• Tidak ada hasil yang ditemukan

WALTER G. VALDEZ AR. ROXETTE S. UMEREZ

N/A
N/A
Protected

Academic year: 2023

Membagikan "WALTER G. VALDEZ AR. ROXETTE S. UMEREZ"

Copied!
3
0
0

Teks penuh

(1)

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

ABUCAY, BATAAN

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

WALTER G. VALDEZ AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

PROJECT TITLE:

PPES DIRECTOR

ENGR. ALFREDO D. VALENTOS

REVIEWED BY:

SHEET NUMBER:

BATAAN PENINSULA STATE UNIVERSITY (ABUCAY CAMPUS)

..\..\..\Documents\0.png

A-AC-00

PERSPECTIVE

CONSTRUCTION PERIMETER FENCE (FROM DORMITORY

TO SETTLEMENT) AT

ABUCAY CAMPUS

(2)

RAMP UP

UP

S I D E W A L K S I D E W A L K

RAMP UPRAMP UP

GUTTER

GUTTER GUTTER

GUTTER GUTTER

GUTTER

GUTTER GUTTER

GUTTER GUTTER

GUTTER

GUTTER GUTTER

GUTTER

RAMP UP

COVERED

LADIES DORM DORM ADMIN. BLDG.

LADIES DORM

GUARD HOUSE

BOYS DORM

AMPHITHEATER

ENTRY GATE

SUPPLIES & MOTOR POOL

HOUSEHOUSEHOUSE CATTLE FARM

POULTRY

GREEN HOUSE

HOUSE

CLIFF

EXISTING BARBED WIRE FENCE

DORM

ACAD BUILDING CREEK

SPRING

LITTLE RICE TERRACES

ENTRY GATE

CT

OLD ENG2ND FLR BALCONY

OLD ENG

ROOF DECK

ROOF DECK

SECOND FLOORBALCONYSECOND FLOORBALCONY ROOF DECKBTVTE BSA

BTVTE BSA

COURT

DN

DN DN

UP

RAMP UP

RAMP UP

RAMP UP

S I D E W A L K

PROPOSED FUTURE PARKING SLOT PROPOSED ROAD

S I D E W A L K

S I D E W A L K

ROOF DECK ELEV.: + 10.40m PROPOSED TOWER

dn345678910111213141516 21

1718

LOCATION VIEWING DECK

ELEV.: +7.00m ELEV.: +7.00m

( LIBRARY BUILDING PHASE 1 )

RAMP UP

RAMP UP

H A L L W A Y H A L L W A Y

S I D E W A L K S I D E W A L K

RAMP UP

PATHWALK

R O A D

R O A D

R O A D

R O A D

R O A D

LADIES DORM

BUILDING BSA

BUILDING

BTVTE BUILDING

GUARD HOUSE

CLIFF

R O A D

R O A D

R O A D R O A D R O A D

R O A D

R O A D

R O A D

R O A D

R O A D

END OF FENCE

LADIES DORMITORY

(FUTURE DEVELOPMENT)DORMITORIES

(FUTURE DEVELOPMENT)

RESIDENTIAL ZONE

TEACHER'S VILLAGE FACULTY STAFF HOUSING

BALCONY

DECK DECK

BALCONY

DECK DECK

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

ABUCAY, BATAAN

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

WALTER G. VALDEZ AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

PROJECT TITLE:

PPES DIRECTOR

ENGR. ALFREDO D. VALENTOS

REVIEWED BY:

SHEET NUMBER:

BATAAN PENINSULA STATE UNIVERSITY (ABUCAY CAMPUS)

..\..\..\Documents\0.png

A-AC-01

VICINITY MAP LEGEND:

FENCE

TOTAL LENGTH: 750 m.

CONSTRUCTION PERIMETER FENCE (FROM DORMITORY

TO SETTLEMENT) AT

ABUCAY CAMPUS

(3)

4-12mmØ MRB

3" dia. B.I. Pipe SCHED. 20

10mmØ ADDITIONAL BAR WELDED TO TIES

LOCATION: AS SHOWN

4-12mmØ REBARS BOTHWAYS GRADE 40

10mmØ TIES: 1@ 50mm, REST @ 100mm

10mmØ ADDITIONAL BAR WELDED TO TIES

3" dia.

B.I. Pipe

4-12mmØ REBARS GRADE 40

NGL

WALL FOOTING

300mm WIDTH & 100mm THICK REINFORCEMENTS:

3-10mm LONGITUDINAL BARS 10mm TIES @ 300mm O.C.

2-LAYER 6" CHB REINFORCEMENT:

10mm HORIZONTAL BARS @ TOP 10mm VERTICAL BARS @ 600mm

3" dia. O.C.

B.I. Pipe PEDESTAL

6mm dia 4" x 4" x 6 ft. WIRE MESH

road line 20mm FLAT BAR BARB WIRE

4-12mmØ MRB

3" dia. B.I. Pipe

10mmØ ADDITIONAL BAR WELDED TO TIES LOCATION: AS SHOWN

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

ABUCAY, BATAAN

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

WALTER G. VALDEZ AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

PROJECT TITLE:

PPES DIRECTOR

ENGR. ALFREDO D. VALENTOS

REVIEWED BY:

SHEET NUMBER:

BATAAN PENINSULA STATE UNIVERSITY (ABUCAY CAMPUS)

..\..\..\Documents\0.png

S-AC-01

· ELEVATION

· COLUMN FOOTING DETAIL

· COLUMN DETAIL

CONSTRUCTION PERIMETER FENCE (FROM DORMITORY

TO SETTLEMENT) AT

ABUCAY CAMPUS

Referensi

Dokumen terkait

COMPUTER SECTION HALLWAY HALLWAY EXISTING EXISTING EXISTING 1 2 3 4 5 ROOF BEAM LINE FINISH GRADE LINE SECOND FLOOR LINE THIRD FLOOR LINE CEILING LINE LINE OF APEX EXISTING SLOPE

GALURA REVIEWED BY: SHEET NUMBER: F:\logo-bpsu.png FLOOR FINISH SCHEDULE WALL FINISH SCHEDULE PARTITION SCHEDULE FF1 FF2 FF3 6mmx600mm CERAMIC VITRIFIED TILES POLISHED CONCRETE