• Tidak ada hasil yang ditemukan

W10 x 22

N/A
N/A
Protected

Academic year: 2023

Membagikan "W10 x 22"

Copied!
1
0
0

Teks penuh

(1)

1

EXISTING COLUMN & WALL

100mm THK SLAB ON FILL W/ 10mm Ø SPACED AT 400mm O.C. BOTHWAYS

1

B

C

D

TB/ RB 400 300

8-16mm 8-16mM

SCHEDULE OF BEAMS

DESIGNATION

DEPTH (MM) (D)

WIDTH (MM) (W)

NUMBER OF REBARS

@ SPRT @ MDSP

STIRRUPS

10mm def. bar

1@50mm; 5@100mm;

& REST @ 250MM O.C.

Gr 60 Gr 60

GR 40

SCHEDULE OF COLUMNS

DESIGNATION

DEPTH (MM) (D)

WIDTH (MM) (W)

NUMBER OF REBARS

LONGITUDINAL STIRRUPS

C1 400 400

1@50mm; 10@100mm;

& REST @ 225MM O.C.

10mm def. bar

8-20mm GR 60

GR 40

W10 x 22

1

EXISTING COLUMN & WALL

100mm THK SUSPENDED SLAB W/ 10mm Ø SPACED AT 400mm O.C. BOTHWAYS

1

B

C

D

W10 X 22 4" Ø G.I. PIPE

C-CHANNEL 150 x 50 x 1/4"

C-CHANNEL 150 x 50 x 1/4"

C-CHANNEL 150 x 50 x 1/4"

1 1

B

C

D

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

DINALUPIHAN CAMPUS

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. ROXETTE S. UMEREZ

PREPARED BY:

REVIEWED BY:

PROJECT TITLE:

DIRECTOR OF PPES

ENGR. ALFREDO D. VALENTOS

NOTED BY:

SHEET NUMBER:

BATAAN PENINSULA STATE UNIVERSITY,

REPAIR & REHABILITATION OF ACADEMIC BLDG. II AT DINA-

LUPIHAN CAMPUS

CAMPUS DIRECTOR

MR. BILLY ALIPIO

1

S-DC-04 BLOW-UP PLANS

FOOTING DETAIL STEEL BEAM DETAIL SCHEDULE OF COLUMN SCHEDULE OF BEAMS

Referensi

Dokumen terkait

OBJECTIVES: The Bataan Peninsula State University Main Campus intend to engage the services of a licensed termite exterminator and general pest control contractor for the entire BPSU

,.' BATAAN PENINSULA STATE UNIVERSITY City of Balanga 2100 Bataan PHILIPPINES CHECK DISBURSEMENT RECORD Sheet: Bank Name: Land Bank of the Phils; Account