PORTION OF

Dalam dokumen MATJHABENG LOCAL MUNICIPALITY (Halaman 188-200)

COUNCIL WHIP

4. PORTION OF

KIJKNOU : Electricity Supply to 500

households

13/2 5

Planning Internal Services HS Committed

R17.5 M T.B.C T.B.C T.B.C

189 ITEM

NO.

PROJECT NAME WARD NO.

CURRENT STATUS

COMMENT/

NOTES

PROJECT VALUE

BUDGET 2018/19

BUDGET 2019/20

BUDGET 2020/21 5 ERF 19143 :

Installation of Bulk Services and Internal Services

17 Planning Electricity to be done by Eskom

R1M T.B.C T.B.C T.B.C

6 Portion of Mealie built 146: Installation of Bulk Services to 400 households

28 Planning Internal Services services to be funded by MLM

R310M T.B.C T.B.C T.B.C

7 Lotgeval

96:installment of electrical services and bulk

infrastructure for 4000 Households

27 Planning . Internal

Services – HS – to be negotiated – R140M

Bulk service – MLM/HARMON Y – TO BE DETERMINED

R140M T.B.C T.B.C T.B.C

8 RHEEDER PARK : upgrading of Bulk Services and internal Services for 714 households

35 Planning Electric cable vandalised

R32M T.B.C T.B.C T.B.C

190 ITEM

NO.

PROJECT NAME WARD NO.

CURRENT STATUS

COMMENT/

NOTES

PROJECT VALUE

BUDGET 2018/19

BUDGET 2019/20

BUDGET 2020/21 9 Portion of

Thandanani (thabong x22): Installation of bulk and internal services for 320 households

12 Planning gap markert households

R18,2M

T.B.C T.B.C T.B.C

10 NAUDEVILLE X2:

upgrading of Bulk Services and internal Services

33 Planning Gap Markert households

R14.6M T.B.C T.B.C T.B.C

11 Portion of bothmas rust 152 : wwtw upgrading and uprading of bulk and internal service

28 Planning Middle income – high density – student accommodati on, nurses and doctors

UNFUNDED T.B.C T.B.C T.B.C

12 Welkom airport development

33 PLANNING UNFUNDED

13 Welkom show

grounds development

32 Planning UNFUNDED

14 FLAMINGO PARK X 5: UPGRADING OF ELECTRICAL

27 Large erven

can be

redesigned for

R0.6M T.B.C T.B.C T.B.C

191 ITEM

NO.

PROJECT NAME WARD NO.

CURRENT STATUS

COMMENT/

NOTES

PROJECT VALUE

BUDGET 2018/19

BUDGET 2019/20

BUDGET 2020/21 INFRASTRUCTURE

for 14 units

gap market and middle income 15 Flamingo park x 2:

upgrading of electrical

infrastructure 392 units

27 Large erven

can be

redesigned for gap market and middle income

R18.M T.B.C T.B.C T.B.C

16 FLAMINGO PARK X 3: UPGRADING OF ELECTRICAL and sewer

INFRASTRUCTURE 52 UNITS

27 Large erven

can be

redesigned for gap market and middle large erven can be redesigned for gap market and middle income income

R2.4M T.B.C T.B.C T.B.C

17 FLAMINGO PARK X 4:Installation of Sewer and electrical Infrastructure For 78 UNITS

27 Large erven

can be

redesigned for gap market and middle income

R1.9M T.B.C T.B.C T.B.C

18 Welkom x 17l installation of bulk

27 Old age,

Social

R180M T.B.C T.B.C T.B.C

192 ITEM

NO.

PROJECT NAME WARD NO.

CURRENT STATUS

COMMENT/

NOTES

PROJECT VALUE

BUDGET 2018/19

BUDGET 2019/20

BUDGET 2020/21 services for 1000

units

Housing town houses 19 Welkom

Riebeeckstad extension 1 Norman street: installation of electrical

infrastructure and upgrading of sewer for 120 units

25 Middle and

High Income

R11M T.B.C T.B.C T.B.C

20 WELKOM

RIEBEECKSTAD EXTENSION 1 KOPPIE ALLEEN school; UPGRADING OF SEWER AND BULK SERVICES FOR 78 UNITS:

25 Middle and

High Income

R9m T.B.C T.B.C T.B.C

21 WELKOM

RIEBEECKSTAD EXTENSION 1 LUSETTE

UPGRADING OF ROADS AND BULK

25 Middle and

High Income

R13M T.B.C T.B.C T.B.C

193 ITEM

NO.

PROJECT NAME WARD NO.

CURRENT STATUS

COMMENT/

NOTES

PROJECT VALUE

BUDGET 2018/19

BUDGET 2019/20

BUDGET 2020/21 SERVICES 159

UNITS

22 R/446 (Part of HS project of 7000 : UPGRADING OF BULK SERVICES AND INTERNAL SERVICES FOR 100 UNITS

22 INTERNAL

Services : HS

UNFUNDED T.B.C T.B.C T.B.C

23 Leeuwbosch 285 (part of hs project 0f 7000): installation of bulk infrastructure for 2980 households

22 MASTER

PLANNING

UNFUNDED T.B.C T.B.C T.B.C

24 Leeubosch 285 (remainding portion):

installation of bulk infrastructure for 6057 households

36 MASTER

PLANNING

UNFUNDED T.B.C T.B.C T.B.C

25 ELDORIE:

UPGRADING OF BULK SERVICES AND

INSTALLATIONOF LECTRICAL

36 R16.3M T.B.C T.B.C T.B.C

194 ITEM

NO.

PROJECT NAME WARD NO.

CURRENT STATUS

COMMENT/

NOTES

PROJECT VALUE

BUDGET 2018/19

BUDGET 2019/20

BUDGET 2020/21 INFRASTRUCTURE

for 356 HUSEHOLDS 26 VENTERSBURG X6

upgrading of 62 households

1 Planning Electrical infrastructure to be

upgraded

R5.3M T.B.C T.B.C T.B.C

27 Virginia extension 10 – Kitty Phase 2 (Upgrading of 178 households

Planning WWTW/Elect ricity to be upgraded.

Internal Services not available

10.9M T.B.C T.B.C T.B.C

28 Virginia – Saaiplaas:

Upgrading of 361 households

Planning Road

Construction and

Upgrade.

Electricity upgrading No Internal Services

28M T.B.C T.B.C T.B.C

29 Phomolong:

ventersvlakte 740:

installation of bulk services for bulk infrastructure.

2/3 MASTER

PLANNING

UNFUNDED T.B.C T.B.C T.B.C

195 ITEM

NO.

PROJECT NAME WARD NO.

CURRENT STATUS

COMMENT/

NOTES

PROJECT VALUE

BUDGET 2018/19

BUDGET 2019/20

BUDGET 2020/21 30 Phomolong:

ventersvlakte 740.:

installation of bulk and internal services for 4510 on the remaining portions

2/3 BULK

SERVICES BUGET TO TO BE DETERMINE D

Internal Services :

R5M

T.B.C T.B.C T.B.C

31 HENNENMAN:

INSTALLATION OF BULK ,INTERNAL SERVICES AND UPGRADING OF ROADS

3 R22M T.B.C T.B.C T.B.C

32 Ventersburg x5 remainder of Schoonheid 540 (private ownership) upgrading of 3014 households

1 Planning Electrical infrastructure to be upgraded

R5.3M T.B.C T.B.C T.B.C

33 Virginia extension 10 – kittyPhase 1 : Upgrading of 237 households

Planning Electrical / WWTW/ROADS infrastructure to be upgraded

R2.8M T.B.C T.B.C T.B.C

196 6.4 INFRASTRUCTURE ASSET MAINTENANCE PROGRAMMES ITEM

NO.

PROJECT NAME WARD NO.

CURRENT STATUS

COMMENT/

NOTES

PROJECT VALUE

BUDGET 2018/19

BUDGET 2019/20

BUDGET 2020/21 WATER SERVICES

Installation of water meters on areas without any and replacement of all dysfunctional water meters

All Planning Water Demand to reduce water loss and

unaccounted-for water.

R3 000 000 R 3 000 000 R 3 000 000 R 3 000 000

Install water meters at developed parks and communal stand pipes.

All Implementati on

Water Demand to reduce water loss and

unaccounted for water.

R 500 000 R 500 0000

Replacement of non- functional and worn-out Valves and hydrants

All Planning Water Demand to reduce water loss

R 5 000 000 R 1 000 000 R 1 000 000 R 1 000 000

Conduct leak detection investigation and analysis to determine priority list and develop water loss monitoring database.

All Planning Water Demand to reduce water loss

R 4 000 000 R 4 000 000

Implement leak detection system and equipment

All Planning Water Demand to reduce water loss

R10 000 000 R 2 000 000 R 2 000 000 R 2 000 000

197 ITEM

NO.

PROJECT NAME WARD NO.

CURRENT STATUS

COMMENT/

NOTES

PROJECT VALUE

BUDGET 2018/19

BUDGET 2019/20

BUDGET 2020/21 SANITATION SERVICES

Virginia Industrial Area outfall sewer upgrade

9 Designed

internal

R 2 000 000 R 2 000 000

WASTEWATER TREATMENT PLANTS AND PUMPSTATION Cleaning of sumps in

Pump Stations as and when needed

(Term-Contracts)

All O&M

Planning R 5 000 000 R 1 000 000 R 1 000 000

R 1 000 000

ROADS AND STORMWATER Repair or replace

damaged and stolen catch pit and manhole lids

All O&M R10 000

000

R 1 500 000 R 1 500 000 R 1 500 000

Upgrade catch pits with limited capacity to enhance storm water functionality.

All O&M R 4 000 000 R 1 000 000 R 1 000 000 R 1 000 000

Crack sealing of roads to prevent water seepage into base layers and extend life expectancy (Km)

All Planning R 21 000 000 R 7 000 000 R 7 000 000 R 7 000 000

198 ITEM

NO.

PROJECT NAME WARD NO.

CURRENT STATUS

COMMENT/

NOTES

PROJECT VALUE

BUDGET 2018/19

BUDGET 2019/20

BUDGET 2020/21 Repair potholes in

formal roads to reduce deterioration and ensure safe usage thereof (m2).

All O&M R25 000 000 R5 000 000 R5 000 000 R5 000 000

Resealing of roads of roads

All O&M R225 000 000 R45 000 000 R45 000 000 R45 000 000

Gravelling of Roads All O&M R25 000 000 R5 000 000 R5 000 000 R5 000 000

Cleaning of lined storm water canals in the whole of Matjhabeng once a year.

All O&M R 4 000 000 R 800 000 R 800 000 R 800 000

Cleaning of unlined storm water canals in Matjhabeng twice a year.

All O&M R 6 000 000 R 1 200 000 R 1 200 000 R 1 200 000

Cleaning and

maintenance of existing storm water drainage pipes (Operational)

35,36 O&M R 13 000 000 R 2 600 000 R 2 600 000 R 2 600 000

199 ITEM

NO.

PROJECT NAME WARD NO.

CURRENT STATUS

COMMENT/

NOTES

PROJECT VALUE

BUDGET 2018/19

BUDGET 2019/20

BUDGET 2020/21 ELECTRICITY

WELKOM

Upgrading breakers and isolators 132KV

reticulation

32 Planning To ensure an effective and safe 132kV Distribution network

R 1 097 551 R 658 790 R 438 761

WELKOM Main intake test, upgrade and repairs to 132KV

32 Planning To ensure an effective and safe 132kV Distribution network

R 756 484 R 479 120 R 277 364

ELECTRICAL ADMINISTRATION AND STRATEGIC PLANNING HENNENMAN

Upgrading of load control

3 Planning Council

benefiting from the time of use tariffs

R 988 185 R 988 185

ODENDAALSRUS Upgrading of load control

1 Planning Council

benefiting from the time of use tariffs

R 131 758 R 31 758

VIRGINIA

Upgrading of load control system Virginia

9 Planning Council

benefiting from the time of use tariffs

R 263 516 R 263 516