2
Urban Management Capital Funding
Institutional Arrangements & Operations Budgeting R ep or tin g & E va lu at io n
Spatial
Planning Intergovernmental Implementation
project pipeline
The BEVC is the BE part of the Strategic
Intervention Logic
Spatial Urban Network IZ Precinct Economic
Nodes
Project Project Prioritisation Identification and Prioritisation
SPATIAL PLANNING INTERGOVERNMENTAL
PROJECT PIPELINE
BEPP Guidelines on Spatial Planning
2 3 1
TRANSPORT PLANNING
Spatial Targeting Evaluation Criteria
• Integration Zone Structure – UN elements
• Integration Zone Extent – 2km width
– Smart Urbanism/ToD/Walk-able neighbourhood concept
• Integration Zone Prioritisation
– Township population served by Urban Hub
• Capital prioritisation
– Spatial budgeting alignment with spatial targeting
• Overall spatial targeting approach
– Single approach aligned to UNS vs. multiple planning approaches for each purpose, i.e. BEPP, IDP/SDF, GDS.
4
IZ Evaluation: 16/17
Structure Extent Prioritisation
No 1
eThekwini Ekurhuleni
NMB CoT CoCT BCM
Ekurhuleni CoT NMB
No 2 NMB
CoCT BCM CoJ
No 3
BCM CoT
CoCT
Overall Spatial Targeting Evaluation
6
14/15 15/16 16/17
No 1 Ekurhuleni CoCT CoT
Ekurhuleni
CoT NMB
No 2 NMB
BCM CoCT Ekurhuleni
No 3 eThekwini NMB
BCM
CoCT CoT
BCM
IZ profile Spatial Logic
URBAN NETWORK PLANNING
INTEGRATION ZONE PLANNING
Precinct Identification
IZ Project Identification
Precinct Prioritisation
Precinct Targets:
• Residential
• Social
• Employment Draft Spatial
Logic
IZ Targets:
• Residential
• Social
• Employment
• Transport Primary
Network Secondary
Network
Prioritised Integration Zones