1
EXISTING COLUMN & WALL
100mm THK SLAB ON FILL W/ 10mm Ø SPACED AT 400mm O.C. BOTHWAYS
1
B
C
D
TB/ RB 400 300
8-16mm 8-16mM
SCHEDULE OF BEAMS
DESIGNATION
DEPTH (MM) (D)
WIDTH (MM) (W)
NUMBER OF REBARS
@ SPRT @ MDSP
STIRRUPS
10mm def. bar
1@50mm; 5@100mm;
& REST @ 250MM O.C.
Gr 60 Gr 60
GR 40
SCHEDULE OF COLUMNS
DESIGNATION
DEPTH (MM) (D)
WIDTH (MM) (W)
NUMBER OF REBARS
LONGITUDINAL STIRRUPS
C1 400 400
1@50mm; 10@100mm;
& REST @ 225MM O.C.
10mm def. bar
8-20mm GR 60
GR 40
W10 x 22
1
EXISTING COLUMN & WALL
100mm THK SUSPENDED SLAB W/ 10mm Ø SPACED AT 400mm O.C. BOTHWAYS
1
B
C
D
W10 X 22 4" Ø G.I. PIPE
C-CHANNEL 150 x 50 x 1/4"
C-CHANNEL 150 x 50 x 1/4"
C-CHANNEL 150 x 50 x 1/4"
1 1
B
C
D
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
DINALUPIHAN CAMPUS
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. ROXETTE S. UMEREZ
PREPARED BY:
REVIEWED BY:
PROJECT TITLE:
DIRECTOR OF PPES
ENGR. ALFREDO D. VALENTOS
NOTED BY:
SHEET NUMBER:
BATAAN PENINSULA STATE UNIVERSITY,
REPAIR & REHABILITATION OF ACADEMIC BLDG. II AT DINA-
LUPIHAN CAMPUS
CAMPUS DIRECTOR
MR. BILLY ALIPIO
1
S-DC-04 BLOW-UP PLANS
FOOTING DETAIL STEEL BEAM DETAIL SCHEDULE OF COLUMN SCHEDULE OF BEAMS