Name of the Procuring Entity : KALINGA STATE UNIVERSITY Project Reference Number : IB_CIVILWORKS_2019-02-020
Name of the Project : CONSTRUCTION AND/OR REHABILITATION OF MULTI-PURPOSE INCLUDING PHP500,000 FOR SPORTS FACILITIES- FINAL PHASE
Location of the Project : KSU MAIN CAMPUS, NAT’L HIGHWAY, PUROK 6, BULANAO CENTRO, TABUK CITY, KALINGA End-User Unit : HIGHER EDUCATION SERVICES C/O BULANAO CAMPUS ADMINISTRATOR
Implementing Unit : INFRASTRUCTURE OFFICE Standard Form Number : SF-INFR-34
“All BAC members shall be on a “jury duty” type of assignment until the Notice of Award is issued by the HOPE in order to complete the entire procurement process at the earliest possible time” (Section 38 of the IRR of RA 9184) Page 1 of 4
SUPPLEMENTAL / BID BULLETIN (SBB)
ADDENDUM NO. 01
PARTICULARS CLARIFICATION / AMENDMENT
On Item No. X-Scope of Works on the Terms of Reference under Section VI-Specifications, pages 69-71 of the bid document, the following in highlighted yellow color are the selective revisions/modifications (for clarity, other items of the scope of works are unchanged):
ITEM No. ITEMS OF WORK QTY UNIT SCOPE OF WORKS
800(1) CLEARING, GRUBBING AND 63.00 sq.m. -removal of bushes and a tree includes lay-out of the
LAY-OUT building
803(1) STRUCTURE EXCAVATION 4.88 cu.m. -excavation of ramp footing and base of the grouted riprap
804 EMBANKMENT (Selected Fill 29.96 cu.m. -backfilling and tamping of selected fill materials
Materials above Grade) @ Grid A TO B Front
@ Grid 1 TO 3 Right Side
@ Grid 3 TO 5 Right Side
1000 (1) TERMITE CONTROL 29.96 sq.m. -Soil poisoning around the perimeters of the building
(Soil Poisoning)
900 CONCRETE WORKS 7.89 cu.m. -all concrete shall be class A - fc' ≥ 21 MPa
-concreting of ramp footing and slab @ perimeter back,
right and front corridor
specs are as follows:
*portland cement
*washed sand (S1)
*gravel 1"
*marine plywood 1/2" thk.
*form lumbers
*lumber scaffolds
*common wire nails (assorted)
404 REINFORCING STEEL BARS 185.10 kgs. -all reinforcing bars shall be grade 40
specs are as follows:
GRADE 40 RSB
no. 16 GI Tie wire
1046(2) MASONRY WORKS (CHB walls) 5.46 sq.m. -covers item @ ramp and front step
specs are as follows:
4" thk. CHB
sand
cement
10mm dia RSB grade 40
no. 16 GI tie wire
505(2) GROUTED RIPRAP (Class A) 12.65 sq.m. -covers item @ Grid 2-3 & Grid 3-5'
specs are as follows:
GROUTED RIPRAP (Class A)
1018(7) GLAZED TILES 19.05 sq.m. -covers item @ CR wall, CR flooring, counter slab, counter wall,
specs are as follows:
a. 600mm x 600mm Glazed Tiles (preferably granite tile)
b. 300mm x 300mm Glazed Tiles
c. Portland Cement
Name of the Procuring Entity : KALINGA STATE UNIVERSITY Project Reference Number : IB_CIVILWORKS_2019-02-020
Name of the Project : CONSTRUCTION AND/OR REHABILITATION OF MULTI-PURPOSE INCLUDING PHP500,000 FOR SPORTS FACILITIES- FINAL PHASE
Location of the Project : KSU MAIN CAMPUS, NAT’L HIGHWAY, PUROK 6, BULANAO CENTRO, TABUK CITY, KALINGA End-User Unit : HIGHER EDUCATION SERVICES C/O BULANAO CAMPUS ADMINISTRATOR
Implementing Unit : INFRASTRUCTURE OFFICE Standard Form Number : SF-INFR-34
“All BAC members shall be on a “jury duty” type of assignment until the Notice of Award is issued by the HOPE in order to complete the entire procurement process at the earliest possible time” (Section 38 of the IRR of RA 9184) Page 2 of 4
ITEM No. ITEMS OF WORK QTY UNIT SCOPE OF WORKS
d. Washed Sand (S1)
e. Tile Grout Fix All and Tile Adhesive
f. Tile Cutter Disk
g. Tile trim
1018(2) UNGLAZED TILES 218.25 sq.m. -covers item @ stall 1, stall 2, multi-purpose area,
indoor sports, perimeter flooring and stairs
specs are as follows:
a. 600mm x 600mm Unglazed Tiles (preferably granite
tile)
b. 200mm x 200mm Tact Tiles
c. Portland Cement
d. Washed Sand (S1)
e. Tile Grout Fix All and Tile Adhesive
f. Tile Cutter Disk
1010(2)a FLUSH DOORS 2.52 sq.m -covers item @ specified in the plan
specs are as follows:
Flush Door (D-2) 2100mm x 600mm x 1-1/2" thck 2 set
Door Jamb (D-2) 2100mm x 600mm x 1-1/2" thck 2 set
400x400 Loose Pin Hinges, HD
Decorative handle high quality interior knob metal
cylindrical brass cylinder steel door stainless steel lock power
CW Nails assorted sizes
1011 ROLLING UP DOORS 19.91 sq.m -covers item @ specified in the plan
specs are as follows:
2 sets of ROLLING UP DOORS (3.70m x 2.69m) ga. 16
401 METAL RAILINGS 201.40 ln.m -covers item @ specified in the plan
specs are as follows:
Tubular 50mm x 50mm x 6mx1.5mm thk.
Tubular 50mm x 100mm x 6mx1.5mm thk.
50mm dia stainless steel high grade
63mm dia stainless steel high grade
Stainless Steel Welding rod
Welding rod
1032(1)a1 PAINTING (MASONRY/ 210.00 sq.m -covers item @ all cement plastered finish
CONCRETE) specs are as follows:
Flat white Latex (1st Coat)
Final Paint (2nd coat and 3rd coat-verify paint color)
Masonry Neutralizer
Masonry putty
Sand paper, #200
Roller brush with pan
Paint Brush x 100
Paint Brush x 75
Paint Brush x 50
Roller brush foam
1032(1)a2 PAINTING WOOD 2.52 sq.m. -covers painting of all wooden doors
specs are as follows:
Enamel Flat White
Enamel Choco Brown
Sand Paper # 200
Plasolux Glazing Putty
Paint Thinner
Paint Brush x 100
Paint Brush x 75
Paint Brush x 50
Name of the Procuring Entity : KALINGA STATE UNIVERSITY Project Reference Number : IB_CIVILWORKS_2019-02-020
Name of the Project : CONSTRUCTION AND/OR REHABILITATION OF MULTI-PURPOSE INCLUDING PHP500,000 FOR SPORTS FACILITIES- FINAL PHASE
Location of the Project : KSU MAIN CAMPUS, NAT’L HIGHWAY, PUROK 6, BULANAO CENTRO, TABUK CITY, KALINGA End-User Unit : HIGHER EDUCATION SERVICES C/O BULANAO CAMPUS ADMINISTRATOR
Implementing Unit : INFRASTRUCTURE OFFICE Standard Form Number : SF-INFR-34
“All BAC members shall be on a “jury duty” type of assignment until the Notice of Award is issued by the HOPE in order to complete the entire procurement process at the earliest possible time” (Section 38 of the IRR of RA 9184) Page 3 of 4
ITEM No. ITEMS OF WORK QTY UNIT SCOPE OF WORKS
1716(29)b PAINTING WORKS (STEEL 150.00 sq.m. -covers item @ metal railing and sunscreen
STRUCTURES) specs are as follows:
1. Metal primer
2. Paint brush x 25
3. Paint Thinner
4. QDE (gray, 2 coats)
1005(4) STEEL WIDOWS 2.20 sq.m. -covers item @ grid 1-3 A and as specified in the plan
specs are as follows:
W1 awning steel window (1.50m x 0.50m x 2mm thick)
with 6mm fixed glass thick x 2 sets
W2 awning steel window (0.70m x 0.50m x 2mm thick)
with 6mm fixed glass thick x 2 sets
*note all steel windows will be pre-painted (black)
1003(2) SPANDRELL CLADDING 63.15 sq.m. -covers item @ specified in the plan
specs are as follows:
Spandrel x 4" pre-painted, white
Blind rivet x 4mm diam
GI pipe 25mm diam. X 6m sch. 40
welding rod
*note verify type of cladding before installation
1002(28) COLD WATER LINES 45.00 ln.m -covers item @ specified in the plan
specs are as follows:
25mm GI pipe x 6m, schedule 40
12mm GI Pipe x 6m, schedule 40
Gate valve
25mm Elbow GI Pipe, schedule 40
12mm Elbow GI Pipe, schedule 40
12mm Tee GI Pipe
25mm x 12mm Tee reducer GI Pipe
25mm Plain coupling GI Pipe
12mm Plain coupling GI Pipe
solvent cement 250cc
1" teflon tape
1002(8) PLUMBING FIXTURES 1.00 Ls -covers item @ specified in the plan
specs are as follows:
Elegant Water closet, flash type, white w/tissue holder &
soap holder
Lavatory w/ complete accessories, white
Stainless Sink Single bowl
Floor drain 100x100mm, HD
*Water Line Fixtures
Brass faucets
gate valve 25mmФ
teflon tape
Cement Solvent 1/4 Liter
1001(9) STORM DRAINAGE/ 1.00 Ls -covers item @ specified in the plan
DOWNSPOUTS specs are as follows:
*downspout
Orange PVC pipe sch.40x3"Ф
Gutter Strainer 3"Ф, PVC
Elbow 3"Ф
*catch basin
Orange PVC pipe sch.40x4"Ф
1001(6)b CATCH BASIN 10.00 each -covers item @ specified in the plan
SPL-I CONSTRUCTION OF SEPTIC 1.00 unit -covers item @ specified in the plan
TANK specs are as follows:
Name of the Procuring Entity : KALINGA STATE UNIVERSITY Project Reference Number : IB_CIVILWORKS_2019-02-020
Name of the Project : CONSTRUCTION AND/OR REHABILITATION OF MULTI-PURPOSE INCLUDING PHP500,000 FOR SPORTS FACILITIES- FINAL PHASE
Location of the Project : KSU MAIN CAMPUS, NAT’L HIGHWAY, PUROK 6, BULANAO CENTRO, TABUK CITY, KALINGA End-User Unit : HIGHER EDUCATION SERVICES C/O BULANAO CAMPUS ADMINISTRATOR
Implementing Unit : INFRASTRUCTURE OFFICE Standard Form Number : SF-INFR-34
“All BAC members shall be on a “jury duty” type of assignment until the Notice of Award is issued by the HOPE in order to complete the entire procurement process at the earliest possible time” (Section 38 of the IRR of RA 9184) Page 4 of 4
ITEM No. ITEMS OF WORK QTY UNIT SCOPE OF WORKS
*Concreting Works
1. Portland Cement
2. Sand (S -1)
3. Gravel (1")
4. RSB 10 mmØ x 6.0 grade 40
5. GI Tie wire # 16
6. Water Proofing Compound
*Masonry Rough Works
1. Portland Cement
2. Sand
3. RSB 10 mmØ x 6.0 grade 40
4. CHB 6" THK
5. GI Tiewire #16
*Masonry Finishing Works
1. Portland Cement
2. Sand (s-1)
*Plumbing Rough Works
1. Moldex PVC Pipe S-1000 x 100mm dia. X 3m
2. Sanitary Tee 87.50 deg. X 100mm dia.
3. Clean Out 100mm dia.
4. Solvent Cement 1/4 lit
SPL-II SUNSCREEN 45.86 sq.m. covers item @ specified in the plan
specs are as follows:
Tubular 50mm x 50mm x 6mx1.0mm thk.
Tubular 25mm x 25mm x 6mx1.0mm thk.
Welding rod
360 Degree Door Pivot hinge (hardware silver, 74mm
length)
1103(5)b3 LIGHTING 18.00 sets covers item @ specified in the plan
specs are as follows:
Low Bay LED lighting 32W with pendant hangers
classical LED wall lamp 18 watts
2.0mm sq THHN wire
Assorted wiring devices (switches, convenience outlet),
wide series
B.1 PROVISION FOR SAFETY & 1.00 lot specs are as follows:
HEALTH safety gloves
safety shoes
safety helmets
SPL - V PROJECT BILLBOARD 1.00 piece specs are as follows:
1/4" x 4' x 8' marine plywood
good lumber
tarpaulin (4' x 8')
CWN (assorted)