NAME/LOCATION OF PROJECTS: Total Calendar Days 45 CD REPAIR AND REPLACEMENT OF ROOFING AT ADMINISTRATION BUILDING Desirable Starting Date

LEYTE NORMAL UNIVERSITY, TACLOBAN CITY PROJECT CATEGORY:

PROJECT DESCRIPTION:

ITEM NO. DESCRIPTION QTY. UNIT Unit Cost

per Days UNIT COST TOTAL COST

I ROOFING WORKS 499.5 sq.m.

A. Material

Prepainted Corrugated Metal Sheets ( Long Span,0.4mm thk) 499.5 sq.m. -

J-bolt with washers 2497.5 pcs -

Miscellaneous works (Repair and patching leaking roofing sheets, repair

and repainting of ceiling, repair of downspout, etc) 1 lot -

Total Material Cost -

B. LABOR

Foreman 1 m-day 30.00 -

Skilled Workers 2 m-day 30.00 -

Labor 2 m-day 30.00 -

Total Labor Cost -

Direct Cost (Labor and Materials) -

Indirect Cost

VAT (5%) -

Contructor's Profit (10%) -

Overhead, Contingencies & Misc. (3%) -

Total Indirect Cost -

TOTAL ROOFING WORKS COST -

TOTAL PROJECT COST

ENGINEERING UNIT

STRUCTURE REPAIR ROOFING WORKS

Republic of the Philippines LEYTE NORMAL UNIVERSITY

Tacloban City

Referensi

Dokumen terkait

Chapter 6 Validation of chemical-kinetic models against CH 4 -, C 2 H 6 -, and C 2 H 4 -air stagnation-flame experiments and comparative sensitivity analysis 6.1 Validation of C1–C3

PREPARED BY PROJECT TITLE DESIGNED FOR: LOCATION: TACLOBAN CITY, LEYTE SHEET CONTENTS: SHEET NO./ TIN No.: REG DATE: ISSUED: REG No.: PTR No.: REG VALID: IAPOA No.: