Q1 Q2 Q3 Q4 Departme
nt Annual Budget Portfolio of Evidence
Target Target Target Target
301 All No. of Ward Committee meetings 88 meetings 30-Jun-16 22 Meetings 22 Meetings 22 Meetings 22 Meetings Minutes and Attendance Registers
302 All No. of Combined Local Ward
Committee meetings (Ingwe) 4 Meetings 30-Jun-16 1 Meeting 1 Meeting 1 (Annual report hearing) 1 meeting Minutes and Attendance Registers
303 All Capacity of Ward Committees No. of training sessions 3 Training sessions 30-Jun-16 1 2 Not Applicable Not Applicable R 351 583 Appointment letter of service Provider and attendance
register
304 All Operation Sukuma Sakhe No. of War room meetings 8 meetings 30-Jun-16 2 Meetings Attended 2 Meetings Attended 2 Meetings Attended 2 Meetings Attended Operational Minutes and Attendance Registers
8 meertings attended bu LED unit
305 All Community Based Planning
(CBP) No. of CBP reviewed attended by
LED unit 11 CBPs reviewed 30-Jun-16 3 CBPs reviwed 2 CBPs reviwed 3 CBPs reviwed 3 CBPs reviwed R 110 000 11 Reviewed Community Based Plans
306 All Disaster risk management
response and recovery Report be produced and submitted to
District within 3 days 3 days Annually Reports on Responses
307 All Community risk avoidance
capacity building No. of Risk Avoidance workshops
conducted 2 Roadshow
Workshops 30-Jun-16 Not Applicable 1 Roadshow Not Applicable 1 Roadshow Reports and Copies of Invoices
308 11 Fire Unit A resourced fire unit
(assets, equipement and staff) 30-Jun-16 30-Jun-16 Identify space, facilitate training of
interns Identify donors and conduct
presentations Not Applicable Staffed and resourced unit Operational Business Plans and Presentation Minutes
309 All Multi disciplinary road blocks No. of multi-disciplinary road blocks participated in for the year 2 road blocks 30-Jun-16 Not Applicable 1 road block for Festive Season
busy period 1 road block during Easter Period Not Applicable Operational Roadblock Reports/ OB Reports/ Section 56 Notices Issued
310 All Local Road Blocks No. of local road blocks participated
in for the year 48 road blocks 30-Jun-16 12 road blocks 12 road blocks 12 road blocks 12 road blocks Operational Roadblock Reports/ OB Reports/ Section 56 Notices
Issued
311 N/A Ingwe Community
Participation strategy Approved strategy 30-Jun-16 30-Jun-16 Approved strategy Not Applicable Not Applicable Approved strategy Operational Council resolution adopting approved strategy
312 N/A No. of inspections conducted 12 inpections 30-Jun-16 3 Inspections conducted 3 Inspections conducted 3 Inspections conducted 3 Inspections conducted Operational 12 Inspections Reports
313 N/A Report on by laws compliance in
Ingwe 4 quarterly reports 30-Jun-16 1st Quarter Report presented to
MANCO 2nd Quarter Report presented to
MANCO 3rd Quarter Report presented to
MANCO 4th Quarter Report presented to MANCO Operational 4 Inspections Reports and MANCO Minutes
314 N/A Fire arms control Act Refresher training sessions for peace
officers 2 fire arm training
sessions 30-Jun-16 1 Training Session Not Applicable 1 Training Session Not Applicable Operational Training Reports
315 N/A Attendance of all Community Safety
Forum meetings invited to 4 Quarterly
Meetings 30-Jun-16 1 Meeting 1 Meeting 1 Meeting 1 meeting Operational Minutes and Attendance Registers
316 N/A Attendance of all Provincial Traffic
Meetings invited to 4 Quarterly
Meetings 30-Jun-16 1 Meeting 1 Meeting 1 Meeting 1 meeting Operational Minutes and Attendance Registers
317 11 Animal Pound Management Report on Pound Functioning 12 monthly reports 30-Jun-16 3 Reports presented to MANCO 3 Reports presented to MANCO 3 Reports presented to MANCO 3 Reports presented to MANCO R 288 461 Reports and Copies of Invoices
318 N/A Library Services Community outreach programmes
conducted 16 Outreach
programmes 30-Jun-16 4 Outreach Programmes
Conducted 4 Outreach Programmes
Conducted 4 Outreach Programmes
Conducted 4 Outreach Programmes Conducted R 38 461 Reports and MANCO Minutes
319 All Poverty Alleviation No. of Community projects supported 22 Community
project 30-Jun-16 Not Applicable 11 projects supported Not Applicable 11 projects supported R 336 538 Reports and Copies of Invoices
320 All No. of SMME's supported with
training 50 (people) SMME's 30-Jun-16 Not Applicable 25 (people) SMME's 25 (people) SMME's Not Applicable Reports, attendance register and Copies of Invoices
321 All Approved SMME and Co-op plan Not Applicable Draft Plan presented to MANCO
for Council Adoption Not Applicable Not Applicable Approved Policy, Council Minutes and Copies of
Invoices
322 All No. of cultural events held 3 events 30-Jun-16 2 Events held 1 Event held Not Applicable Not Applicable R 430 000 Umkhosi Womhlanga 350 Umkhosi Welembe 30
Umkhosi Wezintombi HG 50 Reports, Attendance Registers and copies of invoices
323 All Arts and Culture Competition Not Applicable Not Applicable Not Applicable ILM Arts and culture event R 260 000Performing Arts Prizes 80, Catering 60, Transport 120
= 260 Reports, Attendance Registers and copies of invoices
324 All No. of crafters supported with training
and material 22 crafters
supported 30-Jun-16 Not Applicable 11 Crafters Supported Not Applicable 11 Crafters Supported R 60 000 Reports, Attendance Registers and copies of invoices
325 SALGA GAMES Not Applicable Number of sports codes attend
games Not Applicable Not Applicable R 300 000 Reports, Attendance Registers and copies of invoices
326 Kilmon Horse Race /Dundee July Quartly progress report Quartly progress report Quartly progress report Quartly progress report R 121 153 Reports, Undertakings by sponsors and copies of
invoices
327 All No. of codes and sports supported 10 codes 30-Jun-16 Not Applicable 7 Supported 3 Supported Not Applicable R 300 000 Reports, list of federations and copies of invoices
328 N/A Sports Develepopment Concept Not Applicable Draft concept Presented to
MANCO Consultation with stekeholders Concept form the basis of a Sports Development
Plan to be developed Operational Minutes and Attendance Registers of steakholder consultation and concept plan
329 Donnybrook community
project Creation of job oportunities for
beneficiaries 10 beneficiaries 30-Jun-16 Copletion of phase 1 of Kevelaer
Fencing Manufacturers Project Establishment of Funuture
Manufacturing Project Phase II of Project. Expanding of
project Phase II of Project. Expanding of project
continued R 196 153 Reports and Copies of Invoices
330 N/A Aloe Festival / Rail Tourism ILM Event held ILM Aloe event Not Applicable Not Applicable Not Applicable R 76 923 Reports, Attendance Report (Number of tickets sold)
and copies of invoices
331 N/A LED / Sector Specific Forums No. of forum meetings held 2 meetings 30-Jun-16 Not Applicable 1 Sector Specific Meeting held Not Applicable 1 Sector Specific Meeting held Operational Minutes and Attendance Registers
332 All Business licences Business licences Issued Operational Issued Business licences
333 All Create Jobs through LED
Projects No. of jobs created 50 jobs created 30-Jun-16 Not Applicable 25 jobs created Not Applicable 25 jobs created Operational Reports and Jobs created
scorecaOrg rd ref no.
National KPA STRATEGIC
OBJECTIVE
INGWE Organisational Scorecard and SDBIP FOR 2015 - 2016 COMMUNITY SERVICES DEPARTMENT
Loc al E con om ic a nd S oc ial D ev elo pm ent
Annual
Target
Public Participation Ward
C om m un ity W or k P rog ra m m e I m ple m ent ed a nd C oo pe ra tiv es S up po rte d To im pro ve a cc oun ta bi lity an d e nha nc e p ub lic p art icip atio n To diversify e cono mic opp ortu nities
20 working daus ti issue business licences from date of complete application lodged.
30-Dec-15 Ward Committee Functioning
Community Safety Forum and Provincial Traffic Meetings
Turnaround time when issuing business licences OUTCOME 9
Seek to find a Sponsor to contribute toward Kilmon Horse Race
R 144 230
By-laws enforcement
COMMUNITY SERVICES
PROJECTS INDICATORS
R 320 000
15th June 2016 SMME Development
R 865 384
31-Jul-15
Dependant on the eventuality of incidents reported
Promote Arts Sports &
Recreation
30-Jun-16 Sports Development
Number of participating sports cpodes
IDP Ref No. INDICATOR No. Q1 Q2 Q3 Q4 Responsible
Department Annual Budget Adjusted
Budget Portfolio of Evidence
Target Target Target Target
201 1 2.1.1 Thonsini Access Road 1 No of kilometers
constructed 2km 30-Jun-16
Appointment of Service Provider POE:(Contractors appointment letter)
Establishment and road formation done. Earthworks,
storm water drainage and road bed preparation
completed.
POE:(Progress report signed by Engineer and designated
municipal official)
Tipping and processing completed POE:(Progress report signed by Engineer and
designated municipal official)
Completed Road complete with road
signs POE:(Progress report
signed by Engineer and designated municipal
official)
IPD R1 950 000.00
Completion Certificate by
Registered Engineer
202 3 Inos Access Road 2 No of kilometers
constructed 1.6km 30-Jun-16
Appointment of Service Provider POE:(Contractors appointment letter)
Establishment and road formation done. Earthworks,
storm water drainage and road bed preparation completed POE:(Progress
report signed by Engineer and/or designated municipal
official)
Tipping and processing completed POE:(Progress report
signed by Engineer and/or designated municipal official)
Road complete with road signs POE:(Progress report
signed by Engineer and/or designated municipal official)
IPD R1 560 000.00
Completion Certificate by
Registered Engineer
203 4 Shusha Access Road 3 No of kilometers
constructed 1.6km 30-Jun-16
Appointment of Service Provider POE:(Contractors appointment letter)
Establishment and road formation done. Earthworks,
storm water drainage and road bed preparation completed POE:(Progress
report signed by Engineer and/ or designated municipal
official)
Tipping and processing completed POE:(Progress report
signed by Engineer and/or designated municipal official)
Road complete with road signs POE:(Progress report
signed by Engineer and/or designated municipal official)
IPD R1 267 500.00
Completion Certificate by
Registered Engineer
204 7 Mvuleni-sexule
pedestrian bridge 4 No of kilometers
constructed No of Kms 30-Jun-16 Appointment of Service
ProviderPOE:(Contract ors appointment letter)
Establishment and Earthworks (Progress report
signed by Engineer and/or designated municipal official)
Completed slab :(Progress report signed
by Engineer and/or designated municipal
official)
Completed Bridge POE:(Progress report
signed by Engineer and/or designated municipal official)
IPD R2 700 000.00
Completion Certificate by
Registered Engineer
205 8 Voyizana Access
Road 5 No of kilometers
constructed 1.5km 30-Jun-16
Appointment of Service Provider POE:(Contractors appointment letter)
Establishment and road formation done. Earthworks,
storm water drainage and road bed preparation completed POE:(Progress
report signed by Engineer and/or designated municipal
official)
Tipping and processing completed POE:(Progress report
signed by Engineer and/or designated municipal official)
Road complete with road signs POE:(Progress report
signed by Engineer and/or designated municipal official)
IPD R1 462 500.00
Completion Certificate by
Registered Engineer
206 10 Sindawonye Access
Road 6 No of kilometers
constructed 0.7km 30-Jun-16
Appointment of Service Provider POE:(Contractors appointment letter)
Establishment and road formation done. Earthworks,
storm water drainage and road bed preparation completed POE:(Progress
report signed by Engineer and/or designated municipal
official)
Tipping and processing completed POE:(Progress report
signed by Engineer and/or designated municipal official)
Road complete with road signs POE:(Progress report
signed by Engineer and/or designated municipal official)
IPD R682 500.00
Completion Certificate by
Registered Engineer
207 11 Creighton Asphalt
Surfacing Phase 4 7 No of kilometers
constructed 1.5km 30-Jun-16
Appointment of Service Provider POE:(Contractors appointment letter)
Establishment and road formation done. Earthworks,
storm water drainage and road bed preparation completed POE:(Progress
report signed by Engineer and/or designated municipal
official)
Tipping and processing completed POE:(Progress report
signed by Engineer and/or designated municipal official)
Complete with premix and surfacing, 1.5km
complete POE:(Progress report
signed by Engineer and/or designated municipal official)
IPD R4 411 764.71
Completion Certificate by
Registered Engineer
208 9 Bulwer Asphalt
Surfacing phase 4 8 No of kilometers
constructed 1.5km 30-Jun-16
Appointment of Service Provider POE:(Contractors appointment letter)
Establishment and road formation done. Earthworks,
storm water drainage and road bed preparation completed POE:(Progress
report signed by Engineer and/or designated municipal
official)
Tipping and processing completed POE:(Progress report
signed by Engineer and/or designated municipal official)
Complete with premix and surfacing, 1.5km
complete POE:(Progress report
signed by Engineer and/or designated municipal official)
IPD R4 411 764.71
Completion Certificate by
Registered Engineer
210 All Road Maintenance of
Memela, Nkompolo,
Mjila Access Roads 10 no of kilometers
maintained 4km 30-Jun-16 1 Kilometer maintained 1 Kilometer maintained 1km maintaned 1km maintained IPD R1 470 588.24 Report and
Completion Certificate Target
Roads
Basic Service
Delivery Improved Access to Basic Services
To unlock access to economic opportunities, social services
and facilitate additional infrastructure
provision
INGWE SDBIP FOR 2015 - 2016 INFRASTRUCTURE, PLANNING AND DEVELOPMENT IDP / SDBIP
NO. Ward National KPA OUTCOME 9 STRATEGIC
OBJECTIVES PROJECTS INDICATORS BASELINE Annual
211 5,11&4 Railway line
Maintenace 11 no of kilometers
maintained 55km 30-Jun-16 Not Applicable Not Applicable
Appointment of Service Provider POE:(Contractors appointment letter)
Railway Line Maintenance Complete
POE:(Progress report signed by designated
municipal official)
IPD R294 117.65 Report and
Completion Certificate
218 2 Electrification of
(Ward 2) 18 No of house hold
connected 1400 30-Jun-16
SCM Processes and Appointment of Service
Provider POE:(Contractors appointment letter)
Planting of Poles (MV & LV) POE:(Progress report signed
by Engineer and/or designated municipal official)
Stringing of lines (MV &
LV) POE:(Progress report
signed by Engineer and/ordesignated municipal official)
Houses connected POE:(Progress report
signed by Engineer and/or designated municipal official)
IPD
Completion Certificate by
Registered Engineer
8 Electrification of (ward
8) No of house hold
connected 20 30-Jun-16
SCM Processes and Appointment of Service
Provider POE:(Contractors appointment letter)
Planting of Poles (MV & LV) POE:(Progress report signed by Engineer and designated
municipal official)
Planting of Poles (MV &
LV) Stringing of lines (MV & LV) POE:(Progress report signed by Engineer and
designated municipal official)
Houses connected POE:(Progress report signed by Engineer and
designated municipal official)
IPD
Completion Certificate by
Registered Engineer
220 2 Greater
Mpumulwane/Khukhul
ela 20 No of house hold
connected 1400 30-Jun-16
SCM Processes and Appointment of Service
Provider POE:(Contractors appointment letter)
Planting of Poles (MV & LV) POE:(Progress report signed by Engineer and designated
municipal official)
Planting of Poles (MV &
LV) Stringing of lines (MV & LV) POE:(Progress report signed by Engineer and
designated municipal official)
Houses connected POE:(Progress report signed by Engineer and
designated municipal official)
IPD R 15 000 000.00
Completion Certificate by
Registered Engineer
221 2 Bulwer Community
Services Center 21 Completion
Certificate
SCM Processes and Appointment of Service ProviderPOE:(Contract ors appointment letter)
Establishment, Earthworks, and foundations completed POE:(Progress report signed
by Engineer and designated municipal official)
Casting of slab and installation for structural
steel completed POE:(Progress report signed by Engineer and
designated municipal official)
Wall Plate and Finishings POE:(Progress report signed by Engineer and
designated municipal official)
IPD R 7 500 000.00
Completion Certificate by
Registered Engineer
228 2 Centocow Taxi Rank
and Public
Toilets(phase 1) 28
SCM Processes and Appointment of Service
Provider POE:(Consultants appointment letter)
Designs Completed and Bid Document POE:(Progress report signed
by Engineer and designated municipal official and Copy of Layout Plan as well as Bid
document)
SCM Processes and Appointment of Service
Provider POE:(Contractor appointment letter)
Establishment on site, earthworks, foundations, Wall Plate
and Finishings POE:(Progress report signed by Engineer and
designated municipal official)
IPD R 1 000 000.00 Completion
Certificate
229 11 Bulwer Taxi Rank Car
Wash 29 completed car
wash facility in Bulwer
SCM Processes and Appointment of Service
Provider POE:(Contractors appointment letter)
Establishment, Earthworks, and foundations completed POE:(Progress report signed
by designated municipal official)
Casting of slab and installation for structural
steel, drainage and
finishes completed.
POE:(Progress report signed by designated
municipal official)
Not applicable IPD R 350 000.00 Completion
Certificate
230 11 2.4.1
Repairs and Maintenance of Municipal Building (Lot 87 Creighton Municipal House, no3 Smith Street Municipal House, Lot 68 Creighton, Bulwer Hall, Creighton Hall, 5x Rural halls Creighton stores)
30 Number of
buildings
renovated 12 30-Jun-16 Needs Analysis Appointment of Service
Provider Appointment of Service
Provider Bulwer Hall, Main
Buiding, 3 Properties IPD R 5 964 215.69 Completion
Certificate
231 2 Mwaneni Sportsfield 31 Complete Sports
field with all
relavent facilities 1 30-Jun-16
SCM Processes and Appointment of Service
Provider POE:(Contractors appointment letter)
Earthworks POE:(Progress report signed
by Engineer and designated municipal official)
Grassing, Fencing, Ablutions and change
rooms POE:(Progress report signed by Engineer and
designated municipal official)
Finishes POE:(Progress report
signed by Engineer and designated municipal
official)
IPD R 3 000 000.00
Completion Certificate by
Registered Engineer
232 5 Kevelear/Donnybrook
Sportsfield 32 Complete Sports
field with all
relavent facilities 1 30-Jun-16
SCM Processes and Appointment of Service
Provider POE:(Contractors appointment letter)
Earthworks POE:(Progress report signed
by Engineer and designated municipal official)
Grassing, Fencing, Ablutions and change
rooms POE:(Progress report signed by Engineer and
designated municipal official)
Finishes POE:(Progress report
signed by Engineer and designated municipal
official)
IPD R 3 000 000.00
Completion Certificate by
Registered Engineer Sportsfields
Community Amenities
Basic Service
Delivery Improved Access to Basic Services
To construct community recreational amenities
2.3.1
30-Jun-16
30-Jun-16
30-Jun-16 Electrification
R 20 000 000.00
2.4.1
6 Makawusane Sports Field
Complete Sports field with all
relavent facilities 1 30-Jun-16
SCM Processes and Appointment of Service
Provider POE:(Contractors appointment letter)
Earthworks POE:(Progress report signed
by Engineer and designated municipal official)
Grassing, Fencing, Ablutions and change
rooms POE:(Progress report signed by Engineer and
designated municipal official)
Finishes POE:(Progress report
signed by Engineer and designated municipal
official)
IPD R 3 000 000.00
Completion Certificate by
Registered Engineer
9 Nkwezela Sports field
Phase 2
Complete Sports field with all
relavent facilities 1 30-Jun-16
SCM Processes and Appointment of Service
Provider POE:(Contractors appointment letter)
Earthworks POE:(Progress report signed
by Engineer and designated municipal official)
Grassing, Fencing, Ablutions and change
rooms POE:(Progress report signed by Engineer and
designated municipal official)
Finishes POE:(Progress report
signed by Engineer and designated municipal
official)
IPD R 2 900 000.00
Completion Certificate by
Registered Engineer
233 11 Mjila Sportsfield 33 Complete Sports
field with all
relavent facilities 1 30-Jun-16
SCM Processes and Appointment of Service
Provider POE:(Contractors appointment letter)
Earthworks POE:(Progress report signed
by Engineer and designated municipal official)
Grassing, Fencing, Ablutions and change
rooms POE:(Progress report signed by Engineer and
designated municipal official)
Finishes POE:(Progress report
signed by Engineer and designated municipal
official)
IPD R 3 000 000.00
Completion Certificate by
Registered Engineer
234 11
Fencing ( Creighton Cemetry, Kilmon Taxi Rank, Nkwezela Sports field, Bulwer Taxi Rank, Bulwer Hall and Library and Donnybrook cemetry)
34 number of
kilometers
fenced 1km 30-Jun-16
SCM Processes and Appointment of Service
Provider POE:(Contractors appointment letter)
500m Fencing POE:(Progress report signed
by designated municipal official)
1000m Fencing POE:(Progress report
signed by designated municipal official)
Not Applicable IPD R 1 176 470.59 Completion
Certificate
Fencing of Kilmon Horse Racing track
number of kilometers
fenced 2km 30-Jun-16
SCM Processes and Appointment of Service
Provider POE:(Contractors appointment letter)
1000m fencing POE:(Progress report signed
by designated municipal official)
2000m fencing POE:(Progress report
signed by designated municipal official)
Not Applicable IPD R 1 990 000.00 Completion
Certificate
235 N/A Housing Projects
Monitoring 35
No of Quarterly Reports on Housing Projects
Implementation
4 Quarterly
Reports 30-Jun-16 1st Quarter Report
presented to MANCO 2nd Quarter Report
presented to MANCO 3rd Quarter Report
presented to MANCO 4th Quarter Report
presented to MANCO IPD Operational Operational 4 Reports and MANCO Minutes
236 ALL 37 No of awareness
campaigns
conducted 2 Campaigns 30-Jun-16 Not Applicable 1 Waste Management
Awareness campaigns
conducted Not Applicable 1 Waste Management
Awareness campaigns
conducted IPD Operational Operational Campaign
Reports
238 N/A 38 Number of
workshop
conducted 3 30-Jun-16 Appointment of Housing
Officer 1 Workshop Conducted Not Applicable 1 Workshop Conducted IPD Operational Operational Workshop
Reports
240 All EPWP 39 Monthly progress
report 12 monthly
reports 30-Jun-16 3 Monthly Reports
presented to MANCO 3 Monthly Reports presented
to MANCO 3 Monthly Reports
presented to MANCO 3 Monthly Reports
presented to MANCO IPD Operational Operational Reports and
MANCO Minutes
241 All Job Creation 40 Number of Jobs
Created 53 Throughout a
year 30-Jun-16 53 Throughout a year 53 Throughout a year 53 Throughout a year Not Applicable IPD R 503 921.57 Operational Reports
242 All Operational
243 all Operational
245 N/A Assets Transfer 42 Submission to
BTO on Assets to be transferred
7 days after issue of practical
completion certificate to
contractor
30-Jun-16
Submission to BTO on Assets to be transferred
7 days after issue of practical completion certificate to contractor
Submission to BTO on Assets to be transferred 7 days after issue of practical
completion certificate to contractor
Submission to BTO on Assets to be transferred
7 days after issue of practical completion certificate to contractor
Submission to BTO on Assets to be transferred
7 days after issue of practical completion certificate to contractor
IPD Operational Operational Register Reports
246 N/A Landfill site 43
Number of monthly reports
on landfill site development or
Management
12 Monthly
reports 30-Jun-16 3 Monthly Reports
presented to MANCO 3 Monthly Reports presented
to MANCO 3 Monthly Reports
presented to MANCO 3 Monthly Reports
presented to MANCO IPD Operational Operational Reports and
MANCO Minutes
247 All Review of the Spatial
Development
Framework 46
Submission of Reviewed SDF to MANCO for Council Adoption
(1) Integrate comments from MEC CoGTA on Draft SDF and (2) 1st
Draft Completed
Situational Analysis Complete
(1) Review of Implementation Plans and (2) Integrate SDF
into Draft IDP
Submission to MANCO for comments and to
Council for adoption IPD Operational Operational Framework and Council Resolutions
248 All Land Administration 47
Quarterly Progress reports
presented to MANCO on establishment and Land Use
4 Quarterly
Progress reports 30-Jun-16 1st Quarter Report
submitted to MANCO 2nd Quarter Report
submitted to MANCO 3rd Quarter Report
submitted to MANCO 4th Quarter Report
submitted to MANCO IPD Operational Operational 4 Reports and MANCO Minutes Planning
30-Jun-16 Basic Service
Delivery Improved Access to
Basic Services Maintenance of existing structures
Project Management, Social Facilitation & Reporting
Basic Service
Delivery Improved Access to Basic Services
Reduction of poverty, facilitate
growth and improve access
to skills
Waste Management Awareness
Construction and skills Transfer by service provider Basic Service
Delivery Improved Access to Basic Services
To construct community recreational amenities
2.3.1
General Maintenance
41
249 5 Land Acquisition (Cemetery Land,
Donnybrook) 48
Quarterly Progress reports
presented to MANCO
4 Quarterly
Progress reports 30-Jun-16 1st Quarter Report
submitted to MANCO 2nd Quarter Report
submitted to MANCO 3rd Quarter Report
submitted to MANCO 4th Quarter Report
submitted to MANCO IPD Operational Operational 4 Reports and MANCO Minutes
250 All 49 Monthly reports
on land inspections done
12 land inspections
reports 30-Jun-16
(1) Schedule for inspections completed
and (2) 1st Quarter inspections concluded
2nd Quarter inspections
concluded 3rd Quarter inspections
concluded 4th Quarter inspections
concluded IPD Operational Operational 12 Reports
251 N/A 50
Memo to Community Services on illegal land occupation
within 24 hours from
identification Annually within 24 hours from
identification within 24 hours from
identification within 24 hours from
identification within 24 hours from
identification IPD Operational Operational Reports
252 All 51 No. of
roadshows held
per annum 2 Roadshows 30-Jun-16 Not Applicable 1 Roadshow Not Applicable 1 Roadshows IPD Operational Operational 2 Roadshow
Reports
253 N/A Operational
254 52
255
256 Tenure upgrades and
anomaly rectification 55
Quarterly Progress reports
presented to MANCO
4 Quarterly
Progress reports 30-Jun-16 1st Quarter Report
submitted to MANCO 2nd Quarter Report
submitted to MANCO 3rd Quarter Report
submitted to MANCO 4th Quarter Report
submitted to MANCO IPD Operational Operational 4 Reports and MANCO Minutes Land Invasion,
Planning &
Develoment Act and Illegal Developments
Awareness Basic Service
Delivery Improved Access to Basic Services
Properly Manage Land Administrationa
and usage in Ingwe
6.1.1
Land invasion register
5, 9, & 11
Page 6 of 14 OUTCOME
9 IDP Ref No. Q1 Q2 Q3 Q4Responsible
Department Annual BudgetPortfolio of Evidence
Target Target Target Target
1 2015 - 2016 Approved WSP Approved WSP Not applicable Not ApplicableSubmission of final WSP to MANCO Submission of
Council Adopted WSP to LG SETA
MANCO Agenda/ minutes
2 WSP Submitted
to LGSETA 31 May2016
Submitted in
14/15 financial year Not applicable Not ApplicableNot applicable Submission of
Council Adopted WSP to LG SETA
Proof of submission to LGSETA
n/a Skills Audit 3 Skills Audit
Report submitted to MANCO Skills Audit
Report Not Applicable Not Applicable(1) Submission
of Report to MANCONot ApplicableCorporate
ServicesOperationalSkills Audit Report
402 n/a Implementation of
WSP 2015-2016 4 Quarterly reports on WSP implementationApproved WSP 4 reports 30th June 201
1st Quarter WSP Implementation Report submitted and presented to MANCO /Council Committee 2nd Quarter WSP Implementation Report submitted and presented to MANCO /Council Committee
3rd Quarter WSP Implementation Report submitted and presented to MANCO/ Council Committee 4th Quarter WSP Implementation Report submitted and presented to MANCO /Council Committee Corporate ServicesOperational4 Reports as submitted to
MANCO
403 n/a Employment
Equity Report 5 Submission of EE Report to DOL 29
January 2016Submitted EER Consultation
with LLF N/ASubmission EERN/A Corporate
Services OperationalProof of submission
405 All Councillor
Training and
workshops 6
14 programmes implemented throughout the year
6 Programmes implemented 14 Programmes
implemented30-Jun-16 3 4 3 4 Corporate
Services R 480 769Appointment Letters, Proof of attandance
404 Staff Training 7 Number of staff
trained 122 staff60 Training 30-Jun-16 15 15 15 15 Corporate
Services R 616 473Letters, Proof of Appointment attandance,
405 n/a Review of all HR
Policies 8 Number of HR Policies Approved
Approved HR Policies
Analysis and consultation (POE:
attendance register) Draft submission to MANCO
workshopsApproved HR Policies by Council Corporate Services R 60 000Approved HR Policies and
Council Resolution
406 n/a 1.1.4Municipal Wellness
Programme 9 Quarterly reports on Wellness Programme implementation
4 Reports by 30 June 20164 Reports 30th June
2016 1st Quarter Wellness Plan implementation Report submitted (POE :attendance Register) 2nd Quarter Wellness Plan implementation 3rd Quarter Wellness Plan Implementation 4th Quarter Wellness Plan implementation Corporate ServicesR 110 000 Attendance
Register
407 n/a 10% of Funded posts filled115 posts filled100% of funded posts
filled 30-Jun-16
100% of posts filled as per approved Organogram and PCMC
100% of funded posts filled 100% of funded posts filled 100% of funded posts filled Operational
408 n/a 11
Timespan for filling of vacant posts due to resignation, termination, retiring or other 3 months
turnaround time 90 days from
event90 days from event 90 days from
event 90 days from event Corporate
Services Operational
409 n/a 1.1.3Recording System for
Boardroom 12Recording System Installed ProcurementSupply and Delivery N/A N/A Corporate ServicesR480 769.00and Delivery NoteProof of Payment
410 1.1.6Security Services 13Protection and
Security ProcurementAppointment of Security
Service Provider
N/A N/A Corporate
ServicesR1 442 307.69 SLA
413 n/a Fleet Management 15No. of monthly
Fleet Management reports submitted
12 Monthly fleet reports signed by HOD on 30 June 2016 12 Fleet monthly reports signed by HOD
30 June 20163 monthly fleet reports signed by HOD 3 monthly fleet reports signed by HOD 3 monthly fleet reports signed by HOD
3 monthly fleet reports signed
by HODCorporate ServicesOperationalMANCO Reports, General Ledger vote for Fuel
415 n/a
Employee Workshop on Collective agreeements and internal policies
16Number of
workshops held3 workshops3 Workshops30-Sep-16 N/A 1 Workshop1 workshop1 WorkshopCorporate ServicesOperationalAttendance
Register
417 n/a Local Labour Forums 17No. of meetings held per month12 meetings of the LLF held
12 meetings of the local labour forum held
30-Jun-16the local labour 3 meetings of forum held 3 meetings of the local labour forum held 3 meetings of the local labour forum held 3 meetings of the local labour forum held Corporate Services OperationalMinutes
418 n/a Internship progra 18
No. of interns maintained in Municipality throughout the year
10 Interns enroled in programme11 interns in t 30-Jun-1611 interns enrolled in
Programme throughout year 11 interns enrolled in Programme throughout year 11 interns enrolled in Programme throughout year 11 interns enrolled in Programme throughout year Corporate Services OperationalLetters of
Appointments
419 n/a Experiential Training
Programme 19
No. of learners enrolled in programme throughout the year
2 learners10 Learners in programme30-Jun-164 Learners in programme
throughout year6 learners in programme n/a n/a Corporate Services OperationalAppointmentsLetters of
420 n/a Payrol
Administration 20Reports from
Payroll 12 Monthly
Reports 30-Jun-163 Monthly Reports3 Monthly
Reports 3 Monthly Reports 3 Monthly
ReportsCorporate Services OperationalReports
421 n/a
Occupational Health and Safety / Protective
clothing 21Report on Policy
Implementation 4 Quarterly reports by 30 June 2016 4 Quarterly Reports 30-Jun-16
1st Quarter OHS Policy implementation Report submitted 2nd Quarter OHS Policy implementation Report AND Submitted
3rd Quarter OHS Policy implementation Report submitted 4thQuarter OHS Policy implementation Report submitted Corporate
Services R 24 038 Reports
422 n/a Occupational
Health and Safety 22Training Workshops held
New Project/
No previous activity4 Quarterly
Workshops01-Jul-161 Workshop1 Workshop1 Workshop1 WorkshopCorporate Services OperationalAttendance
Register
423 n/a Team building session for
Departmental employees
23Date of session Not Applicable Not Applicable1 Team buliding
session heldNot Applicable orporate ServiR 77 000Proof of payment and attendance register
424 n/a
Annual review of the ICT performance with the organisation 24
Submission of Quarterly Reports to MANCO/ council committees
4 Quarterly reports by 30 June 20164 Quarterly
Reports 30-Jun-16Develop a Performance report2nd Quarter
Report 3rd Quarter Report 4th Quarter
ReportCorporate Services OperationalReports and
MANCO Minutes
425 n/a ICT Maintenance Policy 25
Submission of Draft Policy to MANCO/ council committes
Perform a Baseline exersize - 30 June 2016 Development of
1st Draft Maintenance Policy Submission of Final Draft Maintenance Plan to Treasury Submission of Draft Plan to MANCOCorporate Services OperationalICT Maintenance Plan
427 n/a Conduct ICT
awareness workshops 27Number of ICT awareness
workshops conducted 2 ICT awareness workshops co- ordinated by 30 June 2016 2 ICT awareness workshops conducted
30-Jun-16Not applicable1 WorkshopNot Applicable1 WorkshopCorporate Services OperationalAttendance
Register
428 n/a Coordinate sittings of the
ICT steering committee 28
Monthly meetings of the ICT steering committee coordinated
12 meetings of the ICT steering committee coordinated
30-Jun-163 meetings of the ICT steering committee coordinated 3 meetings of the ICT steering committee coordinated
3 meetings of the ICT steering committee coordinated 3 meetings of
the ICT steering committee coordinated Corporate ServicesOperational Minutes
431 n/a Master Systems
Plan (MSP) and
ICT Strategy 31Submission of
MSP and ICT
Strategy Not applicableNot applicableNot applicable
Submission of MSP and ICT Strategy to Standing Committee Corporate ServicesConsultantsR15000 Approved MSP
433 all 34Timespan from submission of
Agenda to Council Meeting
Council agenda prepared and dispatched 7 days before the date of the meeting
30-Jun-16 Council agenda prepared and dispatched 7 days before the date of the meeting Council agenda prepared and dispatched 7 days before the date of the meeting Council agenda prepared and dispatched 7 days before the date of the meeting Council agenda prepared and dispatched 7 days before the date of the meeting Corporate ServicesOperational Proof of
correspondence sent and date
434 All 35Calendar
correspondence to Dept
Calendar correspondenc e per annum
Correspondenc
e to Dept N/A N/A N/A Corporate
ServicesOperational Proof of correspondence sent and date CORPORATE SERVICES
SDBIP FOR 2015/2016
Secretariat
Good Governance and Public Participation Differentiated Approach to Municipal Financing, Planning and Support
Provision of effective secretariat services to council and council
committees. Annually
01-Oct-15
1.1.2
29-Apr-16 INFORMATION COMMUNICATION TECHNOLOGY
30-Jun-16 Municipal
Institutional Development Transformatiand on
Differentiated Approach to Municipal Financing, Planning and Support To ensure Municipal Compliance on ICT Legislationa and Mandates as set by relevant Legislation 1.1.3
30-Jun-16 23 HR Policies by :2016-06-30
1.1.2 Vacant Posts filled as per Organisational Structure and PCMC approval
Copies of appointment letters 90 days from event
30-Oct-15 Org
Scorecard ref No.
W ard
Development, submission and implementation of the WSP
29 th April 2016
Corporate ServicesOperational 31st May 2016
HUMAN RESOURCES
401 n/a
Municipal Institutional Development and Transformation Differentiated Approach to Municipal Financing, Planning and Support To ensure allignment with Labour Relations Act, Employment Act, including collective agreements and other related legislation. To improve employee wellness, skills.
Ensure effective support systems
1.1.1 30-Mar-16
1.1.5
15-Jan-16 Annual National
KPA STRATEGIC
OBJECTIVE PROJECTSINDICATOR
NO. INDICATORSBASELINE Target
Page 7 of 14
Page 8 of 14
Org.
Scorecard ref
no. Ward National KPA OUTCOME 9 STRATEGIC OBJECTIVE IDP Ref No. PROJECT INDICATORS BASELINE Q1 Q2 Q3 Q4 Responsible
Department Annual
Budget Portfolio of Evidence 2013 - 2014
Results Target Target Target Target
Budget
501 N/A
Financial Viability and
Financial Management
Improved Municipal Finance and Administrative Capability
To Manage Finances in line with MFMA and other applicable
Legislation
MFMA Compliance % compliance with section 75 of MFMA 100%
compliance 30-Jun-16
(1) Budget related polcies on Website (2) 100%
Compliance to Policies
100%
Compliance to Policy
100% Compliance to Policy
100%
Compliance to
Policy BTO Operational Proof of
submission to ICT Unit
502 N/A Qualifications due to
Budgets Section
0 Qualifications due to Budgets
section 30-Jun-16 Not applicable Not applicable Not applicable 0 Qualifications due to Budgets
Section BTO Operational AG Audit Report
503 N/A 5.1.2 Budget Policy Approved Budget
Policy and related
policies 30-Jun-16 Not applicable Not applicable
Budget Steering Committee presentation, Submission of Draft Budget Policy to Council for adoption.
Submission of approved Budget to Treasury (National and Provincial), COGTA and District Municipality
Not applicable BTO Operational Approved Budget Policies
504 N/A Budget Process
Plan Approved Legislative
Budget Process Plan 31-Aug-15
(1) Submission of Draft to Council - 31 Aug 2014 (2) Submission of Council Approved Plan to Treasury - 10 Days after adoption (3) On Webiste - 10 Days after adoption
Not applicable Not applicable Not applicable BTO Operational
Approved Budget Process
Plan and Council Resolutions
505 ALL Number of Budget
Roadshows held 2 Roadshows 30-Jun-16 Not applicable 1 Roadshow 1 Roadshow Not applicable BTO Operational Reports on the
Roadshows
506 N/A Budget
Management
Timeous submission of Draft Budget to Treasury
within 10 working days after tabling by Mayor to Council
Not applicable Not applicable 10 Working Days Not applicable BTO Operational Proof of submission to
Treasury
507 N/A Approved Budget by
date 30-Jun-16 Not applicable Issue Budget
Guidelines to Departments
(1) Submission of Draft Budget to IDP (2) Submission of Draft Budget to Council for adoption (3)
Tabling of Final Draft Budget to Council by Mayor, Submission of Approved Budget to Treasury, Final Budget on Website and Local Media
BTO Operational
Approved Budget, Proof of
submission to Treasury and
Budget on website
508 N/A
Operational Budget Reports submitted to MANCO and Finance Committee
4 Quarterly Reports
submitted 30-Jun-16
1st Q Operational Budget Report submitted
2nd Q Operational Budget Report submitted
3rd Q Operational Budget Report submitted
4th Q Operational Budget Report submitted
BTO Operational
Budget Reports and Finance
Committee Minutes
509 N/A
Capital Budget Reports submitted to MANCO and Finance Committee
4 Quarterly Reports
submitted 30-Jun-16 1st Q Capital Budget Report submitted
2nd Q Capital Budget Report submitted
3rd Q Capital Budget Report submitted
4th Q Capital Budget Report
submitted BTO Operational
Capital Budget Report and
Finance Committee
Minutes INGWE SDBIP FOR 2015 - 2016
BUDGET AND TREASURY OFFICE
Annual Target
Page 9 of 14
510 N/A Budget
Reconciliations Reports
12 Monthly Reconciliations Reports Completed
30-Jun-16 3
Reconciliations Reports
3 Reconciliations Reports
3 Reconciliations Reports
3 Reconciliations
Reports BTO Operational Bank Recon
Reports
511 N/A Financial Reporting Financial Reports Produced
12 S71 and S66 Reports produced
Within 10 days after month ends
3 S71 and S66 Reports produced
3 S71 and S66 Reports produced
3 S71 and S66 Reports produced
3 S71 and S66 Reports
produced BTO Operational S71 and S66
Reports
512 N/A 4 S52 Quarterly
Reports Produced
Within 15 days after the end of Quarter
1 S52 Quarterly Reports Produced
1 S52 Quarterly Reports Produced
1 S52 Quarterly Reports Produced
1 S52 Quarterly Reports
Produced BTO Operational S52 Reports
513 N/A 4 Quarterly
Financial
Statement 30-Jun-16 1st Quarter Financial Statement
2nd Quarter Financial Statement
3rd Quarter Financial Statement
4th Quarter Financial
Statement BTO Operational Quarterly
Financial Statements
514 N/A
1 Mid year/
Adjustment Budget Review.
S71 Submission
28-Feb-16 Not applicable Not applicable
1 Mid year/
Adjustment Budget Review. S71 Submission
Not applicable BTO Operational
Adjusted Budget and S71 Submission
Proof
515 N/A Cash Flow
Management
Ratio of monthly expenditure to cash
available 1 ; 3 Monthly 1 ; 3 1 ; 3 1 ; 3 1 ; 3 BTO Operational
Cash Coverage ratio report submitted to
Finance Committee
518 N/A Asset Register % up to date of Asset
Register 100% up to date
Assets register 30-Jun-16 100% up to date
(1) 100% up to date (2) Conduct 1 Asset Management Workshop - 30 Nov 2014
100% up to date
(1) 100% up to date (2) Conduct Asset Verifcation - 30 June 2015
BTO Operational
PPE Register reconciliations submitted to
Finance Committee
519 N/A Timespan for coding
of new assets Within 2 days
from purchase Within 2 days
from purchase Within 2 days
from purchase Within 2 days from
purchase Within 2 days
from purchase BTO Operational Assets Register Supply Chain
Management
520 N/A
Financial Viability and
Financial Management
Improved Municipal Finance and Administrative Capability
To Manage Finances in line with MFMA and other applicable
Legislation
Procurement Plan
2014 - 2015 Procurement Plan Implementation Reports submitted to MANCO, Treasury and Council
12 monthly reports submitted to FINANCE COMMITTEE, and Treasury
30-Jun-16
3 Procurement Plan
Implementation Reports submitted to MANCO, and Treasury (10th of each month)
3 Procurement Plan
Implementation Reports submitted to MANCO, (10th of each month)
3 Procurement Plan Implementation Reports submitted to MANCO, and Treasury (10th of each month)
3 Procurement Plan
Implementation Reports submitted to MANCO, and Treasury (10th of each month)
BTO Operational SCM Reports
521 N/A
4 Quarterly reports submitted to Council
1st Q Procurement Plan
Implementation Report submitted to Council
2nd Q Procurement Plan
Implementation Report submitted to Council
3rd Q Procurement Plan Implementation Report submitted to Council
4th Q Procurement Plan
Implementation Report submitted to Council
BTO Operational
Procurement Plan reports submitted to Finance Committee and
Council
522 N/A Approved 2015 -
2016 Procurement Plan
Procurement
plan approved 30-Jun-16 Not applicable Not applicable Not applicable
Submission of Draft Procurement Plan for Council Approval
BTO Operational Approved Procurement
Plan
524 N/A MFMA and SCM
Policy Compliance
% compliance with MFMA and SCM Policy
100%
compliance 30-Jun-16 100%
Compliance Not applicable 100% Compliance 100%
Compliance BTO Operational AG Audit Report
525 N/A Qualifications due to
SCM Section
0 Qualifications due to SCM
section 30-Jun-16 Not applicable Not applicable Not applicable 0 Qualifications due to SCM
Section BTO Operational AG Audit Report
526 N/A SCM Policy
Implementation
SCM Policy Implementation Report
10 Working days after end of
financial year Not applicable Not applicable Not applicable 10 Working days after end of the
Financial Year BTO Operational SCM Reports
527 N/A Bid Processing Time lapse when
processing bids 14 days for
quotations 30-Jun-16 14 days for
quotations 14 days for
quotations 14 days for
quotations 14 days for
quotations BTO Operational SCM Reports
528 N/A 90 days for
tenders 30-Jun-16 90 days for
tenders 90 days for
tenders 90 days for tenders 90 days for
tenders BTO Operational SCM Reports
Page 10 of 14
529 N/A SCM Database Number of Quarterly
Self-Audit Reports submitted to MANCO
4 Quarterly Audit Reports submitted to MANCO
30-Jun-16
1st Q SCM Database Audit Report submitted to MANCO
2nd Q SCM Database Audit Report submitted to MANCO
3rd Q SCM Database Audit Report submitted to MANCO
4th Q SCM Database Audit Report submitted to MANCO
BTO Operational SCM Database Reports
530 N/A Number of state
officials on Database
0 number of state officials on
Database 30-Jun-16 0 number of state officials on Database
0 number of state officials on Database
0 number of state officials on Database
0 number of state officials on
Database BTO Operational AG Audit
Reports
531 N/A
Number of Blacklisted companies on Database
0 number of Blacklisted Companies on Database
0 number of Blacklisted Companies on Database
0 number of Blacklisted Companies on Database
0 number of Blacklisted Companies on Database
0 number of Blacklisted Companies on Database
BTO Operational AG Audit Reports
532 N/A Monitor Irregular
Expenditure % of irregular
expenditure 0% Irregular
Expenditure 30-Jun-16 0% Irregular
Expenditure 0% Irregular
Expenditure 0% Irregular
Expenditure 0% Irregular
Expenditure BTO Operational AG Audit
Reports
533 N/A Reports submitted to
FINANCE COMMITTEE
12 Monthly Reports
submitted 30-Jun-16 3 Monthly Reports submitted
3 Monthly Reports submitted
3 Monthly Reports submitted
3 Monthly Reports
submitted BTO Operational
Monthly reports submitted to
Finance Committee
534 N/A
Placing of electronic orders for all acquisitions other than those from Petty cash
Printout of purchase
orders Stats of orders
created Monthly 3 Monthly Stats
of orders Report 3 Monthly Stats
of orders Report 3 Monthly Stats of
orders Report 3 Monthly Stats
of orders Report BTO Operational Printout of Purchase orders
536 N/A Assets Reporting Quarterly Assets
Reports 4 Quarterly
Reports 30-Jun-16 1st Quarter
Report 2nd Quarter
Report 3rd Quarter Report 4th Quarter
Report BTO Operational Assets Reports
538 N/A Asset Register
Verification
Number of verification exersizes
conducted 2 Exersizes 30-Jun-16 Not applicable 1 Session Not applicable 1 Session BTO Operational Verification
Reports Revenue
Management
539 N/A Financial
Viability and Management
Improved Municipal Finance and Administrative Capability
To Manage Finances in line with MFMA and other applicable
Legislation
5.1.1 Implementation of supplementary valuation roll
Supplementary Valuation Roll
presented to MANCO 30-Jun-16 Not applicable Not applicable Not applicable Report
Presented to
MANCO BTO R500 000 Actual
Supplementary Valuation Roll
540 N/A Reduction of
Debtors Book % Reduction of
Debtors Book 10% Redction 30-Jun-16 2.5% Reduction 2.5% Reduction 2.5% Reduction 2.5% Reduction BTO Operational Debtors Book Reports
541 N/A Revenue
Enhancement
Strategy Approved Strategy 30-Jun-16 Not applicable Not applicable Not applicable
Submission of Draft Strategy to MANCO for Council Adoption
BTO Operational
Approved Strategy and
Council Resolutions
542 N/A
Quarterly Reports submitted FINANCE on the
Implementation of Strategy
4 Quarterly Reports
submitted 30-Jun-16
1st Quarter Implementation Report Submitted
2nd Quarter Implementation Report Submitted
3rd Quarter Implementation Report Submitted
4th Quarter Implementation Report Submitted
BTO Operational
Implementation Reports submitted to
Finance Committee and
Minutes
544 N/A Billing and
Collection Collection rate 1:0.6 30-Jun-16 1:0.6 1:0.6 1:0.6 1:0.6 BTO Operational
Revenue Reports sumitted to
Finance Committee
546 N/A Qualifications due to
Revenue Section
0 Qualifications due to Revenue
section 30-Jun-16 Not applicable Not applicable Not applicable 0 Qualifications due to Revenue
Section BTO Operational AG Audit
Reports