DACUM Chart For Architectural Supervisor

Dalam dokumen א (Halaman 139-145)

DACUM Panel

Idris Mohamed Al-Drais Ministry of Justice Adel Mohamed Al-Suwaid Water and SanitaryAuthority

Faisal Ahmed Al-Zahrani Ministry of Islamic Affairs Mohamed Mizyad Bin Sharaim Riyadh secretariat – Utaiqa Municipality

Mohamed Raashid Al-Jaman Secretariat of Riyadh Mansour Mohamed Al-Yahya Al-Yahya Block and Tiles Factory

Nasir Abdurahman Al-Sarami Ministry of Education

Mizhar Faiz Al-Shihri Saudi Electric Co.

Waleed Ahmed Al-Zahrani Water and Sanitary Authority

DACUM Facilitators

Dr. Tariq Al-Thuweini Eng. Salih Al-Dhalaan Mr. Mohamed Al-Zahrani Mr. Abdurahman Al-Amr

Developed by:

Technical and Vocational Training Corporation (TVTC)

Curriculum Department Produced for:

Architectural Supervisor

Date 1 - 1423 H Head of Department/Project Engineer

Director General

Director General of Administration Organizational Structure

Architectural Supervisor

Laborers/Technician

140

אאא

 

אא

אא

אאאא

A Apply Safety Procedure

A1) A2) A3) A4) A5) Ensure the

availability of safety equipment

Ensure that proper work clothes are worn

Put up notice boards in the site

Ensure the availability of

emergency plans

Ensure the availability of

First Aid box

B

Prepare Reports about the Progress of the

Work

B1) B2) B3) B4) B5) Prepare reports

about the work of the technicians

Prepare a report about the material

and the machines used

Prepare a report about carpentry

work

Prepare a report about raw material for the

work

Prepare a report about the waste

in the site

C Participate in Receiving the Site

C1) C2) C3) C4) C5)

Ensure that the site has no waste

Participate in checking the conformity drawings to the

site

Participate in preparing the receiving report

of the site

Check the conformity of the site to the

officials documents

Compare the drawings with other officials documents

D Receive the Documents of the

Projects

D1) D2) D3) D4) D5) Receive the cost

for beginning the work

Receive the handing over report of the site

Receive the tables for quantities, standards and

drawings

Ensure the availability of

permissions related to the

site

Receive the list of laborers and technicians

needed for executing the

project

Prepare a Timetable for

Follow-up of Implementing the

Works

E1) E2) E3) E4) E5)

E

Prepare a timetable for

electric installations

Prepare a timetable for

sanitary installations

Prepare a timetable for installing doors

Prepare a timetable for

wall facing

Prepare a timetable for painting work

Participate in Receiving the Constructional Framework of the

Buildings

F1) F2) F3) F4) F5)

F

Receive excavations and

fillings

Receive the budget of the framework stage

of the project

Receive carpentry of the

foundation

Receive reinforcement

work of the foundation

Receive carpentry work of the columns and their heads

G Receive Finishing Work

G1) G2) G3) G4) G5) Test the

pressure of the internal water

lines

Receive wall

facing work Receive tile work Receive marble work

Receive ceramic work

H Implement Administrative

Decisions

H1) H2) H3) H4) H5) Attend regular

meetings

Implement fines on laborers and

technicians

Observe clocking in and clocking

out times

Abide by the directions of the project engineer

Distribute administrative decisions to the

workers of the project

Duties Tasks

141

אאא

 

אא

אא

אאאא

A6) A7) Ensure the

proper storage of materials

Ensure the soundness of the materials

used

C6) Surround the

site with fence suitable for its dimensions

E6) E7) Prepare a

timetable for tiling work

Prepare a timetable for false ceilings

F6) F7) F8) F9) F10) F11) F12)

Participate in receiving work on the reinforcement of the columns and the heads

Participate in receiving the carpentry work of the

ceiling

Participate in the reinforcement

of the ceiling

Participate in receiving the casting of the

concrete

Participate in receiving the work on the lintels of the doors and

windows

Participate in receiving the work of the

building

Participate in receiving the

work on sanitary and

electrical supplies

142

אאא

 

אא

אא

אאאא

I

Follow up Maintenance

and Repair Work

I1) I2) I3) I4) I5)

Determine defective places

Determine amount of work

Determine the number of laborers and

technicians needed for the

work

Determine the cost of the work

Approves of the samples needed for the repair

J

Ensure the Soundness and

Availability of essential Equipment and

Machines

J1) J2) J3) J4)

Ensure the availability of

hand tools

Ensure the availability of

electrical equipment

Ensure the availability of

mechanical equipment

Ensure the availability of equipment for

moving

K

Determine the Quantity of Accomplished

Work

K1) K2) K3) K4) K5) Determine the

construction work

Determine the wall facing work

Determine the tiling work

Determine masonry work

Determine ceramic and marble work

L

Supervise Laborers and

Technicians

L1) L2) L3) L4) L5) Prepare records

for following up workers

Assess workers' performances

Distribute workers according to their vocations

Distribute workers according

to needed work

Determine the number of laborers and technicians of

the project

M

Supervise the Application of Standards and Measurements

on Implementing

the Work

M1) M2) M3) M4) M5)

Check that the acquired material conforms to the

samples

Test the quality of the insulation

Test the installations of the electric and sanitary material

Apply the standards on construction work

Apply standards on painting

work

N

Study the drawings and the Standards of

the Work

N1) N2) N3) N4) N5)

Ensure the completion of the drawings

Ensure the approval of the drawings

Check the conformity of the drawings to the natural surroundings

Study the tables attached to the drawings

143

אאא

 

אא

אא

אאאא

I6) I7)

Determine the deadline for implementation

Supervise breaking operations

K6) K7) K8) K9) K10)

Determine the painting work

Determine the iron work

Determine the sanitary and

electrical installations

Determine the false ceiling work

Determine the wood

work

M6) M7) M8) M9)

Apply standards on false ceiling

Apply standards on ceramics and

marble

Apply standards on

the work of the doors and

the windows

Prepare forms for the finished work

144

אאא

 

אא

אא

אאאא

General Knowledge and Skills Worker Behaviors

1. English language proficiency 2. Computer skills

3. Drawing skills 4. Quantity calculations 5. Knowledge of terminology

6. Knowledge of rules and regulations 7. Knowledge administrative aspects

8. Knowledge of internal material for building constructions

9. Details of the types of concrete used

1. trustworthy 2. Patient 3. Dedicated 4. Organized 5. Meticulous 6. Flexible 7. Self-confident 8. Team player 9. Decisive 10. Leading 11. Responsible

Trends and Future Concerns Tool, Equipment and Material

1. Importance of training programs 2. Completing university studies 3. Applying new technology

4. Changes to the nature of the external work 5. Attending seminars and courses

6. Having necessary powers required by skills and the nature of his work

1. Computer 2. Measuring tools 3. Office tools 4. Testing machines 5. Split level

6. Hand tools

7. Means of communication 8. Means of transport 9. photocopier