IT MANAGEMENT Max.

Points Lead Support ICT Policy, Planning & Operations ManagementDevelopment of Plans

PCIEERD 3-Year Information Systems Strategic Plan (ISSP)

New 230 160 70

Revised 120 85 35

Approved Funding by DBM 40

Data Back-Up and Recovery Plan

New 20

Revised 15

Preventive Maintenance Plan 10

ICT Resource Requirements Preparation, Review and Evaluation

__(Simple) 2

__(Moderate) 8

__(Complex) 25

Policy & Work

Instructions/Procedures/Business Process

New 40

Updated 30

Performance Evaluation/Hiring 10 Communications/Reports/Other Documents Prepared

Simple - (with template such as TO, AO, SO, Letters, Memo, Training Report, pre/post repair inspection report, etc)

0.5 Philippine Council for Industry, Energy and Emerging Technology

Research and Development (PCIEERD)

INDIVIDUAL PERFORMANCE COMMITMENT AND REVIEW (IPCR) FORM I, ARLENE A. ROMASANTA, of the PCMD-ITMU, commit to deliver and

agree to be rated on the attainment of the following targets in accordance with the

indicated measures for the period of Jan. to Dec. 2014.

Unit Core Functions KPIs/Outputs Equivalent

Points

(2)

(1) (2)

IT MANAGEMENT Max.

Points Lead Support

Unit Core Functions KPIs/Outputs Equivalent

Points

Moderate - (Internal Survey, Inputs to Annual Reports, Minutes of Meeting, request to advertise)

8 Complex Major Reports/Plans (External

Survey, SPMS, Action Plans, Annual IT Priorities/Plan, ISP Subscription Plan, Anti- Virus Subscription Plan, OJT evaluation, etc.)

40

Project Development (Full-Blown Program/Proposals Developed) Proposals packaged for external funding

(local or foreign funding) 60 40 20

Approved/Endorsed by PMT/ED 50 35 15

Approved by funding agency 40

Proposals/Program conceptualized 30 Forms Preparation/Supporting docs. (BP202, BP206 and BP206A, Gantt Chart,

Architectural Design)

10 6 4 per form

Project Implementation

Workplan Prepared/Work Assignments 15

Scope of Work/TOR 40

Project Progress Reports/Presentation Materials 25

System Requirements Identified 30 20 10 per IS

System Design 100

Development of New Feature/Functions

__simple 4

__Moderate 8

__Complex 20

Image created 4 per image

IT Project Development, Management and Evaluation

(3)

(1) (2)

IT MANAGEMENT Max.

Points Lead Support

Unit Core Functions KPIs/Outputs Equivalent

Points

New Database Developed 32

Documentation Produced/Edited 50 PROJECT DATA MANAGEMENT

Reports/Information Generated (internal) 10 6 4 Reports/Information Generated (external) 15 10 5 Consolidated report (division level) 12

System Deployment

System/Project Launched/Announced 20

System Installed/Rolled-out/Deployed 40 Per System Roll-out

System Pilot-tested 16

ISs' Reports/Presentations Generated 16

Training Conducted 8

System Maintenance

Information Systems Backed-up 5 Existing Functions Debugged/Enhanced

__(simple) 2

__(Moderate) 6

__(Complex) 15

Database Tables Developed/Modified 1 per table

Systems Monitored 2 Per system

Data Entry 0.05 Per Entry

Number of Items Uploaded/Posted to website 1

(4)

(1) (2)

IT MANAGEMENT Max.

Points Lead Support

Unit Core Functions KPIs/Outputs Equivalent

Points

PROJECT RENEWAL

Annual Appraisal Report 25 20 5

PROJECT CLOSURE

Oral Presentation 25 15 10

Terminal Report 25 20 5

Suggested John

Network layout/plan/requirements proposed

__New 30

__Updated 20

Network systems installation and configuration

__New 8 per day

__Update 4

Network systems administered/maintained 2 per system

Server state back up and recovery 2 per server

Network cables tracing/installation 4 per day

Preventive maintenance for computers and laptops conducted; Software and hardware inventory of computers and laptops

4 Report on bandwidth utilization and

downtime occurrence rating 16

IT SERVICE MANAGEMENT

Network/Internet/Printer connection problem

repaired 0.5

PC problem repaired

__(Simple) 1

__(Moderate) 5

__(Complex) 10

Software installed/uninstalled and

configured; Updates (Operating System, Anti- virus, Browser, and other software) installed

NETWORK AND SYSTEMS ADMINISTRATION AND MANAGEMENT Network Systems Analysis, Design and Requirements Formulation

Network/Systems/Server Installation, Configuration, Deployment, Administration, Maintenance and Security

Provision of Technical Support to End Users, Preventive Maintenance (PM) and Inventory of ICT Equipment

(5)

(1) (2)

IT MANAGEMENT Max.

Points Lead Support

Unit Core Functions KPIs/Outputs Equivalent

Points

__(Simple) 0.3

__(Moderate) 5

__(Complex) 10

PC/Laptop/USB Flash Drive/External HDD

scanned for viruses 2

User accounts (Web/Systems, Domain,

Group mail) created/modified 0.25 per account

Configuration, Installation, Testing, and

Deployment of ICT equipment and Software 15 per deployment Incoming/outgoing IT documents recorded in

DTS 0.05

Provision of technical support outside

PCIEERD vicinity 8 per day

OTHER TASKS

Capability BuildingTrainings/Workshops/Seminars Echoed/Attended15 Consultancy PROPOSALS EVALUATION including R&D,

SETUP, Consortia, etc.

Technical Staff/Division Level

Technical evaluation review check the alignment to priority programs, no duplication, soundness

of proposal 30 20 10

Referred to other agencies 5 5

PROJECT MONITORED

Project Monitoring/Monitoring Report 25 15 10 COMMITTEE INVOLVEMENT (per semester)

Proof of accomplishment reports, attendance sheets etc should be submitted) /

PCIEERD Regular (active) Committees (SB, Staff Dev, SPMS, PRAISE, BAC, Emergency RT, IQA,

Grievance)/ minimum of 2 mtgs 40 40 30

External committee (non project related)

meetings attended with proof 10

Committee meetings with additional assignments (paper, presentation, workshop facilitation) 30

Foreign Committees 20

Technical assistance/ advisory/ comments on other activities/projects (BSP, scholarship,

training, CHED, NRCP, etc.) 15

Attendance to meetings /workshops/ fora with

active participation/role 20

SPECIAL ASSIGNMENTS

(6)

(1) (2)

IT MANAGEMENT Max.

Points Lead Support

Unit Core Functions KPIs/Outputs Equivalent

Points

PCIEERD-organized activities (e.g. Contests, Fora,

Seminars with external participants) 50 50 40

Preparation of technical papers/brief/speeches,

write-ups/articles 10 10 5

Resource Person (Speaker, Presenter, Judge, etc) 30 30 Network and linkages partnership (i.e regional

consortia with minutes of mtg) 15 8 7

Total

(7)
(8)
(9)

Per System Roll-out

Per system

(10)

per system

(11)

per account per deployment

(12)

Referensi

Dokumen terkait

Terminal Report UNIVERSITY OF THE PHILIPPINES LOS BAÑOS Office of the Vice-Chancellor for Research and Extension 3F UPLB Main Library Building, UPLB, College, Laguna 4031 Telefax Nos:

2.2 Talent Management Process As an organization strives to meet its business goals, it must make sure that it has a continuous and integrated process for recruit- ing, training,