DACUM Panel
Idris Mohamed Al-Drais Ministry of Justice Adel Mohamed Al-Suwaid Water and SanitaryAuthority
Faisal Ahmed Al-Zahrani Ministry of Islamic Affairs Mohamed Mizyad Bin Sharaim Riyadh secretariat – Utaiqa Municipality
Mohamed Raashid Al-Jaman Secretariat of Riyadh Mansour Mohamed Al-Yahya Al-Yahya Block and Tiles Factory
Nasir Abdurahman Al-Sarami Ministry of Education
Mizhar Faiz Al-Shihri Saudi Electric Co.
Waleed Ahmed Al-Zahrani Water and Sanitary Authority
DACUM Facilitators
Dr. Tariq Al-Thuweini Eng. Salih Al-Dhalaan Mr. Mohamed Al-Zahrani Mr. Abdurahman Al-Amr
Developed by:
Technical and Vocational Training Corporation (TVTC)
Curriculum Department Produced for:
Architectural Supervisor
Date 1 - 1423 H Head of Department/Project Engineer
Director General
Director General of Administration Organizational Structure
Architectural Supervisor
Laborers/Technician
140
אאא
אא
אא
אאאא
A Apply Safety Procedure
A1) A2) A3) A4) A5) Ensure the
availability of safety equipment
Ensure that proper work clothes are worn
Put up notice boards in the site
Ensure the availability of
emergency plans
Ensure the availability of
First Aid box
B
Prepare Reports about the Progress of the
Work
B1) B2) B3) B4) B5) Prepare reports
about the work of the technicians
Prepare a report about the material
and the machines used
Prepare a report about carpentry
work
Prepare a report about raw material for the
work
Prepare a report about the waste
in the site
C Participate in Receiving the Site
C1) C2) C3) C4) C5)
Ensure that the site has no waste
Participate in checking the conformity drawings to the
site
Participate in preparing the receiving report
of the site
Check the conformity of the site to the
officials documents
Compare the drawings with other officials documents
D Receive the Documents of the
Projects
D1) D2) D3) D4) D5) Receive the cost
for beginning the work
Receive the handing over report of the site
Receive the tables for quantities, standards and
drawings
Ensure the availability of
permissions related to the
site
Receive the list of laborers and technicians
needed for executing the
project
Prepare a Timetable for
Follow-up of Implementing the
Works
E1) E2) E3) E4) E5)
E
Prepare a timetable for
electric installations
Prepare a timetable for
sanitary installations
Prepare a timetable for installing doors
Prepare a timetable for
wall facing
Prepare a timetable for painting work
Participate in Receiving the Constructional Framework of the
Buildings
F1) F2) F3) F4) F5)
F
Receive excavations and
fillings
Receive the budget of the framework stage
of the project
Receive carpentry of the
foundation
Receive reinforcement
work of the foundation
Receive carpentry work of the columns and their heads
G Receive Finishing Work
G1) G2) G3) G4) G5) Test the
pressure of the internal water
lines
Receive wall
facing work Receive tile work Receive marble work
Receive ceramic work
H Implement Administrative
Decisions
H1) H2) H3) H4) H5) Attend regular
meetings
Implement fines on laborers and
technicians
Observe clocking in and clocking
out times
Abide by the directions of the project engineer
Distribute administrative decisions to the
workers of the project
Duties Tasks
141
אאא
אא
אא
אאאא
A6) A7) Ensure the
proper storage of materials
Ensure the soundness of the materials
used
C6) Surround the
site with fence suitable for its dimensions
E6) E7) Prepare a
timetable for tiling work
Prepare a timetable for false ceilings
F6) F7) F8) F9) F10) F11) F12)
Participate in receiving work on the reinforcement of the columns and the heads
Participate in receiving the carpentry work of the
ceiling
Participate in the reinforcement
of the ceiling
Participate in receiving the casting of the
concrete
Participate in receiving the work on the lintels of the doors and
windows
Participate in receiving the work of the
building
Participate in receiving the
work on sanitary and
electrical supplies
142
אאא
אא
אא
אאאא
I
Follow up Maintenance
and Repair Work
I1) I2) I3) I4) I5)
Determine defective places
Determine amount of work
Determine the number of laborers and
technicians needed for the
work
Determine the cost of the work
Approves of the samples needed for the repair
J
Ensure the Soundness and
Availability of essential Equipment and
Machines
J1) J2) J3) J4)
Ensure the availability of
hand tools
Ensure the availability of
electrical equipment
Ensure the availability of
mechanical equipment
Ensure the availability of equipment for
moving
K
Determine the Quantity of Accomplished
Work
K1) K2) K3) K4) K5) Determine the
construction work
Determine the wall facing work
Determine the tiling work
Determine masonry work
Determine ceramic and marble work
L
Supervise Laborers and
Technicians
L1) L2) L3) L4) L5) Prepare records
for following up workers
Assess workers' performances
Distribute workers according to their vocations
Distribute workers according
to needed work
Determine the number of laborers and technicians of
the project
M
Supervise the Application of Standards and Measurements
on Implementing
the Work
M1) M2) M3) M4) M5)
Check that the acquired material conforms to the
samples
Test the quality of the insulation
Test the installations of the electric and sanitary material
Apply the standards on construction work
Apply standards on painting
work
N
Study the drawings and the Standards of
the Work
N1) N2) N3) N4) N5)
Ensure the completion of the drawings
Ensure the approval of the drawings
Check the conformity of the drawings to the natural surroundings
Study the tables attached to the drawings
143
אאא
אא
אא
אאאא
I6) I7)
Determine the deadline for implementation
Supervise breaking operations
K6) K7) K8) K9) K10)
Determine the painting work
Determine the iron work
Determine the sanitary and
electrical installations
Determine the false ceiling work
Determine the wood
work
M6) M7) M8) M9)
Apply standards on false ceiling
Apply standards on ceramics and
marble
Apply standards on
the work of the doors and
the windows
Prepare forms for the finished work
144
אאא
אא
אא
אאאא
General Knowledge and Skills Worker Behaviors
1. English language proficiency 2. Computer skills
3. Drawing skills 4. Quantity calculations 5. Knowledge of terminology
6. Knowledge of rules and regulations 7. Knowledge administrative aspects
8. Knowledge of internal material for building constructions
9. Details of the types of concrete used
1. trustworthy 2. Patient 3. Dedicated 4. Organized 5. Meticulous 6. Flexible 7. Self-confident 8. Team player 9. Decisive 10. Leading 11. Responsible
Trends and Future Concerns Tool, Equipment and Material
1. Importance of training programs 2. Completing university studies 3. Applying new technology
4. Changes to the nature of the external work 5. Attending seminars and courses
6. Having necessary powers required by skills and the nature of his work
1. Computer 2. Measuring tools 3. Office tools 4. Testing machines 5. Split level
6. Hand tools
7. Means of communication 8. Means of transport 9. photocopier