BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
ABUCAY, BATAAN
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
WALTER G. VALDEZ AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
PROJECT TITLE:
PPES DIRECTOR
ENGR. ALFREDO D. VALENTOS
REVIEWED BY:
SHEET NUMBER:
BATAAN PENINSULA STATE UNIVERSITY (ABUCAY CAMPUS)
..\..\..\Documents\0.png
A-AC-00
PERSPECTIVE
CONSTRUCTION PERIMETER FENCE (FROM DORMITORY
TO SETTLEMENT) AT
ABUCAY CAMPUS
RAMP UP
UP
S I D E W A L K S I D E W A L K
RAMP UPRAMP UP
GUTTER
GUTTER GUTTER
GUTTER GUTTER
GUTTER
GUTTER GUTTER
GUTTER GUTTER
GUTTER
GUTTER GUTTER
GUTTER
RAMP UP
COVERED
LADIES DORM DORM ADMIN. BLDG.
LADIES DORM
GUARD HOUSE
BOYS DORM
AMPHITHEATER
ENTRY GATE
SUPPLIES & MOTOR POOL
HOUSEHOUSEHOUSE CATTLE FARM
POULTRY
GREEN HOUSE
HOUSE
CLIFF
EXISTING BARBED WIRE FENCE
DORM
ACAD BUILDING CREEK
SPRING
LITTLE RICE TERRACES
ENTRY GATE
CT
OLD ENG2ND FLR BALCONY
OLD ENG
ROOF DECK
ROOF DECK
SECOND FLOORBALCONYSECOND FLOORBALCONY ROOF DECKBTVTE BSA
BTVTE BSA
COURT
DN
DN DN
UP
RAMP UP
RAMP UP
RAMP UP
S I D E W A L K
PROPOSED FUTURE PARKING SLOT PROPOSED ROAD
S I D E W A L K
S I D E W A L K
ROOF DECK ELEV.: + 10.40m PROPOSED TOWER
dn345678910111213141516 21
1718
LOCATION VIEWING DECK
ELEV.: +7.00m ELEV.: +7.00m
( LIBRARY BUILDING PHASE 1 )
RAMP UP
RAMP UP
H A L L W A Y H A L L W A Y
S I D E W A L K S I D E W A L K
RAMP UP
PATHWALK
R O A D
R O A D
R O A D
R O A D
R O A D
LADIES DORM
BUILDING BSA
BUILDING
BTVTE BUILDING
GUARD HOUSE
CLIFF
R O A D
R O A D
R O A D R O A D R O A D
R O A D
R O A D
R O A D
R O A D
R O A D
END OF FENCE
LADIES DORMITORY
(FUTURE DEVELOPMENT)DORMITORIES
(FUTURE DEVELOPMENT)
RESIDENTIAL ZONE
TEACHER'S VILLAGE FACULTY STAFF HOUSING
BALCONY
DECK DECK
BALCONY
DECK DECK
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
ABUCAY, BATAAN
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
WALTER G. VALDEZ AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
PROJECT TITLE:
PPES DIRECTOR
ENGR. ALFREDO D. VALENTOS
REVIEWED BY:
SHEET NUMBER:
BATAAN PENINSULA STATE UNIVERSITY (ABUCAY CAMPUS)
..\..\..\Documents\0.png
A-AC-01
VICINITY MAP LEGEND:
FENCE
TOTAL LENGTH: 750 m.
CONSTRUCTION PERIMETER FENCE (FROM DORMITORY
TO SETTLEMENT) AT
ABUCAY CAMPUS
4-12mmØ MRB
3" dia. B.I. Pipe SCHED. 20
10mmØ ADDITIONAL BAR WELDED TO TIES
LOCATION: AS SHOWN
4-12mmØ REBARS BOTHWAYS GRADE 40
10mmØ TIES: 1@ 50mm, REST @ 100mm
10mmØ ADDITIONAL BAR WELDED TO TIES
3" dia.
B.I. Pipe
4-12mmØ REBARS GRADE 40
NGL
WALL FOOTING
300mm WIDTH & 100mm THICK REINFORCEMENTS:
3-10mm LONGITUDINAL BARS 10mm TIES @ 300mm O.C.
2-LAYER 6" CHB REINFORCEMENT:
10mm HORIZONTAL BARS @ TOP 10mm VERTICAL BARS @ 600mm
3" dia. O.C.
B.I. Pipe PEDESTAL
6mm dia 4" x 4" x 6 ft. WIRE MESH
road line 20mm FLAT BAR BARB WIRE
4-12mmØ MRB
3" dia. B.I. Pipe
10mmØ ADDITIONAL BAR WELDED TO TIES LOCATION: AS SHOWN
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
ABUCAY, BATAAN
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
WALTER G. VALDEZ AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
PROJECT TITLE:
PPES DIRECTOR
ENGR. ALFREDO D. VALENTOS
REVIEWED BY:
SHEET NUMBER:
BATAAN PENINSULA STATE UNIVERSITY (ABUCAY CAMPUS)