• Tidak ada hasil yang ditemukan

Kheis Municipality: Priority Issues

Chapter 4: Priority Issues

5. HIV/AIDS

4.4 Kheis Municipality: Priority Issues

52 | P a g e

53 | P a g e

established but support still needed

3. HR : insufficient budget to send personnel on training

4. Assistance needed with regards to compilation of IT policies. No dedicated IT official

5. ePerfomance systems will be implemented, but assistance needed to operate the system.

6. Website is up and running but need support to streamline communication.

7. Archive services: assistance needed with to comply with minimum requirements.

8. Customer Care: being practice but assistance needed to do it more effectively.

9. Asset Register: Intend to appoint a service provider to help with asset register to comply with GRAP 17.

11. Support needed in complying with IDP.

54 | P a g e

4.5 TSANTSABANE MUNICIPALITY PRIORITY ISSUE

Tsantsabane is situated in the Siyanda District Municipality. The extent of the geographical area is 5887km2 (Surveyor General; 2008).

Tsantsabane is further bordered by Gamagara to the west, Ga-Segonyana in the north, Kgatelopele in the east and Siyancuma in the south. The major routes running through Postmasburg include the R385 from Kimberley through Beeshoek, the R309 and R325 to Kathu. Postmasburg is situated 180km from Kimberley and 240km from Upington.

Sewage disposal must be maintained Upgrading of Bulk supply services

Housing and Water in Groen Water and Skeifontein Lack of environment expertise in community.

No development in Groen Water and Skeifontein Clinic facilities not functioning properly

Sport grounds is still a need Upgrading of gravel roads Fire Fighting services Land for farming

Dusting pollution a problem Dumping site is a problem Fencing in Groen Water Crime rate high in communities

Tsantsabane

Institutional Support Needed

1. Internal Audit & Risk Management: Assistance required.

2. Assistance required with regards to the

9. Assistance needed to comply with GRAP 17 10. Insufficient revenue management

55 | P a g e

implementation of by-laws.

3. Need support on IT.

4. District HR forum should look at assisting with training needs.

5. No PMS dedicated officials, assistance needed.

6. Customer Care assistance required.

7. Asset Management support needed.

8. District needs to assist with planning, given the fast growing economy in Tsantsabane

56 | P a g e

4.6 //Khara Hais Municipality

Priority Issues Intervention ( Project)

ROADS & TRANSPORT INFRASTRUCTURE

Upgrade taxi ranks in town (Local, Skema and Long distance) Tarring and paving of streets

Secure ground mound (grondwal)

Connecting road: Rosedale / Millennium Park and Paballelo Storm water Master Plan

Pedestrian crossing

Elimination of storm water bottlenecks Upgrade CBD storm water system

Erection of street name signs (old/new developments) Upgrading of parking bays

Speed reducing mechanisms

Construct concrete lining of storm water area TOWN PLANNING AND LAND

MANAGEMENT

Pro-active annual planning & surveying regarding residential, business, industrial, & daily land use needs Solar Geysers

Township establishment Completion of house SEWERAGE AND

SANITATION

Sewerage infrastructure - new town extensions and erven not serviced

Construction of toilet structures in organised informal settlements

Phase out bucket system in the formal residential areas.

Conversion of current dry pit toilets to flush toilets, in surrounding areas

Construction of sewerage network: Solar park Maintenance of VIP and UDS Sanitation facilities Sewerage connection line for housing subsidy project Extension of Louisvale Road- sewerage

Construction of public toilet structures in activity streets Paballelo

Maintenance and replacement of sewerage drain lids ELECTRICITY Electrification projects of new developments.

Bulk infrastructure for new development Annual electrification of farm worker houses Mast lights

High mast lighting at dark areas

57 | P a g e

WATER Provide water on occupied residential sites

Provision of drinking water

Installation of standing taps at organised informal housing Water infrastructure for subsidy sites Water infrastructure for subsidy sites

Bulk Water Infrastructure for new town extensions:

Construct water purification works

Set up tanks, algae treatment & Filters Water works Protection / safe guarding of reservoirs and pump stations FIGHT AGAINST HIV/AIDS Establish mobile clinics

Establish Clinics

Convert Clinic as a day hospital Upgrading of the clinic in

Upgrading of XDR & NDR-TB houses Erect HIV/AIDS Information Bill boards

Convert Gordonia Hospital into a specialised medical care facility

SPORT, PARK AND

RECREATION FACILITIES AND GENERAL APPEARANCE OF TOWNS

Safeguarding of playgrounds.

Lighting of play grounds.

Play apparatus for playgrounds Upgrading of playgrounds

Install benches & bins in parks (Concrete / Timber plastic) Wooden poles to prohibit vehicle entry into parks

Provide Ablution facilities at parks Toilets at parks with pressure taps Establish cemeteries in all communities.

Extension of cemetery sites

Re-open and extend of Kameelmond cemetery Provision of palisade fencing around cemeteries.

Landscaping/Greening of cemeteries Upgrade sports grounds

Concrete palisades at Paballelo stadium (at the back) Paballelo Stadium paving for parking

Irrigation system : Paballelo basketball court Artificial cricket pitch:

Upgrade dressing rooms

Development of street football courts

Development of Multi-purpose in-door sports centre Upgrading of existing park:

Develop new swimming pools

Provide flood / spray lights at swimming pools Develop new sport ground centre

In-door Sports complex:

58 | P a g e

SUFFICIENT HEALTH FACILITIES AND OTHER COMMUNITY SERVICES

Establish satellite Fire Stations in qualifying remote areas.

Provision of underground Fire Hydrants for all new areas Prevention and minimizing alcohol and drug abuse Maintenance, extension and marking of existing Fire Hydrants

Provide Police services within communities and Neighborhood watch

COMMUNICATION AND COMMUNITY FACILITIES

Skills & Development Training centre

Development of Institution centre for persons with special needs

Adequate transport services Increased safety at schools

Establish Early Child Develop Centres:

Rebuild asbestos schools

Develop feeding schemes in Wards

Provide telecommunication systems in informal settlements Make community halls accessible for disabled people Establish Technical Institute of higher learning with Student centre

59 | P a g e

CHAPTER 5: Local Municipality Projects