Strategi c Objectiv e

Measura ble Objectiv e

Key Performa nce Indicator

Baseline Annual Target

Input Indicat ors

Output Indicator s

Outcom e Indicato rs

Actual Perform ance

Reason for under/ov er Perform ance

Remedi al Action

Portfolio of Evidence

Annex ure

ns) financial year

house connectio ns) by 30 June 2015

To provide access to sustainab le water to existing and new communi ties

New water connectio ns done per request by residents, business and commerci al

267 new water connectio ns done during 2013/14 financial year

New water connections done per request by residents, business and commercial by 30 June 2015

Financi al and Person nel Resour ces

New water connectio ns

Improve d living standard s

Achieved

There were 12 new water connectio ns requeste d and done

N/A N/A Water

connection s

application forms

B

To provide access to sustainab le water to

Number of water meters replaced by residents,

280 water meters were replaced during

Water meters replaced per request by

residents,

Financi al and Person nel Resour

Meters replaced

Improve d service delivery

Achieved

There were 231

N/A N/A Replaceme

nt of water meter/s maintenanc e forms

C

123

Strategi c Objectiv e

Measura ble Objectiv e

Key Performa nce Indicator

Baseline Annual Target

Input Indicat ors

Output Indicator s

Outcom e Indicato rs

Actual Perform ance

Reason for under/ov er Perform ance

Remedi al Action

Portfolio of Evidence

Annex ure

existing and new communi ties

business and commerci al

2013/14 financial year

business and commercial by 30 June 2015

ces meters

replaced as per request

To provide access to sustainab le water to existing and new communi ties

Number of zonal meters and valves installed

4 meters installed during 2013/14 financial year

Zonal meters and valves installed per request by 30 June 2015

Financi al and Person nel Resour ces

Zonal meters and valves installed

Improve d living standard s

Achieved

No zonal meters and valves were installed

There was no request to install zonal meters and valves

N/A Memo D

To ensure effective free basic water

Number of househol ds provided with free basic

17 224 househol ds were provided with free basic water

22 000 households provided with free basic water by 30 June 2015

Financi al And Person nel Resour

Househol ds Provided with free basic water

Improve d living Standar ds

Achieved

22000 househol ds were

N/A N/A Billing

report

E

Strategi c Objectiv e

Measura ble Objectiv e

Key Performa nce Indicator

Baseline Annual Target

Input Indicat ors

Output Indicator s

Outcom e Indicato rs

Actual Perform ance

Reason for under/ov er Perform ance

Remedi al Action

Portfolio of Evidence

Annex ure

water basic

water(rur al areas per month Provisio

n of Sanitatio n to Commun ities

To provide access to sanitation services to existing and new communi ties.

Number of Househol ds provided with access to basic house sewer connectio ns

13 000 househol ds were provided with access to basic house sewer connectio ns

13000 Households provided with access to basic house sewer connections by 30 June 2015

Financi al and Person nel Resour ces

Househol ds provided with access to basic house sewer connectio ns

Improve d living standard s

Target exceede d

16007 househol ds were provided with access to basic house sewer connectio ns

Due to increase d number of househol ds billed per meter

The unit will adhere to the develope d work plans in the next financial year

Billing report

F

125

Strategi c Objectiv e

Measura ble Objectiv e

Key Performa nce Indicator

Baseline Annual Target

Input Indicat ors

Output Indicator s

Outcom e Indicato rs

Actual Perform ance

Reason for under/ov er Perform ance

Remedi al Action

Portfolio of Evidence

Annex ure

To provide access to sanitation services to existing and new communi ties

Mega litres of waste discharge d provided that meets waste discharge standard provided per day

50 Ml does not meet waste discharg e standard s

50 Mega litres of waste discharged provided that meets waste discharge standards provided per day by 30 June 2015

Financi al and Person nel Resour ces

Mega litres of waste discharge d provided that meets waste discharge standard s provided

Improve d living standard s

Not Achieved

28.2 Mega litres of waste discharg ed provided that meets waste discharg e standard s

Poor Phosphat e removal detected on effluents from both WWTW plants

Install the Chlorinat ion system for regular Chlorine accordin g to the general discharg e standard .

Laboratory Reports

G

Provisio

n of To Kms of None 3.2 Kms of Financi Construct Useable Not The To Appointme H

Strategi c Objectiv e

Measura ble Objectiv e

Key Performa nce Indicator

Baseline Annual Target

Input Indicat ors

Output Indicator s

Outcom e Indicato rs

Actual Perform ance

Reason for under/ov er Perform ance

Remedi al Action

Portfolio of Evidence

Annex ure

and storm water to Commun ities

provision of new roads and storm water infrastruc ture while upgradin g existing infrastruc ture.

road construct ed in Mooipan – entrance from Kopela road via Mooipan to Weltevre de Exit

road constructed in Mooipan – entrance from Kopela road via Mooipan to Weltevrede Exit by 30 June 2015

Funding , Person nel and Contrac tors Resour ces

of new tar road

the commun ity

Achieved

The new tar road was not construct ed

was due to late appointm ent of the contracto r The delay was due to late appointm ent of contracto r and develop ment of terms reference , however a contracto r was appointe d on the 25 May 2015.

3.2 Kms of new tar road in Mooipan – entrance from Kopela road via Mooipan to Weltevre de Exit in the next financial year

nt letter

127

Strategi c Objectiv e

Measura ble Objectiv e

Key Performa nce Indicator

Baseline Annual Target

Input Indicat ors

Output Indicator s

Outcom e Indicato rs

Actual Perform ance

Reason for under/ov er Perform ance

Remedi al Action

Portfolio of Evidence

Annex ure

To ensure provision of new roads and storm water infrastruc ture while upgradin g existing infrastruc ture.

Kms of Upgradin g of main road in Madibe Makgaba ne Phase 2

None 2 Kms of Upgrading of main road in Madibe Makgabane Phase 2 by 30 June 2015 and 30 June 2016

Financi al funding, Person nel and Contrac tors Resour ces

Upgrade d main road

Useable Road for the commun ity

Not Achieved

1.2 main road was upgraded in Madibe Makgaba ne Phase 2

National Treasury withhold the MIG funding due to late SCM processin g.

The MIG projects will be advertise d timorousl y so as to avoid cutting of allocatio ns

Letter from National Treasury

I

Provisio n of Roads and storm water to Commun ities

To ensure provision of new roads and storm water infrastruc

Kms of Upgradin g of internal roads and by- pass to Seboneg o and

None 1.7 Kms of Upgrading of internal roads and by-pass to Sebonego and Matsheka Road by 30

Financi al funding, Person nel and Contrac tors

Upgrade d internal roads and by- pass to Seboneg o and Matsheka Road

Useable Road for the commun ity

Not Achieved

1.1 Kms of internal roads

National Treasury withhold the MIG funding due to late SCM processin g.

The MIG projects will be advertise d timorousl y so as to avoid cutting of

Letter from National Treasury

J

Strategi c Objectiv e

Measura ble Objectiv e

Key Performa nce Indicator

Baseline Annual Target

Input Indicat ors

Output Indicator s

Outcom e Indicato rs

Actual Perform ance

Reason for under/ov er Perform ance

Remedi al Action

Portfolio of Evidence

Annex ure

upgradin g existing infrastruc ture.

Road June 2015 ces pass to

Seboneg o and Matshek a Road were upgraded

ns

To ensure provision of new roads and storm water infrastruc ture while upgradin g existing infrastruc ture.

KMs of paved main road in Ext 39 Phase 2

None 1.6 km of paved main road in Ext 39 Phase 2 by 30 June 2015

Financi al Funding , Person nel and Contrac tors Resour ces

Paved main road

Useable Road for the commun ity

Not Achieved

1.1 km of main road was paved in Ext 39 Phase 2 by 30 June 2015

National Treasury withhold the MIG funding due to late SCM processin g.

The MIG projects will be advertise d timorousl y so as to avoid cutting of allocatio ns

Letter from National Treasury

K

To ensure

KMs of tar road

None 3.3 KMs of tar road

Financi al

Construct ed tar

Useable Road for

Not National Treasury

The MIG projects

Letter from National

L

129

Strategi c Objectiv e

Measura ble Objectiv e

Key Performa nce Indicator

Baseline Annual Target

Input Indicat ors

Output Indicator s

Outcom e Indicato rs

Actual Perform ance

Reason for under/ov er Perform ance

Remedi al Action

Portfolio of Evidence

Annex ure

provision of new roads and storm water infrastruc ture while upgradin g existing infrastruc ture.

construct ed from Mr-T to Seweding Phase 2

constructed from Mr-T to Seweding Phase 2 by 30 June 2015

Funding , Person nel and Contrac tors Resour ces

road the commun ity

Achieved

1.8 KMs of tar road was construct ed from Mr-T to Sewedin g Phase 2

withhold the MIG funding due to late SCM processin g.

will be advertise d timorousl y so as to avoid cutting of allocatio ns

Treasury

Provisio n of Roads and storm water to communi ties

To ensure provision of new roads and storm water infrastruc ture while upgradin

Number of bridges construct ed between Serotswa na, Moraka and Masutlhe

None 1 Bridge constructed between Serotswana , Moraka and

Masutlhe by 30 June 2015

Financi al Funding , Person nel and Contrac tors Resour ces

Construct ed bridge

Safe passing by the commun ity

Achieved 1 Bridge was construct ed between Serotswa na, Moraka and

N/A N/A Letter from

National Treasury

M

Strategi c Objectiv e

Measura ble Objectiv e

Key Performa nce Indicator

Baseline Annual Target

Input Indicat ors

Output Indicator s

Outcom e Indicato rs

Actual Perform ance

Reason for under/ov er Perform ance

Remedi al Action

Portfolio of Evidence

Annex ure

infrastruc ture.

Provisio n of Roads and storm water to communi ties

To ensure provision of new roads and storm water infrastruc ture while upgradin g existing infrastruc ture.

KMs of tar road construct ed at Themban e Phase 1

None 2.2 KMs of tar road constructed in

Thembane Phase 1 by 30 June 2015

Financi al funding, Person nel and Contrac tors Resour ces

Construct ed tar road

Useable Road for the commun ity

Not Achieved 0.9 KMs of tar road was construct ed in Themban e Phase 1 by 30 June 2015

National Treasury withhold the MIG funding due to late SCM processin g.

The MIG projects will be advertise d timorousl y so as to avoid cutting of allocatio ns

Letter from National Treasury

O

To ensure provision of new roads and storm

KMs of Tar road construct ed at Ext 38 main road

None 1.2 KMs of tar road constructed at Ext 38 main road by 30 June

Financi al Funding , Person nel and

Construct ed tar road

Useable Road for the commun ity

Not Achieved

1.0 KMs of tar road was

National Treasury withhold the MIG funding due to late SCM

The MIG projects will be advertise d timorousl y so as

Letter from National Treasury

P

131

Strategi c Objectiv e

Measura ble Objectiv e

Key Performa nce Indicator

Baseline Annual Target

Input Indicat ors

Output Indicator s

Outcom e Indicato rs

Actual Perform ance

Reason for under/ov er Perform ance

Remedi al Action

Portfolio of Evidence

Annex ure

water infrastruc ture while upgradin g existing infrastruc ture.

2015 Contrac

tors Resour ces

construct ed at Ext 38 main road

processin g.

to avoid cutting of allocatio ns

To ensure provision of new roads and storm water infrastruc ture while upgradin g existing infrastruc ture.

Number of bridges construct ed at Mahupe Section

None 1 Bridge constructed at Mahupe Section by 30 June 2015

Financi al funding, Person nel and Contrac tors Resour ces

Bridges construct ed

Useable Road for the commun ity

Not Achieved

The bridge was not construct ed at Mahupe section

National Treasury withhold the MIG funding due to late SCM processin g.

The MIG projects will be advertise d timorousl y so as to avoid cutting of allocatio ns

Letter from National Treasury

Q

Provisio

n of To Kms of 0 Km of 4 Kms of Financi Rre- Useable Not Due to Purchas Roads and R

Strategi c Objectiv e

Measura ble Objectiv e

Key Performa nce Indicator

Baseline Annual Target

Input Indicat ors

Output Indicator s

Outcom e Indicato rs

Actual Perform ance

Reason for under/ov er Perform ance

Remedi al Action

Portfolio of Evidence

Annex ure

and storm water to Commun ities

provision of new roads and storm water infrastruc ture while upgradin g existing infrastruc ture.

roads re- graved at Ga- Molema ward 26, Gajawula ward 1 and Mabuduts ha ward 2

roads were re- graved

roads re- graved at (1.33km) Ga-Molema ward 26, (1.33km) Gajawula ward 1 and (1.33km) Mabudutsh a ward 2 by 31 March 2015

funding, Person nel and Contrac tors Resour ces

gravel road

the commun ity

Achieved

The gravel roads were not re- gravelled at Ga- Molema ward 26, Gajawula ward 1 and Mabudut sha ward 2

of heavy machiner y TLB and Excavato r.

machiner y and TLB and Excavato r.

water Daily Reports

To ensure provision of new roads and

Kilometer s of road patched and resealed

17.03 kms of roads patched and

24 Kms of roads patched and resealed by 30 June

Financi al Funding , Person

Patched and resealed roads

Useable Road for the commun ity

Target exceede d 30.092 Kms of

To cover the work which was not done during

The unit will adhere to the develope d work

Roads and Storm water Daily Reports

S

133

Strategi c Objectiv e

Measura ble Objectiv e

Key Performa nce Indicator

Baseline Annual Target

Input Indicat ors

Output Indicator s

Outcom e Indicato rs

Actual Perform ance

Reason for under/ov er Perform ance

Remedi al Action

Portfolio of Evidence

Annex ure

storm water infrastruc ture while upgradin g existing infrastruc ture.

resealed 2015 nel and Contrac tors Resour ces

roads were patched and resealed by 30 June 2015

the strike from 28th July to 27 August 2014

plans in the next financial year

Provisio n of Electricit y to Commun ities

To ensure an effective free basic electricity service.

Number of Househol ds provided with free basic electricity

9000 househol ds were provided with free basic electricity

9000 Households provided with free basic electricity per month

Financi al Funding , Person nel and Registe r

Free basic electricity provided

Improve d indigent s standard of leaving

Not Achieved

No househol d was provided with free basic electricity

The indigents register that was compiled and complete d was withdraw n by the council and indicated that it should be

To prepare indigents register accordin g to the 31 wards within the Municipa l area in the next financial year and then provide

Indigents Register

T

Strategi c Objectiv e

Measura ble Objectiv e

Key Performa nce Indicator

Baseline Annual Target

Input Indicat ors

Output Indicator s

Outcom e Indicato rs

Actual Perform ance

Reason for under/ov er Perform ance

Remedi al Action

Portfolio of Evidence

Annex ure

accordin g to the wards

basic electricit y

To ensure communi ty areas visibility

Number of Street lights maintaine d

3612 lights maintain ed

3782 Street lights maintained per need by 30 June 2015

Financi al Funding and Person nel Resour ce

Maintaine d street lights

Safety of commun ity member and road users

Achieved

3782 Street lights were maintain ed per need

N/A N/A Daily Street lights Maintenanc e Reports

U

Provisio n of Electricit y to Commun ities

To ensure communi ty areas visibility

Number of high mast lights maintaine

256 lights maintain ed

554 high mast lights maintained per need by 30 June

Financi al Funding and Person

Maintaine d high mast lights

Safety of commun ity member and

Achieved

554 high mast

N/A N/A Monthly

High mast lights Maintenanc e Reports

V

135

Strategi c Objectiv e

Measura ble Objectiv e

Key Performa nce Indicator

Baseline Annual Target

Input Indicat ors

Output Indicator s

Outcom e Indicato rs

Actual Perform ance

Reason for under/ov er Perform ance

Remedi al Action

Portfolio of Evidence

Annex ure

d 2015 nel

Resour ce

road users

lights were maintain ed per need Provisio

n of Electricit y to Commun ities

To ensure communi ty areas visibility

Number of traffic lights maintaine d

None 26 traffic lights maintained by 30 June 2015

Financi al Funding and Person nel Resour ce

Maintaine d traffic lights

Safety of commun ity member and road users

Achieved

26 traffic lights were maintain ed

N/A N/A Daily

Traffic lights Maintenanc e Reports

W

Provisio n of Electricit y to Commun ities

To ensure sustainab le supply of

Number of Househol ds provided with basic

None 213

Households provided with basic electricity at Madibe-

Financi al Funding and Person nel

Basic electricity provided

Improve d commun ity living

Achieved

213 Househol ds

N/A N/A Eskom

Reports X

Strategi c Objectiv e

Measura ble Objectiv e

Key Performa nce Indicator

Baseline Annual Target

Input Indicat ors

Output Indicator s

Outcom e Indicato rs

Actual Perform ance

Reason for under/ov er Perform ance

Remedi al Action

Portfolio of Evidence

Annex ure

electricity Madibe- Kgabana Ext and NW383 Mafikeng Infills

NW383 Mafikeng Infills by 30 June 25

ce with

basic electricity at Madibe- Kgabana Ext and NW383 Mafikeng Infill Coordina

ted and harmoni ous Environ ment

To ensure a clean and healthy environm ent through the provision

Number of househol d provided with refuse removal services in residentia l urban areas

15 000h/

h where provided with refuse removal services in residenti al urban areas

15 000 household provided with refuse removal services in residential urban areas by 30 June 2015

Financi al Funding and EPWP Person nel resourc es

Provided refuse removal services to residentia l urban areas

Clean and healthy environ ment for the wellbein g of citizens

Achieved

15000 househol d were provided with refuse removal services in residenti al urban

N/A N/A Refuse

Removal Service Reports (Residentia l urban areas)

Y

137

Strategi c Objectiv e

Measura ble Objectiv e

Key Performa nce Indicator

Baseline Annual Target

Input Indicat ors

Output Indicator s

Outcom e Indicato rs

Actual Perform ance

Reason for under/ov er Perform ance

Remedi al Action

Portfolio of Evidence

Annex ure

of regular refuse removal services

areas

Coordina ted and harmoni ous Environ ment

To ensure a clean and healthy environm ent through the provision of

Number of rural/peri- urban provided with refuse removal services

31 232 rural/

peri- urban househol ds were provided with refuse removal services

31 232 rural/peri- urban households provided with refuse removal services by 30 June 2015

Financi al Funding and EPWP Person nel resourc es

Provided refuse removal services to rural/peri- urban

Clean and healthy environ ment for the wellbein g of citizens

Achieved

31232 rural/peri- urban househol ds were provided with refuse removal services

N/A N/A Refuse

Removal Service Reports (Rural/

Peri-urban areas)

Z

Strategi c Objectiv e

Measura ble Objectiv e

Key Performa nce Indicator

Baseline Annual Target

Input Indicat ors

Output Indicator s

Outcom e Indicato rs

Actual Perform ance

Reason for under/ov er Perform ance

Remedi al Action

Portfolio of Evidence

Annex ure

refuse removal services

To ensure a clean and healthy environm ent through the provision of regular refuse removal

Number of anti- littering campaign conducte d

5 campaig ns conducte d during 2013/14

4 anti- littering campaign conducted by 30 June 2015

Financi al Funding and EPWP Person nel resourc es

Conducte d anti- littering campaign

Clean and healthy environ ment for the wellbein g of citizens

Not Achieved

2 anti- littering campaig n conducte d by 30 June 2015

Delay in identifyin g dirty arrears as the EPWP workers have already cleaned most arrears

Anti- littering campaig ns to be conducte d as planned in the next financial year

Waste Report

AA

139

Strategi c Objectiv e

Measura ble Objectiv e

Key Performa nce Indicator

Baseline Annual Target

Input Indicat ors

Output Indicator s

Outcom e Indicato rs

Actual Perform ance

Reason for under/ov er Perform ance

Remedi al Action

Portfolio of Evidence

Annex ure

services

To ensure a clean and healthy environm ent through the provision of regular refuse removal services

% Facilitatio n of constructi on composti ng facility

New 100%

Facilitation of

construction composting facility by 30 June 2015

Financi al Funding and EPWP Person nel resourc es

Facilitate d constructi on composti ng facility

Clean and healthy environ ment for the wellbein g of citizens

Not Achieved

The facilitatio n of constructi on composti ng facility did not take place

Waiting for the waste licensing for composti ng facility

To follow up with Departm ent of Rural, Environ ment and Agricultu ral Develop ment on when the license will be received in the next financial year

N/A N/A

Dalam dokumen Annual Report - MFMA (Halaman 122-200)

Dokumen terkait