• Tidak ada hasil yang ditemukan

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

N/A
N/A
Protected

Academic year: 2023

Membagikan "AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ"

Copied!
21
0
0

Teks penuh

(1)

AUDITOR'S OFFICE ELECTRONICS

FOOD TECH.

SARI GAMIT COURT MECHANICAL

TECHNOLOGY

MECHANICAL TECHNOLOGY

AUTOMOTIVE AVR DRAWING BLDG. OSA

LIBRARY CR WELDING AND FABRICATION TECH.

FOUNDRY ARCH. LAB CEME LAB

INT'L.

CENTER

PATVEP

WAF WAF

SCIENCE ROOM H.Q.

CR H.Q. 2

ELECTRONICS ELECTRONICS

ELECTRONICS

CR CR

GRAD SCHOOL I.C.T.

I.C.T.

E.S.F.

E. POST E. POST

TANGHAL LIKHA MAIN GATE PATVEP

CANTEEN

CSC BUILDING WATER

TANK

ADMINISTRATION BUILDING BASKETBALLCOURT

V . P . OFFICE

CANTEEN WATER TOURISM TANK

BLDG.

CE A

B U I L D I N G E X I S T I N G C O U R T ECE LAB

10.50

24.00

PROPOSED LOCATION OF UNIVERSITY LIBRARY

PROPOSED UNIVERISTY LIBRARY

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

BATAAN PENINSULA STATE UNIVERSITY

COMPLETION OF THIRD FLOOR LIBRARY AT MAIN CAMPUS

TENEJERO, BALANGA CITY

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

PERSPECTIVE VICINITY MAP MECHANICAL

ELECTRICAL SANITARY STRUCTURAL ARCHITECTURAL

LINE & GRADE LAND USE & ZONING

DISTRICT/CITY/MUNICIPALITY DEPARTMENT OF PUBLIC WORKS & HIGHWAYSREPUBLIC OF THE PHILIPPINES

OFFICE OF THE BUILDING OFFICIAL

ELECTRONICS SCHEDULE SHEET

ARCHITECTURAL

EXISTING E-LIBRAY

(2)

WHITE SCREEN AREA

ENTRY/ EXIT

RAMP UP

FIRE EXIT

E-LIBRARY

COUNTER

FIRE EXIT

BAGGAGE DEPOSITORY

UP UP

UP

LANDSCAPE AREA

SHELVES

CUBICLE FOR LIBRARIAN

SHELVES

SHELVES

LOW PARTITION

(36 UNITS)

GLASS

SHELVES SHELVES

OFFICE OF THE LIBRARIAN

(63.83 SQ.M)

SHELVES

SHELVES

SHELVES SHELVES

DISCUSSION ROOM (23 SQ.M)

MEETING ROOM

MULTI-MEDIA ROOM (64 seats) (105 SQ.M)

CONTROL ROOM

SHELVES SHELVES SHELVES SHELVES

PERIODICAL SECTION

LOBBY

HE SHE

(22.05 SQ.M)

WALL SHELVES

GLASS

GLASS

GLASS GLASS WALL SHELVES

(55.55 SQ.M) DISCUSSION

ROOM (23 SQ.M)

SUPPLY OFFICE HE SHE

PANTRY

/ LOUNGE AREA

UP

(121 seats)

READING SECTION

(226.44 SQ.M)

TOILET COMMON

STORAGE

WW 1W 1W23

W 4

W 2

W 2

W 2

W 2

W 2

W 2

W 2

W 2

W 5

W 5

W 5 W 5 W 6

W 6

W 7 W2W 2W 2W 2W 2W 2W 8 D D

D D66 1

D 1

1 6 D 2D 2

7 D 2

8 D 3

D 4

D 5 D 5

D

D

UP

6 6D D

D

D

4 4

D

RAMP UP

D 8 W 8 UP

UP

UP GLASS

1008.70

D 9

D 9

COUNTER

3075.58 3575.59 4675.00

PIPE CHASE

FLOOR FINISH SCHEDULE PARTITION SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

BATAAN PENINSULA STATE UNIVERSITY TENEJERO BALANGA CITY

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)

EXISTING

GROUND FLOOR PLAN

(3)

COMPUTER SECTION HALLWAY HALLWAY

EXISTING

EXISTING EXISTING

1 2 3 4 5

ROOF BEAM LINE

FINISH GRADE LINE SECOND FLOOR LINE THIRD FLOOR LINE CEILING LINE LINE OF APEX

EXISTING SLOPE

SEE TRUSS DETAIL

PORCH

E A R T H

600.00

200.0000

READING SECTION

COMPUTER SECTION READING SECTION READING SECTION COFFEE SHOP LOBBY

HALLWAY TOILET FACILITY

EXISTING EXISTING

EXISTING

EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING

EXISTING EXISTING

EXISTING EXISTING

EXISTING EXISTING

EXISTING EXISTING

EXISTING

EXISTING

300.0000

ROOF BEAM LINE

FINISH GRADE LINE SECOND FLOOR LINE THIRD FLOOR LINE CEILING LINE LINE OF APEX

5344.2045

A B C D E F G H I J

EXISTING SLOPE

SEE TRUSS DETAIL

FLOOR FINISH SCHEDULE PARTITION SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

BATAAN PENINSULA STATE UNIVERSITY

COMPLETION OF THIRD FLOOR OF LIBRARY AT MAIN CAMPUS

TENEJERO BALANGA CITY

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)

FLASHING

CROSS SECTION LONGITUDINAL SECTION

DETAIL SECTION

BLOW-UP DETAIL

(4)

7

WALL SHELVES

CHECK DESK

WALL SHELVES

WALL SHELVES

BOOK SECTION

DOWN FIRE EXIT DOWN

TECHNICAL AREA

WALL SHELVESWALL SHELVESWALL SHELVES

(15.52 SQ.M)

(151.50 SQ.M)

SHELVESSHELVES LOW PARTITIONLOW PARTITION LOW PARTITION

COUNTER

PHOTOCOPYING AREA

(406 seats)

READING SECTION

(325.91 SQ.M)

W2W 2W 2

W 3

W 2

W 7

W 7

W 7

W 7

7W

W 7

W 7

W 7 W 7 W 7 W 7 W 7 7W W

8W

W 7

W 77

W D 4

D 5 D 9D 9 UP

PIPE CHASE TO GROUND FLOOR

FLOOR FINISH SCHEDULE PARTITION SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

BATAAN PENINSULA STATE UNIVERSITY TENEJERO BALANGA CITY

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)

EXISTING SECOND FLOOR PLAN

(5)

DN

UP

40 SEATS

LOBBY 15 SEATS

READING SECTION (32 SEATS)

READING SECTION READING SECTION

40 SEATS READING SECTION

48 SEATS READING SECTION

COUNTER

HALLWAY

HALLWAY HALLWAY

HALLWAY HALLWAY

HALLWAY

A B C D E F G H I J

1 2

3

4

COFFEE SHOP

SHE SHE

SHE SHE

5

TOILET FAC.

(HE/MALE)

TOILET FAC.

(SHE/FEMALE)

STAIRWELL

TO SECOND FLOOR PIPE CHASE

ACU OUTDOOR UNIT ACU OUTDOOR UNIT ACU OUTDOOR UNIT

ACU OUTDOOR UNIT ACU OUTDOOR UNIT

ACU OUTDOOR UNIT

DN

FLOOR FINISH SCHEDULE PARTITION SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

BATAAN PENINSULA STATE UNIVERSITY

COMPLETION OF THIRD FLOOR OF LIBRARY AT MAIN CAMPUS

TENEJERO BALANGA CITY

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)

THIRD FLOOR PLAN

(6)

FINISH GRADE LINE ROOF BEAM LINE

SECOND FLOOR LINE LINE OF APEX

THIRD FLOOR LINE CEILING LINE

1 2 3 4 5

EXISTING SLOPE

5 4 3 2 1

FLOOR FINISH SCHEDULE PARTITION SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

BATAAN PENINSULA STATE UNIVERSITY TENEJERO BALANGA CITY

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)

FRONT ELEVATION

REAR ELEVATION

(7)

5344.2045

EXISTING EXISTING

EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING

EXISTING EXISTING

EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING

A B C D E F G H I J

ROOF BEAM LINE

SECOND FLOOR LINE THIRD FLOOR LINE CEILING LINE

LINE OF APEX

EXISTING SLOPE FINISH GRADE LINE

F F F F

ACU OUTDOOR UN IT

ACU OUTDOOR UNIT ACU OUTDOOR UN IT

F F F F

F F F F

F F F F

0.0000

F F

0.0000

F F

F F F F

FLOOR FINISH SCHEDULE PARTITION SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

BATAAN PENINSULA STATE UNIVERSITY

COMPLETION OF THIRD FLOOR OF LIBRARY AT MAIN CAMPUS

TENEJERO BALANGA CITY

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)

RIGHT SIDE ELEVATION

(8)

COMPUTER SECTION HALLWAY HALLWAY

EXISTING

EXISTING EXISTING

1 2 3 4 5

ROOF BEAM LINE

FINISH GRADE LINE SECOND FLOOR LINE THIRD FLOOR LINE CEILING LINE LINE OF APEX

EXISTING SLOPE

SEE TRUSS DETAIL

PORCH

E A R T H

600.00

200.0000

READING SECTION

COMPUTER SECTION READING SECTION READING SECTION COFFEE SHOP LOBBY

HALLWAY TOILET FACILITY

EXISTING EXISTING

EXISTING

EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING

EXISTING EXISTING

EXISTING EXISTING

EXISTING EXISTING

EXISTING EXISTING

EXISTING

EXISTING

300.0000

ROOF BEAM LINE

FINISH GRADE LINE SECOND FLOOR LINE THIRD FLOOR LINE CEILING LINE LINE OF APEX

5344.2045

A B C D E F G H I J

EXISTING SLOPE

SEE TRUSS DETAIL

FLOOR FINISH SCHEDULE PARTITION SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

BATAAN PENINSULA STATE UNIVERSITY TENEJERO BALANGA CITY

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)

FLASHING

CROSS SECTION LONGITUDINAL SECTION

DETAIL SECTION

BLOW-UP DETAIL

(9)

EXISTING SLOPE SECOND FLOOR LINE

THIRD FLOOR LINE

FINISH GRADE LINE ROOF BEAM LINE

LINE OF APEX

CEILING LINE

5344.2045

J I H G F E D C B A

EXISTING SLOPE

F

ACU OUTDOOR UN IT

ACU OUTDOOR UNIT ACU OUTDOOR UN IT

F F

F F F F F F F F F F

0.0000

F F

0.0000

F

F F F F F

FLOOR FINISH SCHEDULE PARTITION SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

BATAAN PENINSULA STATE UNIVERSITY

COMPLETION OF THIRD FLOOR OF LIBRARY AT MAIN CAMPUS

TENEJERO BALANGA CITY

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)

LEFT SIDE ELEVATION

(10)

co

D2

3 D

3 D

3 D 3

D 3D

3 D

LAV. LAV. LAV.

3 4

A

B

3 D

3 D

3 D

LAV. LAV. LAV. LAV.

co

D2

3 D

3 D

3 D 3

D 3D

3 D

LAV. LAV. LAV.

3 4

A

B

3 D

3 D

3 D

LAV. LAV. LAV. LAV.

FLOOR FINISH SCHEDULE PARTITION SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

BATAAN PENINSULA STATE UNIVERSITY TENEJERO BALANGA CITY

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)

TOILET FACILITY

SECTION

BLOW-UP PLAN

(11)

DOWN A

B

A

B

A

B

C

D

C

D

C

D

E

F

E

F H

O G

H

S2-bCD

G G

L L G

L G M

H H H

H

I H

G

H

I

G

G

M

G I

I I

H G

H

G

G I

H I

M H

Q

H H

N I

N L

L H

I

M M

L M

L M I

I

L

N

N L

I M

M

L L M

L

L

R O

O

O O

M M

Q

O O

L

N

O O

S

R N

Q N

R

O Q

Q O

N

N N

N

O

Q

R

Q

R R

P

O

N P

O

R P

P

R P

R

R P

P

P

Q Q

Q P

P P

R

Q

Q

R R

R

R R

Q P

R

R

Q

R

R R

R R

R R

R

R S

R

R R

3 R

S

R S

R R

S

R S

R R R

S

R S

S

S

S R

S

S S

S S

S

S

R S S

S

R

S

T S

S

S

T S U

R 2

S

U T

S

1

U J

J J

K K K K

J

w

M

M N N P P

L L N N P P

W W W W W W W W W W W W W W W W W W W

X X X X X X X X X X X X X X X X X X X

Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y

Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z E Z

WL WL WL WL WL WL

WL WL WL WL WL WL

V V V

V V V

S3-123 5

5 5 5 5

5

4 4 4 4 4 4

S2-45

7X1 WATTS

DOWN LIGHT LED

7X1 WATTS DOWN LIGHT LED

9X1 WATTS DOWN LIGHT LED

PINLIGHT CASING E-27 SOCKETS

TRACKLIGHT 5 HEAD

PINLIGHT CASING SURFACE

MOUNTED, E-27 SOCKET W/ LED 18 WATTS

7X1 WATTS DOWN LIGHT LED

COVE LIGHT W/ LED STRIPLIGHT 7X1 WATTS

DOWN LIGHT LED

30" DECORATIVE CEILING PAN WITH 5 LIGHTS AND BLADES

5 HEAD TRACKLIGHT

PENDANT LIGHT

7X1 WATTS DOWN LIGHT LED

SUSPENDED ALUMINUM LED PROFILE WITH LED STRIPLIGHT

WALL LAMP WITH 12W LED BULB

1903.5000

PIPE CHASE

PINLIGHT CASING SURFACE

MOUNTED, E-27 SOCKET W/ LED 18 WATTS

a a a a a a

a a

a

a

a

b

b

b

b

b

b

b b

b b c

c

c

c c c c c c c c c

d d

d d

d d

d d

d

PINLIGHT CASING SURFACE MOUNTED, E-27 SOCKET

WITH LED BULB E,27 SOCKET FIRE EXIT

S3-567 S2-V1 S3-234 S3-TUZ S3-LNP S3-MOQ S3-EFf

S2-RS S2-JK S3-GHI

S1-WXY

W/ LED 18 WATTS

f

f f f f f

f f f f f f f f f

f f f f f f

CF-1 CF-3

CF-1 CF-4

CF-1 CF-3

CF-1 CF-1

CF-1 CF-1

CF-1 CF-4

CF-4 CF-4

CF-4 CF-4 CF-4 CF-4 CF-4

CF-1 CF-1 CF-1

CF-1 CF-1

CF-1

CF-1 CF-1

CF-1

CF-4

CEILING FINISH SCHEDULE PARTITION SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

COMPLETION OF THIRD FLOOR OF LIBRARY AT MAIN CAMPUS

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

(FOR ARCHITECT'S APPROVAL) SYMBOLS AND LEGENDS (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)

RCP PLAN

WL

TRACKLIGHT 5 HEAD

7X1 WATTS DOWN LIGHT LED

PENDANT LIGHT W/LED BULB E,27 SOCKET

WALL LAMP WITH 12W LED BULB

30" DECORATIVE CEILING PAN WITH 5 LIGHTS AND BLADES

PINLIGHT CASING E-27 SOCKETS

BATAAN PENINSULA STATE UNIVERSTY TENEJERO BALANGA CITY

(12)

A

B

A

B

A

B

C

D

C

D

C

D

E

F

E

F H

G

H

S2-bCD

G G

G G

H H H

H

I H

G

H

I

G

G G

I

I I

H G

H

G

G I

H I

H H H

I

H

I I

I I

J J J

K K K K

J E

WL WL WL

WL WL WL

5 5

4 4

7X1 WATTS DOWN LIGHT LED

7X1 WATTS DOWN LIGHT LED

9X1 WATTS DOWN LIGHT LED

PINLIGHT CASING E-27 SOCKETS

TRACKLIGHT 5 HEAD

5 HEAD TRACKLIGHT

PENDANT LIGHT

PIPE CHASE a

a a a a a

a a

a

a

a

b

b

b

b

b

b

b b

b b c

c

c

c c c c

d d

d d

PINLIGHT CASING SURFACE MOUNTED, E-27 SOCKET

WITH LED BULB E,27 SOCKET FIRE EXIT

W/ LED 18 WATTS

f

f f f f f

f f f f f f f f f

f f f f f f

CF-1 CF-1

CF-1

CF-1 CF-1

CF-1

CF-4

TOILET FACILITY

CF-1

HALLWAY

PINLIGHT CASING E-27 SOCKET

PINLIGHT CASING E-27 SOCKET

PINLIGHT CASING E-27 SOCKET

CF-4

READING SECTION

CF-1

COMPUTER SECTION

7X1 WATTS LED

DOWN LIGHT 7X1 WATTS LED

DOWN LIGHT PENDANT LIGHT

CF-1 CF-3

CF-1

CEILING FINISH SCHEDULE SYMBOLS AND LEGENDS

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

(FOR ARCHITECT'S APPROVAL) SYMBOLS AND LEGENDS (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)

WL

TRACKLIGHT 5 HEAD

7X1 WATTS DOWN LIGHT LED

PENDANT LIGHT W/LED BULB E,27 SOCKET

WALL LAMP WITH 12W LED BULB

TRACKLIGHT 5 HEAD

30" DECORATIVE CEILING PAN WITH 5 LIGHTS AND BLADES

PINLIGHT CASING E-27 SOCKETS

RCP PLAN BLOW-UP PLAN

BATAAN PENINSULA STATE UNIVERSTY TENEJERO BALANGA CITY

(13)

DOWN

O L

L L

M

M

M

Q

N N L

L M M

L M

L M

L

N

N L

M M

L L M

L

L

R O

O

O O

M M

Q

O O

L

N

O O

S

R N

Q N

R

O Q

Q O

N

N N

N

O

Q

R

Q

R R

P

O

N P

O

R P

P

R P

R

R P

P

P

Q Q

Q P

P P

R

Q

Q

R R

R

R R

Q P

R

R

Q

R

R R

R R

R R

R

R S

R

R R

3 R

S

R S

R R

S

R S

R R R

S

R S

S

S

S R

S

S S

S S

S

S

R S S

S

R

S

T S

S

S

T U S

2 R

S

U T

S

1

U

w

M

M N N P P

L L N N P P

W W W W W W W W W W W W W W W W W W W

X X X X X X X X X X X X X X X X X X X

Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y

Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z

WL WL WL WL

WL WL WL WL

V V V

V V V

S3-123 5

5 5 5

4 4 4 4

S2-45

PINLIGHT CASING SURFACE

MOUNTED, E-27 SOCKET W/ LED 18 WATTS

7X1 WATTS DOWN LIGHT LED

COVE LIGHT W/ LED STRIPLIGHT 7X1 WATTS

DOWN LIGHT LED

30" DECORATIVE CEILING PAN WITH 5 LIGHTS AND BLADES 7X1 WATTS

DOWN LIGHT LED

SUSPENDED ALUMINUM LED PROFILE WITH LED STRIPLIGHT

WALL LAMP WITH 12W LED BULB

PINLIGHT CASING SURFACE

MOUNTED, E-27 SOCKET W/ LED 18 WATTS

c c c c c

d d

d d

d

S3-567 S2-V1 S3-234 S3-TUZ S3-LNP S3-MOQ S3-EFf

S2-RS S2-JK S3-GHI

S1-WXY

CF-1 CF-4

CF-1

CF-1 CF-3 CF-1

CF-1

CF-1 CF-4 CF-4

CF-4 CF-4 CF-4 CF-4 CF-4

CF-1 CF-1 CF-1

30" DECORATIVE CEILING PAN WITH 5 LIGHTS AND 4 BLADES

COVE LIGHT 9X1 WATTS LED

W/ LED STRIPLIGHT

LOBBY

CF-1 CF-2

CF-2 CF-3

READING SECTION

7X1 WATTS LED

DOWN LIGHT 7X1 WATTS LED

DOWN LIGHT 7X1 WATTS LED

DOWN LIGHT

CF-1 CF-3 CF-1 CF-3 CF-1

COFFEE SHOP

SUSPENDED ALUMINUM

PINLIGHT CASING

PENDANT LIGHT PENDANT LIGHT

PENDANT LIGHT PENDANT LIGHT

SURFACE MOUNTED

LED PROFILE WITH LED STRIP LIGHT

E-27 SOCKET

W/ LED BULB E,

PINLIGHT CASING SURFACE MOUNTED E-27 SOCKET

27 SOCKET

W/ LED BULB E, 27 SOCKET

W/ LED BULB E, 27 SOCKET

W/ LED BULB E, 27 SOCKET PINLIGHT CASING SURFACE MOUNTED E-27 SOCKET

CF-4 CF-4 CF-4 CF-4

CEILING FINISH SCHEDULE PARTITION SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

COMPLETION OF THIRD FLOOR OF LIBRARY AT MAIN CAMPUS

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)

RCP PLAN BLOW-UP PLAN

BATAAN PENINSULA STATE UNIVERSTY TENEJERO BALANGA CITY

(14)

TOILET FACILITY

7X1 WATTS LED DOWN LIGHT

CF-1

HALLWAY

E-27 SOCKET

PINLIGHT CASING E-27 SOCKET

PINLIGHT CASING E-27 SOCKET

CF-4

COMPUTER SECTION

DOWN LIGHT DOWN LIGHT PENDANT LIGHT

CF-1 CF-3

CF-1

READING SECTION

TRACK LIGHT 5 HEAD

CF-1

READING SECTION

7X1 WATTS LED

DOWN LIGHT 7X1 WATTS LED

DOWN LIGHT 7X1 WATTS LED

DOWN LIGHT

CF-1 CF-3 CF-1 CF-3 CF-1

COFFEE SHOP

SUSPENDED ALUMINUM

PINLIGHT CASING

PENDANT LIGHT PENDANT LIGHT

PENDANT LIGHT PENDANT LIGHT

SURFACE MOUNTED

LED PROFILE WITH LED STRIP LIGHT

E-27 SOCKET

W/ LED BULB E,

PINLIGHT CASING SURFACE MOUNTED E-27 SOCKET

27 SOCKET

W/ LED BULB E, 27 SOCKET

W/ LED BULB E, 27 SOCKET

W/ LED BULB E, 27 SOCKET PINLIGHT CASING SURFACE MOUNTED E-27 SOCKET

CF-4 CF-4 CF-4 CF-4

30" DECORATIVE CEILING PAN WITH 5 LIGHTS AND 4 BLADES

COVE LIGHT 9X1 WATTS LED

W/ LED STRIPLIGHT

LOBBY

CF-1 CF-2

CF-2 CF-3

CEILING FINISH SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

(FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)

PERSPECTIVE SITE DEVELOPMENT PLAN VICINITY MAP

CEILING FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL) SYMBOLS AND LEGENDS (FOR ARCHITECT'S APPROVAL) SYMBOLS AND LEGENDS (FOR ARCHITECT'S APPROVAL)

WL

TRACKLIGHT 5 HEAD

7X1 WATTS DOWN LIGHT LED

PENDANT LIGHT W/LED BULB E,27 SOCKET

WALL LAMP WITH 12W LED BULB

TRACKLIGHT 5 HEAD

30" DECORATIVE CEILING PAN WITH 5 LIGHTS AND BLADES

PINLIGHT CASING E-27 SOCKETS

BATAAN PENINSULA STATE UNIVERSTY TENEJERO BALANGA CITY

(15)

DOWN

UP

A

B

A

B

A

B

C

D

C

D

C

D

E

F

E

F S3-aAB

S3-bCD

G G

G G

G G

G G

G G

G G

H H H H H H

H H H H H H

H H H

I I

I I

I I

I I

I I

I I

J J J

K K K

K M M

L L

M M

L L

M M

L L

M M

L L

M M

L L

M M

O O

N N

O O

N N

O O

N N

O O

N N

O O

N N

O O

N N

O O

Q Q

P P

Q Q

P P

Q Q

P P

Q Q

P P

Q Q

P P

Q Q

P P

Q Q

T

T

T U

U

U 2

3

4 1

M M

L L

4

5

13

8 7

9

18

34 14

19

15

20

16

21

L L N N P P

L L N N P P

17

R R R R

R R R R R

R R R R R

R R R R R

R R R R R

R R R R R

R R R R R

S S S S R

S S S S R

S S S S R

S S S S R

S S S S R

S S S S R

S S S S R

R 22

23

24

25

26

27

28 W W W W W W W W W W W W W W W W W W W W

29 30 31 32

X

f

f f f f f

f f f f f f f f f

f f f f f V

1 X

X X X X X X X X X X X X X X X X X X

Y Y

Y Y Y Y Y Y Y

Y Y

Y Y

Y Y Y Y Y Y Y

Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z J

F 6

35

V V V

V V V

WL WL WL WL WL WL

7 7 6

7 6 6

10

WL WL WL WL WL

6 7 6 7 6 7

WL

11

12

33

S3-TUZ S3-LNP S3-MOQ S3-EFf

S2-RS S2-JK S3-GHI

S1-WXY 5

S2-V1

PIPE CHASE a

a a a a a

a a

a

a

a

b

b

b

b

b

b

b b

b b c

c

c

d e

2

3

S3-cde

S3-234

d e d e d e d e d e d

g h g h g h g h g h g h g

S3-cde S3-bCD S3-567 S3-567 S3-bCD S2-gh

FLOOR FINISH SCHEDULE PARTITION SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

BATAAN PENINSULA STATE UNIVERSITY

COMPLETION OF THIRD FLOOR OF LIBRARY AT MAIN CAMPUS

TENEJERO BALANGA CITY

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)

LIGHTING LAYOUT

BLOW-UP LIGHTING LAYOUT

(16)

DOWN

UP

38 37

36

FO FO FO FO FO FO FO FO FO FO FO FO

FO FO FO

FO

FO FO

FO

FO FO

FO FO FO FO

FO

FO FO

FO

FO

FO

FO HD

HD

acu acu

39 41 40

42

46 45

43 44

PIPE CHASE

FLOOR FINISH SCHEDULE PARTITION SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

BATAAN PENINSULA STATE UNIVERSITY TENEJERO BALANGA CITY

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)

POWER LAYOUT

(17)

UP

co

WC LAV.

WC WC

WC WC

WC WC

LAV.

LAV.

LAV.

LAV.

WC

WC

WC

LAV.

LAV.

PIPE CHASE

LAV.

co co

co URINAL URINAL URINAL

URINAL

VENT THROUGH ROOF

UP

co

LAV.

WC WC

WC WC

FROM WATER LINE BELOW

WC LAV.

URINAL URINAL

LAV.

URINAL

LAV.

URINAL LAV.

WC LAV.

LAV.

WC WC

LAV.

WC

WC CO CO CO CO

125mm THK. CHB MANHOLE 12mm REINF. BAR

100mm Ø PVC PIPE

SPACE @ 250mm O.C. B.W

100mm Ø PVC PIPE

MANHOLE MANHOLE

SC-1

SC-1 SC-1

SC-1

CO CO

CO CO

125mm THK. CHB MANHOLE 12mm REINF. BAR

100mm Ø PVC PIPE

SPACE @ 250mm O.C. B.W

100mm Ø PVC PIPE

MANHOLE MANHOLE

SC-1

SC-1 SC-1

SC-1

GROUND LINE

OUTLET

75 MMØ OUTLET PIPE PRECAST CONC. COVER

DIGESTION CHAMBER LEACHING

TO CNM SEWER LINE

100 MMØ VERT. BARS @ 800mm O.C. AND 100mm Ø HOR.

BARS @ EVERY 3ND COURSE

SLOPE = 10% SLOPE = 10%

125 MM CHB.

w/ 10MMØ HOR./VERT.

BARS @ 400 O.C. B.W.

12MMØ @ 250 O.C. B.W.

12MMØ BARS SPACED

@ 200MM O.C. B.W.

LIQUID

CO

CO CO

CO

LEACHING CHAMBER CHAMBER CHAMBER LEACHING CHAMBER PRECAST CONC. COVER GROUND LINE

OUTLET

75 MMØ OUTLET PIPE PRECAST CONC. COVER

DIGESTION CHAMBER LEACHING

100 MMØ VERT. BARS @ 800mm O.C. AND 100mm Ø HOR.

BARS @ EVERY 3ND COURSE

SLOPE = 10% SLOPE = 10%

125 MM CHB.

w/ 10MMØ HOR./VERT.

BARS @ 400 O.C. B.W.

12MMØ @ 250 O.C. B.W.

@ 200MM O.C. B.W.

12MMØ BARS SPACED LIQUID

CO

CO CO

CO

PRECAST CONC. COVER

10 MM EXPANSION BOLT

5" CHB

3.5 MM ANGLE BAR

2"X2" TUBULAR BAR

FLOOR FINISH SCHEDULE PARTITION SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

BATAAN PENINSULA STATE UNIVERSITY

COMPLETION OF THIRD FLOOR OF LIBRARY AT MAIN CAMPUS

TENEJERO BALANGA CITY

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)

SEWER LINE LAYOUT WATER LINE LAYOUT SEPTIC TANK DETAIL PIPE CHASE DETAIL

(18)

DOWN

UP

48

BELL

BELL 47

#16 TWISTED WIRE (BLACK & RED OR WHITE & RED) TAP TO FACP (FIRE ALARM CONTROL PANEL) TAP TO FACP (FIRE ALARM CONTROL PANEL)

#16 TWISTED WIRE (BLACK & RED OR WHITE & RED)

PIPE CHASE

FLOOR FINISH SCHEDULE PARTITION SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

BATAAN PENINSULA STATE UNIVERSITY TENEJERO BALANGA CITY

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)

SMOKE DETECTOR LAYOUT

(19)

BUILDING LINE

ROOF LINE DOWNSPOUT

ROOF OF SLAB

FLOOR FINISH SCHEDULE PARTITION SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

BATAAN PENINSULA STATE UNIVERSITY

COMPLETION OF THIRD FLOOR OF LIBRARY AT MAIN CAMPUS

TENEJERO BALANGA CITY

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL) (FOR ARCHITECT'S APPROVAL)

ROOF FRAMING PLAN

(20)

25 26 27 28 29 30 31 32

35 36 37 38 39 40 41 42 43 10

13 5 4

6 7

9 3

11 1

12 2

8

14

17

19 18 16 15

20 21 22

33 34

44 45 46 23

24

47 48

27 28

1 2

3 4

6 5

7

10 8

9

12 11

14 13

15 16

17 18

19 20

25 26

29 30

31 32

33 34

35 36

38 37

39

42 40

41

44 43

P P

A B

MDP

21 22 45 46

23 24 47 48

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

BATAAN PENINSULA STATE UNIVERSTY TENEJERO BALANGA CITY

(21)

WINDOW TYPE - 1

LOCATION :

SPECIFICATION:

SETS REQUIRED:

4 SETS

TYPE:

LOCKSET:

LOCATION :

SPECIFICATION:

0.0000

WINDOW TYPE - 2

SETS REQUIRED:

8 SETS

TYPE:

LOCKSET:

WINDOW TYPE - 2

LOCATION :

SPECIFICATION:

SETS REQUIRED:

2 SETS

TYPE:

LOCKSET:

F F

F

WINDOW TYPE - 2

F

F

LOCATION :

SPECIFICATION:

SETS REQUIRED:

TYPE:

6 SETS

LOCKSET:

F

DOOR TYPE - D-1

LOCATION :

TYPE :

HINGES :

6 SET

SETS REQUIRED:

CASING:

LOCKSET/

HANDLE:

FRAMING / JAMB:

DOOR TYPE - D-2

LOCATION :

HINGES : CASING:

TYPE :

SETS REQUIRED:

2 SET

FRAMING / JAMB:

LOCKSET/

HANDLE:

DOOR TYPE - D-2

LOCATION :

HINGES : CASING:

TYPE :

SETS REQUIRED:

10 SETS

FRAMING / JAMB:

LOCKSET/

HANDLE:

300.0000

BATAAN PENINSULA STATE UNIVERSITY

BATAAN PENINSULA STATE UNIVERSTY

COMPLETION OF THIRD FLOOR OF LIBRARY AT MAIN CAMPUS

TENEJERO BALANGA CITY

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

ARCHITECT II, TWG CONSULTANT

AR. DANILO Y. GALURA

REVIEWED BY:

SHEET NUMBER:

SCHEDULE OF DOORS AND WINDOWS

Referensi

Dokumen terkait

I investigated in 2007 the course of the line on Shell 2D seismic data, and what I can say is that picking the line is far from obvious - the best description that comes to my mind is

Figure 1-1 Project location and existing operational railways 2 Figure 2-1 Different means of transportation in Metro Manila 6 a to c – from past to present Figure 2-2 Elevated