DACUM Panel Asad Bin Abduaziz Aldwela
Saudi Electrical Company Bashir Bin Ahmed Alsaid Saudi Electrical Company Tawfiq Bin Abdul Aziz Aldrees Program of Operation and Maintenance
of Seweg. - Riyadh Khaled Bin Osman Alglish
King Abdulaziz city for Science and Technology
Salem BinGhannam Aldosery
King Faisal Specialized Hospital in Riyadh
Saad Bin Abdullah Alhazza
Program for Operation and Maintenance of Water – Riyadh
Saleh Bin Abdullah Alagil Ministry of Defence and Aviation Abdulaziz Bin abdullah Abo Haimed Saudi Electrical Company (Testing and
Protection)
Fahd Bin Abdullah Hamad Shanan Alkhuraif Company Mosaed Bin Ahmed Algharibi
Saudi Electrical Company Hesham Bin Mohamed Basry Ministry of Finance and National Economy – Alnasria Electrical Power
Station
DACUM Facilitators
Dr. Tarek Bin Mohamed Althwaini Mr. Saleh Bin Abdullah Alrumi Mr. Abdullrahman Alamr
Developed by:
Technical and Vocational Training Corporation (TVTC)
Curriculum Department Produced for:
Electrical Power Installation Technician
Date 11 - 1422 H Installation Technician
Maneger / First Engineer Supervisor / Engineer Organizational Structure
Assistant Technician
133
אאא
אאאא
אאאא
A
Applies safety precautions
A1) A2) A3) A4) A5) Organizes with
other departments
Wears protecting suits and equipment’s
Keeps away a
safe distance Uses suitable tools
Makes sure of the presence of another person in
the work site
B
Implements building installations
B1) B2) B3) B4) B5) Reads and
investigates the installation
layout
Determines the required materials
Fixes supports and conduits
Carry out insulated and fire
resistant installations
Pulls wiring inside the
conduits B13) B14) B15)
Checks the electrical
network
Connects the electrical power
to the building
Writes report about the workdone
C Installs KWH meters
C1) C2) C3) C4) C5)
Examines the site
Makes sure of using the suitable
wiring/cable size
Installs cables up to the main circuit breaker
Fixes and connects the KWH meters
Fixes and connects current
transformers
D
Installs overhead transmission
lines
D1) D2) D3) D4) D5) Participates in
tower construction
Fixes insulators
to the tower arms Erects OHL conductors
Installs the earthing conductor
Fixes warning signs on the
OHL
E
Performs the maintenance
of power stations
E1) E2) E3) E4) E5) Performs routine
maintenance schedule
De-energizes the power station
Performs maintenance of HV switchgears
Performs maintenance of the main circuit breakers panel
Isolate power transformers
E13) E14) Puts the power
station back to service
Writes report about the workdone
F
Diagnosis of electrical
faults
F1) F2) F3) F4) F5) Receives fault
information’s
Uses electrical drawings
Finds out location and type
of fault
Disconnects power from the
fault area
Prepares required spare
parts
Duties Tasks
134
אאא
אאאא
אאאא
A6) A7) A8) A9) A10) Makes sure of
the availability of safety
means
Disconnects the electrical
power
Makes sure that no body can reconnect
the power
Discharges
electrostatics Uses warning statements
B6) B7) B8) B9) B10) B11) B12) Fixes main and
secondary distribution
panels
Installs power transformers
Installs electrical
devices
Connects contactors
circuits
Connects earthing network
Installs under ground cables
Connects the internal loads
C6) C7) C8) C9) C10) Connects
power to the main circuit
breaker
Tests the KWH meters
Tests the current transformers
Carryout periodical inspection of
HV meters
Writes report about the workdone
D6) D7) D8)
Fixes warning signs on the
towers
Checks the new OHL
Connects the OHL to the
substation
Performs maintenance of energized HVL
Performs maintenance of
the terminal connections
Performs periodical and
emergency maintenance of
OHL
Writes report about the workdone E6) E7) E8) E9) E10) E11) E12)
Performs maintenance of
protection devices
Performs maintenance of
control equipment/dev
ices
Performs maintenance of
batteries and dc circuits
Performs maintenance of
measuring instruments
Checks the operating systems of HV
substation
Checks the alarm system
devices
Checks the earth network
in power stations
F6) F7) F8) F9) F10) F11) F12)
Clears the fault Tests the network after fault clearance
Reconnects the power to the disconnected
area
Writes report about the workdone
135
אאא
אאאא
אאאא
G Operates substations
G1) G2) G3) G4) G5) Receives
working orders Uses electrical drawings
Organizes with related departments
Inspects
substations Performs the working orders
H Installs under ground cables
H1) H2) H3) H4) H5) Organizes with
related sectors
Tracing routs of the under ground cables
Installs under
ground cables Performs cable
insulation tests Performs cable maintenance
I
Examines quality and implementation
of standard installations
I1) I2) I3) I4) I5) Makes sure of
implementing the standards and
regulations
Prepares testing instruments
Checks the installation
Attends inspection and
quality tests
Compares the measurements with the required
standard
136
אאא
אאאא
אאאא
G6) G7)
Prepares the warning signs
Writes report about the workdone
H6) H7) H8)
Performs cable connections and
terminals
Checks earthing boxes
Writes report about the workdone I6)
Writes report about the workdone
137
אאא
אאאא
אאאא
General Knowledge and Skills Worker Behaviors 1. Having good English language
2. Having knowledge of technical expressions
3. Having knowledge of technical symbols
4. Competence in using measuring instruments
5. Skilful in using computer
6. Having knowledge of electrical layouts and drawings
7. Having skills in report writing 8. Having skills in first aid 9. Aware of safety protocols
1. Self confidence 2. Honesty
3. Achieving the assigned jobs precisely 4. Intelligent
5. Tacking care of properties 6. Paying attention during work 7. Achieving the instruction strictly 8. Good personality
9. Wearing the formal uniform
Trends and Future Concerns Tool, Equipment and Material 1. Having intention to upgrade his
career
2. Employment safety 3. Self development
4. Improving the image of the field work in the society
5. Looking forward to establishing electrician syndicate
6. Looking forward to have compensation for work dangers
1. AVO meters 2. Hand tools 3. Measurement 4. Hand gloves 5. Direction current
meter 6. Drill
7. Hydraulic piston 8. Suitable suit 9. Hydraulic scissors 10. Main and secondary
injecting instruments 11. Gas cylinder
12. Thermal camera 13. Welding instrument 14. Generator
15. Ladders 16. Testing stick 17. First aid bag
18. Air compressor 19. Electric saw 20. Portable lamps 21. Welding glasses 22. Conduit pending
machine 23. Hand grinders 24. Cable scissors 25. Cable insulator
remover
26. Phase shift meter 27. Bus-bar temperature
meter
28. Phase sequence meter 29. Frequency meter 30. Ground resistance
meter 31. Computer 32. Discharging
instrument
33. Remote cable gun