Urban Management Capital Funding

Institutional Arrangements & Operations Budgeting R ep or tin g & E va lu at io n

Spatial

Planning Intergovernmental Implementation

project pipeline

The BEVC is the BE part of the Strategic

Intervention Logic

(3)

Spatial Urban Network IZ Precinct Economic

Nodes

Project Project Prioritisation Identification and Prioritisation

SPATIAL PLANNING INTERGOVERNMENTAL

PROJECT PIPELINE

BEPP Guidelines on Spatial Planning

2 3 1

TRANSPORT PLANNING

(4)

Spatial Targeting Evaluation Criteria

• Integration Zone Structure – UN elements

• Integration Zone Extent – 2km width

– Smart Urbanism/ToD/Walk-able neighbourhood concept

• Integration Zone Prioritisation

– Township population served by Urban Hub

Capital prioritisation

Spatial budgeting alignment with spatial targeting

Overall spatial targeting approach

Single approach aligned to UNS vs. multiple planning approaches for each purpose, i.e. BEPP, IDP/SDF, GDS.

4

(5)

IZ Evaluation: 16/17

  Structure Extent Prioritisation

No 1

eThekwini Ekurhuleni

NMB CoT CoCT BCM

Ekurhuleni CoT NMB

No 2 NMB

CoCT BCM CoJ

No 3

BCM CoT

CoCT

(6)

Overall Spatial Targeting Evaluation

6

  14/15 15/16 16/17

No 1 Ekurhuleni CoCT CoT

Ekurhuleni

CoT NMB

No 2 NMB

BCM CoCT Ekurhuleni

No 3 eThekwini NMB

BCM

CoCT CoT

BCM

(7)

IZ profile Spatial Logic

URBAN NETWORK PLANNING

INTEGRATION ZONE PLANNING

Precinct Identification

IZ Project Identification

Precinct Prioritisation

Precinct Targets:

• Residential

• Social

• Employment Draft Spatial

Logic

IZ Targets:

• Residential

• Social

• Employment

• Transport Primary

Network Secondary

Network

Prioritised Integration Zones

INTEGRATION ZONE PLANNING