• Tidak ada hasil yang ditemukan

Indicate by stating agree, strongly agree, disagree, strongly disagree, neutral.(Indicate by making a tick in the box)

Government involvement on housing

5.6 Indicate by stating agree, strongly agree, disagree, strongly disagree, neutral.(Indicate by making a tick in the box)

Activity

STRONGLY AGREE AGREE NEUTRAL DISAGREE STRONGLY DISAGREE

Government responds immediately or on time to community grievances on housing demands

Government chooses right locations for the houses

Relevant government representatives are involved during the execution of low- cost housing

Government provide users with

education on how to maintain the house after handover

Government is trying its best in tackling homeless

137

Faculty of Engineering, Department of Construction Management and Quantity Surveying

1st Floor, room L12, Business Building, Symphony Way (off Robert Sobukwe Road) Bellville, 7530, P.O Box 1906, Bellville, 7535

RE: INTERVIEWS

As an endeavour to deliver adequate social housing to under privileged communities, simultaneously meeting National Building Regulations as set out, and ensuring their efficiency by NHBRC concerning the quality and well-being of owners of low-cost housing. This interview question is expected to get the knowledge and experience of Designer, Contractor and Inspector of the procedures and policies in use from inception to completion. This interview also intended to identify plans and strategies to make the Quality Assurance System effectively towards the delivery of low-cost houses. Construction is a multi-disciplinary industry involving different personnel from different departments with various skills, their inputs in this endeavour will assist the interviewer to; after completing conducting interviews and data analysis from the responses retrieved decide which mechanism is best to respond to quality concerns in low-cost housing. This interview is also anticipated to assist the interviewer in fulfilment of Master of Technology Degree in Construction Management (course) at Cape Peninsula University of Technology in the Department of Construction Management and Quantity Surveying. The title of the thesis is: “Analysis of the effectiveness of Quality Assurance Systems towards delivering low-cost housing in the Western Cape South Africa”. Acquiring procuring

Research Questions The research questions for the research are as follows:

 Are the poor resultant quality problems still persistent in low-cost housing construction?

 Which types of quality assurance systems are in practice in the delivery of low-cost housing?

 Are the quality assurance systems assisting in the delivery of low-cost houses?

 How can the system be implemented to achieve the objective of NHBRC of good quality standards?

 What are the factors hindering the successful implementation of quality assurance systems in low-cost housing?

138

 What strategies are put in place to ensure the complete implementation of quality assurance systems in low-host houses?

APPENDIX B

STRUCTURED INTERVIEWS Building Inspector Survey SECTION A

1.1 As an inspector on site during construction what are your responsibilities?

1.2 Which areas of inspection are your responsibilities?

1.3 As an inspector what do the word quality, quality assurance and quality assurance system mean to you?

1.4 Have you been introduced to quality assurance system in you department?

1.5 Which quality assurance system adopted and in use at your department?

1.6 What is your view on resultant quality of low-cost housing in terms of structural performance within South Africa?

1.7 Is the quality assurance system adopted in your department assisting?

1.8 What are the problems affecting low-cost housing developments within South Africa more so in the Cape Town Metropole as appeared that Cape Town is facing the huge backlog of between 360 000 to 400 000 currently and expected to reach 460 000 by 2020?

1.9 Has Government set realistic time frame targets to eliminate this backlog or are there any strategies to tackle this predicament?

1.10 Don‟t you as Government Department feel that you are exerting too much pressure on designers and contractors in their area of expertise? Give reason for your answer?

1.11 If you answered yes above, how do you plan to achieve a good resultant quality?

1.12 Would it be appropriate to incorporate procurement systems as one of the problems affecting design quality? Give reason for your answer?

1.13 Does the process of benchmarking play a pivotal role in achieving a good end product?

1.14 Considering the huge backlog in housing, do you see a successful implementation of quality assurance systems to inform quality assurance in low-cost housing?

1.15 What strategies are put in place to ensure the complete implementation of quality assurance systems in low-host houses?

139

APPENDIX C STRUCTURED INTERVIEWS

Contractor survey SECTION A

1.1 As a contractor what do the word quality, quality assurance and quality assurance system mean to you?

1.2 What is your view on low-cost housing design and quality within South Africa?

1.3 Have you been introduced to quality assurance system in your company?

1.4 What type of quality assurance system adopted in your company?

1.5 Is the system adopted assisting in the delivery of low-cost houses?

1.6 Are there any problematic issues relating to the construction processes for low-cost housing? If yes, state what these problems are?

1.7 Is government an influential player in the cause of these problematic issues? Give reason for your answer?

1.8 What can be done to achieve good resultant quality in the construction of low-cost housing?

1.9 Would it be appropriate to incorporate procurement systems as one of the problems affecting design quality? Give reason for your answer?

1.10 Does the process of benchmarking play a pivotal role in achieving a good end product?

1.11 Considering the huge backlog in housing, do you see a successful implementation of quality assurance systems to inform quality assurance in low-cost housing?

1.12 What strategies are put in place to ensure the complete implementation of quality assurance systems in low-host houses?

140 APPENDIX D

STRUCTURED INTERVIEWS Designer Survey SECTION A

1.1 As a designer what do the word quality, quality assurance and quality assurance system mean to you?

1.2 What is your view on low-cost housing design and quality within South Africa?

1.3 Have you been introduced to quality assurance system in your company?

1.4 What type of quality assurance system adopted in your company?

1.5 Is the system adopted assisting in the delivery of low-cost houses?

1.6 Are there any problematic issues relating to the construction processes for low-cost housing? If yes, state what these problems are?

1.7 Is government an influential player in the cause of these problematic issues? Give reason for your answer?

1.8 What can be done to achieve good resultant quality in the construction of low-cost housing?

1.9 Would it be appropriate to incorporate procurement systems as one of the problems affecting design quality? Give reason for your answer?

1.10 Does the process of benchmarking play a pivotal role in achieving a good end product?

1.11 Considering the huge backlog in housing, do you see a successful implementation of quality assurance systems to inform quality assurance in low-cost housing?

1.12 What strategies are put in place to ensure the complete implementation of quality assurance systems in low-host houses?

141 APPENDIX E

POOR RESULTANT QUALITY (DELFT, LANGA, SITE C 2004-2012)

Fig. 1: Representation of the complete house in Delft.

Fig. 2 Represent damaged sewer pipe.

Fig. 3 Represent damaged defective sewer pipe and opened wall.

142

Fig. 4 Represent narrow Stair cases in Delft.

Fig. 5 Represent humid walls through moisture.

Fig. 6 Represent structural wall defects due to poor resultant quality.

Fig. 7 Represent structural wall defects due to poor resultant quality.

143

Fig. 8 Represent shoddy works, baths left without trap door for water overflow.

Fig. 9 Represent a typical bath, hand wash-basin and water connection.

Fig. 10 Represent a typical water connection of the bath tap and the position the tap is being installed.

Fig. 11 Represent a house in Delft.

144 APPENDIX F

IMPROVED RESULTANT QUALITY MEASURES (UPINGTON 2014-2015) SITE PHOTOS

Fig. 1 Represent excavation of 400mm x 600mm footing of a 40m² meter BNG house.

Fig. 2 Represent 600mm x 250mm footing (high strength 25Mpa.

Fig. 3 Represent a step footing.

145

Fig. 4 Represent a two skin foundation brick-wall.

Fig. 5 Represent a complete foundation brickwork.

Fig. 6 Represent a backfilled, stumped, leveled with spacers and mesh wire.

Fig. 7 Represent the casting of concrete floor slab.

146

Fig. 8 Represent a complete floor slab.

Fig. 9 Represent the size of the room 2.9m x 2.8m and a house division.

Fig. 10 Represent the laying of dpc for superstructure.

Fig. 11 Represent the hoop-iron tied to the brick-force in every fourth course.

147

Fig. 12 Represent typical hoop-irons positioned correctly every fourth course and the typical external door frame positioning.

Fig. 13 Represent the window frame installed.

Fig.14: Represent superstructure on the window level.

Fig. 15 Represent a complete superstructure (internally & externally).

148

Fig. 16 Represent a complete and correct positioned roof trusses.

Fig. 17 Represent a complete roofing with beam filling.

Fig. 18 Represent the brandering installed at 500mm c/c and electric conduit pipes.

Fig. 19 Represent the zinc supported by bracket on either sides, tap and P-trap pipe underneath.

149

Fig. 20 Represent a typical complete toilet set installed correctly along is the baths trap installed.

Fig. 21 Represent a complete basin with an S-trap pipe underneath and a flexi, water pipe and a tap.

Fig. 22 Represent a complete baths with tap, bath trap.

Fig. 23 Represent a complete ceiling, cornice with trap-door.

150

Fig. 24 Represent a compete ceiling installed with electric lights installed.

Fig. 25 Represent plastering works in progress.

Fig. 26 Represent a house with complete plastering and roofing.

Fig. 27 Represent plumbing works in progress (sewer and water pipes).

151

Fig. 28 Represent a complete Plumbing works (water and sewer pipes).

Fig. 29 Represent the gulley stone installed correctly.

Fig. 30 Represent waist pipe installed ready to be back-filled.

Fig. 31 Represent a complete house (roof, window panes, plumbing and paint.

152

Fig. 32 Represent a complete house with door installed.

Fig. 33: Representation of successful hand-over of a house to a happy beneficiary.