROVAL) SYMBOLS AND LEGENDS (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)
WL
TRACKLIGHT 5 HEAD
7X1 WATTS DOWN LIGHT LED
PENDANT LIGHT W/LED BULB E,27 SOCKET
WALL LAMP WITH 12W LED BULB
TRACKLIGHT 5 HEAD
30" DECORATIVE CEILING PAN WITH 5 LIGHTS AND BLADES
PINLIGHT CASING E-27 SOCKETS
RCP PLAN BLOW-UP PLAN
BATAAN PENINSULA STATE UNIVERSTY TENEJERO BALANGA CITY
DOWN
O L
L L
M
M
M
Q
N N L
L M M
L M
L M
L
N
N L
M M
L L M
L
L
R O
O
O O
M M
Q
O O
L
N
O O
S
R N
Q N
R
O Q
Q O
N
N N
N
O
Q
R
Q
R R
P
O
N P
O
R P
P
R P
R
R P
P
P
Q Q
Q P
P P
R
Q
Q
R R
R
R R
Q P
R
R
Q
R
R R
R R
R R
R
R S
R
R R
3 R
S
R S
R R
S
R S
R R R
S
R S
S
S
S R
S
S S
S S
S
S
R S S
S
R
S
T S
S
S
T U S
2 R
S
U T
S
1
U
w
M
M N N P P
L L N N P P
W W W W W W W W W W W W W W W W W W W
X X X X X X X X X X X X X X X X X X X
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z
WL WL WL WL
WL WL WL WL
V V V
V V V
S3-123 5
5 5 5
4 4 4 4
S2-45
PINLIGHT CASING SURFACE
MOUNTED, E-27 SOCKET W/ LED 18 WATTS
7X1 WATTS DOWN LIGHT LED
COVE LIGHT W/ LED STRIPLIGHT 7X1 WATTS
DOWN LIGHT LED
30" DECORATIVE CEILING PAN WITH 5 LIGHTS AND BLADES 7X1 WATTS
DOWN LIGHT LED
SUSPENDED ALUMINUM LED PROFILE WITH LED STRIPLIGHT
WALL LAMP WITH 12W LED BULB
PINLIGHT CASING SURFACE
MOUNTED, E-27 SOCKET W/ LED 18 WATTS
c c c c c
d d
d d
d
S3-567 S2-V1 S3-234 S3-TUZ S3-LNP S3-MOQ S3-EFf
S2-RS S2-JK S3-GHI
S1-WXY
CF-1 CF-4
CF-1
CF-1 CF-3 CF-1
CF-1
CF-1 CF-4 CF-4
CF-4 CF-4 CF-4 CF-4 CF-4
CF-1 CF-1 CF-1
30" DECORATIVE CEILING PAN WITH 5 LIGHTS AND 4 BLADES
COVE LIGHT 9X1 WATTS LED
W/ LED STRIPLIGHT
LOBBY
CF-1 CF-2
CF-2 CF-3
READING SECTION
7X1 WATTS LED
DOWN LIGHT 7X1 WATTS LED
DOWN LIGHT 7X1 WATTS LED
DOWN LIGHT
CF-1 CF-3 CF-1 CF-3 CF-1
COFFEE SHOP
SUSPENDED ALUMINUM
PINLIGHT CASING
PENDANT LIGHT PENDANT LIGHT
PENDANT LIGHT PENDANT LIGHT
SURFACE MOUNTED
LED PROFILE WITH LED STRIP LIGHT
E-27 SOCKET
W/ LED BULB E,
PINLIGHT CASING SURFACE MOUNTED E-27 SOCKET
27 SOCKET
W/ LED BULB E, 27 SOCKET
W/ LED BULB E, 27 SOCKET
W/ LED BULB E, 27 SOCKET PINLIGHT CASING SURFACE MOUNTED E-27 SOCKET
CF-4 CF-4 CF-4 CF-4
CEILING FINISH SCHEDULE PARTITION SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
COMPLETION OF THIRD FLOOR OF LIBRARY AT MAIN CAMPUS
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)
RCP PLAN BLOW-UP PLAN
BATAAN PENINSULA STATE UNIVERSTY TENEJERO BALANGA CITY
TOILET FACILITY
7X1 WATTS LED DOWN LIGHT
CF-1
HALLWAY
E-27 SOCKET
PINLIGHT CASING E-27 SOCKET
PINLIGHT CASING E-27 SOCKET
CF-4
COMPUTER SECTION
DOWN LIGHT DOWN LIGHT PENDANT LIGHT
CF-1 CF-3
CF-1
READING SECTION
TRACK LIGHT 5 HEAD
CF-1
READING SECTION
7X1 WATTS LED
DOWN LIGHT 7X1 WATTS LED
DOWN LIGHT 7X1 WATTS LED
DOWN LIGHT
CF-1 CF-3 CF-1 CF-3 CF-1
COFFEE SHOP
SUSPENDED ALUMINUM
PINLIGHT CASING
PENDANT LIGHT PENDANT LIGHT
PENDANT LIGHT PENDANT LIGHT
SURFACE MOUNTED
LED PROFILE WITH LED STRIP LIGHT
E-27 SOCKET
W/ LED BULB E,
PINLIGHT CASING SURFACE MOUNTED E-27 SOCKET
27 SOCKET
W/ LED BULB E, 27 SOCKET
W/ LED BULB E, 27 SOCKET
W/ LED BULB E, 27 SOCKET PINLIGHT CASING SURFACE MOUNTED E-27 SOCKET
CF-4 CF-4 CF-4 CF-4
30" DECORATIVE CEILING PAN WITH 5 LIGHTS AND 4 BLADES
COVE LIGHT 9X1 WATTS LED
W/ LED STRIPLIGHT
LOBBY
CF-1 CF-2
CF-2 CF-3
CEILING FINISH SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
(FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)
PERSPECTIVE SITE DEVELOPMENT PLAN VICINITY MAP
CEILING FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL) SYMBOLS AND LEGENDS (FOR ARCHITECT'S APPROVAL) SYMBOLS AND LEGENDS (FOR ARCHITECT'S APPROVAL)
WL
TRACKLIGHT 5 HEAD
7X1 WATTS DOWN LIGHT LED
PENDANT LIGHT W/LED BULB E,27 SOCKET
WALL LAMP WITH 12W LED BULB
TRACKLIGHT 5 HEAD
30" DECORATIVE CEILING PAN WITH 5 LIGHTS AND BLADES
PINLIGHT CASING E-27 SOCKETS
BATAAN PENINSULA STATE UNIVERSTY TENEJERO BALANGA CITY
DOWN
UP
A
B
A
B
A
B
C
D
C
D
C
D
E
F
E
F S3-aAB
S3-bCD
G G
G G
G G
G G
G G
G G
H H H H H H
H H H H H H
H H H
I I
I I
I I
I I
I I
I I
J J J
K K K
K M M
L L
M M
L L
M M
L L
M M
L L
M M
L L
M M
O O
N N
O O
N N
O O
N N
O O
N N
O O
N N
O O
N N
O O
Q Q
P P
Q Q
P P
Q Q
P P
Q Q
P P
Q Q
P P
Q Q
P P
Q Q
T
T
T U
U
U 2
3
4 1
M M
L L
4
5
13
8 7
9
18
34 14
19
15
20
16
21
L L N N P P
L L N N P P
17
R R R R
R R R R R
R R R R R
R R R R R
R R R R R
R R R R R
R R R R R
S S S S R
S S S S R
S S S S R
S S S S R
S S S S R
S S S S R
S S S S R
R 22
23
24
25
26
27
28 W W W W W W W W W W W W W W W W W W W W
29 30 31 32
X
f
f f f f f
f f f f f f f f f
f f f f f V
1 X
X X X X X X X X X X X X X X X X X X
Y Y
Y Y Y Y Y Y Y
Y Y
Y Y
Y Y Y Y Y Y Y
Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z J
F 6
35
V V V
V V V
WL WL WL WL WL WL
7 7 6
7 6 6
10
WL WL WL WL WL
6 7 6 7 6 7
WL
11
12
33
S3-TUZ S3-LNP S3-MOQ S3-EFf
S2-RS S2-JK S3-GHI
S1-WXY 5
S2-V1
PIPE CHASE a
a a a a a
a a
a
a
a
b
b
b
b
b
b
b b
b b c
c
c
d e
2
3
S3-cde
S3-234
d e d e d e d e d e d
g h g h g h g h g h g h g
S3-cde S3-bCD S3-567 S3-567 S3-bCD S2-gh
FLOOR FINISH SCHEDULE PARTITION SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
BATAAN PENINSULA STATE UNIVERSITY
COMPLETION OF THIRD FLOOR OF LIBRARY AT MAIN CAMPUS
TENEJERO BALANGA CITY
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)
LIGHTING LAYOUT
BLOW-UP LIGHTING LAYOUT
DOWN
UP
38 37
36
FO FO FO FO FO FO FO FO FO FO FO FO
FO FO FO
FO
FO FO
FO
FO FO
FO FO FO FO
FO
FO FO
FO
FO
FO
FO HD
HD
acu acu
39 41 40
42
46 45
43 44
PIPE CHASE
FLOOR FINISH SCHEDULE PARTITION SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
BATAAN PENINSULA STATE UNIVERSITY TENEJERO BALANGA CITY
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)
POWER LAYOUT
UP
coWC LAV.
WC WC
WC WC
WC WC
LAV.
LAV.
LAV.
LAV.
WC
WC
WC
LAV.
LAV.
PIPE CHASE
LAV.
co co
co URINAL URINAL URINAL
URINAL
VENT THROUGH ROOF
UP
coLAV.
WC WC
WC WC
FROM WATER LINE BELOW
WC LAV.
URINAL URINAL
LAV.
URINAL
LAV.
URINAL LAV.
WC LAV.
LAV.
WC WC
LAV.
WC
WC CO CO CO CO
125mm THK. CHB MANHOLE 12mm REINF. BAR
100mm Ø PVC PIPE
SPACE @ 250mm O.C. B.W
100mm Ø PVC PIPE
MANHOLE MANHOLE
SC-1
SC-1 SC-1
SC-1
CO CO
CO CO
125mm THK. CHB MANHOLE 12mm REINF. BAR
100mm Ø PVC PIPE
SPACE @ 250mm O.C. B.W
100mm Ø PVC PIPE
MANHOLE MANHOLE
SC-1
SC-1 SC-1
SC-1
GROUND LINE
OUTLET
75 MMØ OUTLET PIPE PRECAST CONC. COVER
DIGESTION CHAMBER LEACHING
TO CNM SEWER LINE
100 MMØ VERT. BARS @ 800mm O.C. AND 100mm Ø HOR.
BARS @ EVERY 3ND COURSE
SLOPE = 10% SLOPE = 10%
125 MM CHB.
w/ 10MMØ HOR./VERT.
BARS @ 400 O.C. B.W.
12MMØ @ 250 O.C. B.W.
12MMØ BARS SPACED
@ 200MM O.C. B.W.
LIQUID
CO
CO CO
CO
LEACHING CHAMBER CHAMBER CHAMBER LEACHING CHAMBER PRECAST CONC. COVER GROUND LINE
OUTLET
75 MMØ OUTLET PIPE PRECAST CONC. COVER
DIGESTION CHAMBER LEACHING
100 MMØ VERT. BARS @ 800mm O.C. AND 100mm Ø HOR.
BARS @ EVERY 3ND COURSE
SLOPE = 10% SLOPE = 10%
125 MM CHB.
w/ 10MMØ HOR./VERT.
BARS @ 400 O.C. B.W.
12MMØ @ 250 O.C. B.W.
@ 200MM O.C. B.W.
12MMØ BARS SPACED LIQUID
CO
CO CO
CO
PRECAST CONC. COVER
10 MM EXPANSION BOLT
5" CHB
3.5 MM ANGLE BAR
2"X2" TUBULAR BAR
FLOOR FINISH SCHEDULE PARTITION SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
BATAAN PENINSULA STATE UNIVERSITY
COMPLETION OF THIRD FLOOR OF LIBRARY AT MAIN CAMPUS
TENEJERO BALANGA CITY
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)
SEWER LINE LAYOUT WATER LINE LAYOUT SEPTIC TANK DETAIL PIPE CHASE DETAIL
DOWN
UP
48
BELL
BELL 47
#16 TWISTED WIRE (BLACK & RED OR WHITE & RED) TAP TO FACP (FIRE ALARM CONTROL PANEL) TAP TO FACP (FIRE ALARM CONTROL PANEL)
#16 TWISTED WIRE (BLACK & RED OR WHITE & RED)
PIPE CHASE
FLOOR FINISH SCHEDULE PARTITION SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
BATAAN PENINSULA STATE UNIVERSITY TENEJERO BALANGA CITY
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)
SMOKE DETECTOR LAYOUT
BUILDING LINE
ROOF LINE DOWNSPOUT
ROOF OF SLAB
FLOOR FINISH SCHEDULE PARTITION SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
BATAAN PENINSULA STATE UNIVERSITY
COMPLETION OF THIRD FLOOR OF LIBRARY AT MAIN CAMPUS
TENEJERO BALANGA CITY
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER:
(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)
ROOF FRAMING PLAN
25 26 27 28 29 30 31 32
35 36 37 38 39 40 41 42 43 10
13 5 4
6 7
9 3
11 1
12 2
8
14
17
19 18 16 15
20 21 22
33 34
44 45 46 23
24
47 48
27 28
1 2
3 4
6 5
7
10 8
9
12 11
14 13
15 16
17 18
19 20
25 26
29 30
31 32
33 34
35 36
38 37
39
42 40
41
44 43
P P
A B
MDP
21 22 45 46
23 24 47 48
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
BATAAN PENINSULA STATE UNIVERSTY TENEJERO BALANGA CITY
WINDOW TYPE - 1
LOCATION :
SPECIFICATION:
SETS REQUIRED:
4 SETS
TYPE:
LOCKSET:
LOCATION :
SPECIFICATION:
0.0000
WINDOW TYPE - 2
SETS REQUIRED:
8 SETS
TYPE:
LOCKSET:
WINDOW TYPE - 2
LOCATION :
SPECIFICATION:
SETS REQUIRED:
2 SETS
TYPE:
LOCKSET:
F F
F
WINDOW TYPE - 2
F
F
LOCATION :
SPECIFICATION:
SETS REQUIRED:
TYPE:
6 SETS
LOCKSET:
F
DOOR TYPE - D-1
LOCATION :
TYPE :
HINGES :
6 SET
SETS REQUIRED:
CASING:
LOCKSET/
HANDLE:
FRAMING / JAMB:
DOOR TYPE - D-2
LOCATION :
HINGES : CASING:
TYPE :
SETS REQUIRED:
2 SET
FRAMING / JAMB:
LOCKSET/
HANDLE:
DOOR TYPE - D-2
LOCATION :
HINGES : CASING:
TYPE :
SETS REQUIRED:
10 SETS
FRAMING / JAMB:
LOCKSET/
HANDLE:
300.0000
BATAAN PENINSULA STATE UNIVERSITY
BATAAN PENINSULA STATE UNIVERSTY
COMPLETION OF THIRD FLOOR OF LIBRARY AT MAIN CAMPUS
TENEJERO BALANGA CITY
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
ARCHITECT II, TWG CONSULTANT
AR. DANILO Y. GALURA
REVIEWED BY:
SHEET NUMBER: