Access to Water

3.5 ROADS

INTRODUCTION TO ROADS

The municipality has a backlog of 200 kilometers of roads that require upgrading, however the municipality has only managed to upgrade 2Kms in the 2012/2013 FY. This project was funded by the Provincial Department of Public Works and was implemented in Mokwallo (1km) and Tumahole(1km) townships.

Below is a list of projects which are to be executed and completed in the 2013/2014 finacial year:

Koppies: Paving of internal roads 1 km - The project includes construction of a 1km access road with interlocking paving blocks, concrete kerbs and provision of storm water via open channels. Edenville: Paving of

internal roads 1 km The project includes construction of a 1km access road with interlocking paving blocks, concrete kerbs and provision of storm water via open channels.

Municipality | CHAPTER 3 – SERVICE DELIVERY PERFORMANCE (PERFORMANCE REPORT PART I) 92 Capital Expenditure Year 0: Road Services

R' 000

Capital Projects

Year 2013/2014 Budget Adjustment

Budget

Actual Expenditure

Variance from original

budget

Total Project Value

Total All R 13 117902.70 R 0 R 0 0%

R 13 117902.700

Paving of internal

roads in Koppies 1km R6 558 951.35 R 0 R0 0% R6 558 951.35

Paving of internal roads in Edenville

1km R6 558 951.35 R 0 R0 0% R6 558 951.35

Total project value represents the estimated cost of the project on approval by council (including past and future expenditure as appropriate).

Municipality | CHAPTER 3 – SERVICE DELIVERY PERFORMANCE (PERFORMANCE REPORT PART I) 93 Road Service Policy Objectives Taken From IDP

Service Objectives Outline Service Targets Year -1 Year 0 Year 1 Year 3

Target Actual Target Actual Target

Service Indicators *Previous

Year

*Previous

Year *Current Year

*Current

Year *Current

Year *Following Year

(i) (ii) (iii) (iv) (v) (vi) (vii) (viii) (ix) (x)

Service Objective To provide continuous maintenance and upgrading of all tar, gravel and un- surfaced roads and storm water networks to keep them in a trafficable condition and to accommodate heavy vehicle transport where required in all urban and rural areas.

Rehabilitation of the tarred roads in Parys

Upgrade of 1 km gravel road

to pave in Koppies Paving

of internal roads in Koppies 1km.

Consultant and Contractor appointed

Upgrade of 1 km gravel road to pave in Edenville

Paving of internal roads in Edenville 1 km

Consultant and Contractor appointed

94 Employees: Road Services

Job Level

Year -1 Year 0

Employees Posts Employees Vacancies (fulltime

equivalents) Vacancies (as a % of total posts)

No. No. No. No. %

0 - 3 0 0 0

4 - 6 1 1 0

7 - 9 1 1 0

10 - 12 15 15 0

13 - 15 2 2 0

16 - 18 17 17 0

19 - 20 0 0 0

Total 36 36 0

T3.7.7

COMMENT ON THE PERFORMANCE OF ROADS OVERAL:

PLS: See the Attached spread sheet Format Below

T3.7.10

95 Project Number Project Description Status Total Project Cost MIG Budget Total expenditure

to date (current)

Expenditure Balance

MIG/FS0714/W/09/09 Paving of internal roads in Koppies 1km.

Consultant and Contractor appointed

R6 558 951.35

R6 558 951.35 R 0 R0

MIG/FS0954/R,ST/13/14 Paving of internal roads in Edenville 1 km

Consultant and Contractor appointed

R6 558 951.35 R6 558 951.35 R 0 R0

COMMENT ON THE PERFORMANCE OF ROADS AND STORMWATER DRAINAGE OVERALL:

We have done gravel road maintenance in all towns during the financial year. The challenge was that the municipally had to hire road construction plant which was used in the maintenance because the municipality does not have the necessary plant.

We also have a significant challenge with potholes, this problem was not addressed as there was no funding to do this.

Municipality | CHAPTER 3 – SERVICE DELIVERY PERFORMANCE (PERFORMANCE REPORT PART I) 96 3.6 FREE BASIC SERVICES AND INDIGENT SUPPORT

INTRODUCTION TO FREE BASIC SERVICES AND INDIGENT SUPPORT

The municipality has an indigent policy as approved by the Council. The policy ensures that it households who cannot afford to pay for municipal services do benefit as well from municipal services. The poor communities will be able to use money for other basic needs like food, etc. The determining threshold for 2012/2013 was the total household income not exceeding R2 040.00 per month. However the municipality does not provide alternative energy

Free Basic Services To Low Income Households

Number of households Total

Households earning less than R1,900 per month Free Basic

Water

Free Basic Sanitation

Free Basic Electricity

Free Basic Refuse

Total Access % Access % Access % Access %

2010-

2011 36 292

15

370 13 515 100% 9 823 73% 10 515 78% 13 515 100%

2011-

2012 37 339

16

519 13 885 90% 13 885 90% 15 370 100% 13 885 90%

2012-

2013 37 339

16

519 16 519 100% 15 942 97% 16 519 100% 15 942 97%

COMMENT ON THE FREE BASIC SERVICES AND INDIGENT SUPPORT

Electricity: The total number of indigents provided was about 16 519. The municipality is providing indigent households with 50KhW on electricity per month. However there is a small number of household who continue to illegally bridge meters citing unemployment as the major reason. Non Indigents households on the other hand are receiving 15k

Water: The total number of indigents provided was about 16 519. The municipality is using a broad-based approach on all households by providing 6kl per household on water per month. However there were still broken meters that need replacement. Non Indigents are also provided with the same 6kl per household per month.

Sanitation: The total number of indigents provided was about 15 942 with a backlog of about 577 households.

T

97 Refuse: The total number of indigents provided was about 15 942with a backlogs of about 577 households.

There were no refuse bins as well as shortage of heavy equipment.

Municipality | CHAPTER 3 – SERVICE DELIVERY PERFORMANCE (PERFORMANCE REPORT PART I) 98 COMPONENT C: PLANNING AND DEVELOPMENT

This component includes: planning; and local economic development.

INTRODUCTION TO PLANNING AND DEVELOPMENT

Planning and economic units are housed within Community Services Directorate, The units is tasked with among other areas of responsibility to facilitate the provision of a acceptable safe and equity housing, to ensure that land accessibility future development benefits both residents and the municipality in terms of the SPLUMA,Economic development section on the other hand facilitates availability of economic opportunities to all the residents.

T 3.10