DACUM Panel
Ibrahim Abdul-Aziz Al-Hamad Saudi Ele. Co. Thadic Service Department
Asad Abdul-aziz Al-Dowielaa Saudi Ele. Co. Transmission Department
Riyadh
Turki Abdul-Aziz Al-Gowiez Saudi Ele. Co. Riyadh Electricity Khodier Abdul-Rahman Al-Khodier Saudi Ele. Co. Transmission Department
Al-Gasiem
Saleh Muslim Al-Mosalamani Saudi Ele. Co.- Transmission Department
Haiel
Abdul-Rahman Abdullah Al-Mazroua Saudi Ele. Co.- Soudaier Service Dept.
Abdul-Salam Ahmed Al-Gamdi Saudi Ele. Co. Riyadh Electricity
Abdul-Aziz Saad Al-Moshabi Saudi Ele. Co. Transmission Department
Riyadh
Mohamed Ali AL-Sowian Saudi Ele. Co. Riyadh Electricity
DACUM Facilitators Mr. Saleh Al-Rumi Mr. Saleh Al-Juielan
Developed by:
Technical and Vocational Training Corporation (TVTC)
Curriculum Department
Level of Entry: Secondary School \ Technical Secondary School
Date: Muharam 1425 H Over-Head Lines Supervisor
Manager
Engineer
Organizational Structure
Over-Head Lines Technician
Electrician Assistant
104
אאא
אאאא
אאא
א
A Sticks to Safety Regulations
A1) A2) A3) A4) A5)
Wears suitable safety uniforms
Chooses suitable weather conditions
Organizes with other related
sections
Uses the directing signs and safety locks
Makes sure of the availability of warning and directing signs
and safety locks
B
Repairs Over Head lines Network
Faults (High Voltage)
B1) B2) B3) B4) B5) Receives the
work order
Organizes with other related
sections
Visually inspects the network
Makes sure that the network is
disconnected and isolated
Closes the work site
C
Repairs Over Head lines Network
Faults (Intermediate/low
Voltage)
C1) C2) C3) C4) C5)
Receives the work order
Organizes with other related
sections
Visually inspects the network
Inspects the network with the inspection
devices
Isolates the faulty section from the rest of
the network
D
Carries on Periodical Maintenance for
Over Head lines Network (High/
Intermediate &
Low Voltages)
D1) D2) D3) D4) D5) Follows the
Scheduled maintenance
program
Receives the work order
Makes sure that no objects under the over head
lines
Organizes with other related
sections
Isolates the faulty section from the rest of
the network D13) D14) D15)
Removes the Earthing
Participates in canceling the
work order
Prepare the report
E Carries on Erection of Over Head Lines
E1) E2) E3) E4) E5)
Receives the work order
Prepares the work site
Fixes the cable pulling pulley on
the tower
Erects the conductors over the towers
or posts
Removes the cable pulling
pulley
F
Participates in Construction of Towers \ Posts for
Over Head Lines
F1) F2) F3) F4) F5) Revise the
layouts
Participates in constructing the
frame of the tower \ post
Construct the tower \ post
accessories
Fixes the conductors accessories
Connects the Earthing conductor
G
Participates in the Over Head Lines
Network Acceptance
Committee
G1) G2) G3) G4) G5) Participates in
conformation of the specifications
Participates in revising the
execution layouts on site
Inspects the tower or post
Inspects the towers or posts insulators series
and their accessories
Inspects the conductors terminal connectors
Duties Tasks
105
אאא
אאאא
אאא
א
A6) A7) A8) A9) A10) A11)
Makes sure that another person is on the site during
work
Follows exactly the
steps of executing the
job
Makes sure that all network are
earthed and isolated
Keeps safe distance
Makes sure of discharging all electrostatics
Makes sure that the site is free from tools and equipments
B6) B7) B8) B9) B10)
Earth's the network
Replaces the faulty parts
Removes the Earthing
Participates in canceling the
work order
Prepare the report
C6) C7) C8) C9) C10) C11)
Earth's the work area
Replaces the faulty parts
Removes the Earthing
Cancels the work order
Re-energizes the network
Prepare the report
D6) D7) D8) D9) D10) D11) D12)
Earth's the network
Inspects the towers or posts
Inspects the towers or posts
insulators and accessories
Inspects the fuses
Inspects the surge arrestors
Inspects the loading
switch
Inspects cable terminals
E6) E7)
Joins the conductors
terminals
Prepare the report
G6) G7) G8)
Inspects the fuses Inspects the surge arrestors
Participates in preparing the
acceptance committee
report
High voltage: More than 110Kv Intermediate voltage: More than 11Kv Low Voltage: Less than 1Kv
106
אאא
אאאא
אאא
א
General Knowledge and Skills Work Ethics
1. Knowledge of technical terms and symbols in his field.
2. Knowledge of the technical English in his field.
3. Knowledge of first aid.
4. Knowledge of reading technical layouts and drawing.
5. Having knowledge in using computers.
6. Having knowledge in basics of the constructions of the over head lines towers and posts.
7. Knowledge of basics of electricity.
1. Self-confidence.
2. Doing his job faithfully.
3. Honesty.
4. Feeling the responsibility.
5. Accurateness in doing his work.
6. Punctuality.
7. Care during work.
8. Taking care of the establishment property.
9. Caution during work.
10. Cute ( Sharp-witted , Quick-thinking ) 11. Teamwork spirit.
12. Sticks to the formal uniforms.
Trends and Future Concerns Tools, Equipments and Materials
1. Career security.
2. Using the computers in daily work 3. Following up the latest technologies
in his field.
4. Following up the developing courses in his specialization.
5. Career promotion steps.
1. Suitable measuring instruments.
2. Manual lift.
3. Suitable tools and devices
4. Ropes.
5. Pulleys.
6. Ladders 7. Torch 8. Generator.
9. Tint.
10. Hydraulic Sesser's.
11. Transportation means.
12. Conductor pulling device.
13. Hydraulic piston
14. Make and break switchgear on load.
15. Magnifying-glass 16. Insulated stick.
17. Electric Drill.
18. Welding equipments.
19. Electric saw
20. Cable pulling links.
21. High voltage test meter.
22. Phase sequence meter.
23. Thermal camera.
24. Conductor vibration measuring device.
25. AVO meter.
26. Earthing resistance measuring meter.
27. Conductor height measuring device.
28. Earthing connection.
29. Megger.
30. Tower frame galvanization
inspection device.
31. Compass.
32. Telecommunications means.
33. Cleaning materials, 34. Warning lights.
35. Lift.
36. Electrostatic discharging device.