• Tidak ada hasil yang ditemukan

Presentation template (Powerpoint 2007) - MFMA

N/A
N/A
Protected

Academic year: 2025

Membagikan "Presentation template (Powerpoint 2007) - MFMA"

Copied!
10
0
0

Teks penuh

(1)

1

National Treasury Municipal Monitoring System

Johan Jurd

(2)

Current collection method and processes

(3)

Key points to highlight

The current reporting processes concentrate on people with the financial system as a side issue which can easily be ignored / mis-used / abused.

The new collection method will place the emphasis where it should be - the centralised financial system.

The current process requires a lot of intervention from NT as well as the local authority to ensure integrity and quality of data.

With the implementation of SCOA, most quality checks and control reports will be generated at the municipality.

NT is currently researching the most effective and secure collection methods.

Non-piloting municipalities will continue to report using the current processes to ensure continued S71 publications.

Piloting municipalities will start to use the new reporting method BUT must be able to fall back onto the old method if any problems or connectivity issues are experienced.

NT will cater for both reporting methods until most municipalities have implemented SCOA successfully.

(4)

Intended collection method and processes

Data

Municipal System

Municipal System

Municipal System

Municipal System

Municipal System

Municipal System

Municipal System

Current WebFOCUS Application Suite

S T B National

Provincial

Local

Reporting

Upload Files

(5)

Functional Steps

SCOA Transfer Bus (STB) will run on a central NT system.

It will poll and “listen” for an unused file on the Local Government systems.

Format likely to be XBRL.

If no file found, alert certain players on both sides.

Polling will carry on.

After successful upload various validation steps will be completed at STB.

If validation fails, alerts will again automatically be distributed to relevant parties.

After successful validation, the files will be accumulated and pushed to the current WebFOCUS application for processing and reporting at various levels.

STB will also then delete the file on the Local Government side.

Exception Reports will continually be distributed to relevant parties.

(6)

XBRL Format

eXtensible Business Reporting Language (XBRL) is a financial reporting specification developed by an international industry body (www.xbrl.org), chartered with creating a standards-based method of preparing, publishing, exchanging and analysing financial statements in a variety of formats.

XBRL is an open, Internet-focused specification that

uses Extensible Markup Language (XML)-based data

tags to describe financial statements for both public

and private companies.

(7)

Benefits

Responsibility and Control of “fetching” the information now remain with NT.

Queuing functionality is included.

Building of any Business Rules is included.

Unlimited Validation steps included

Remote Archiving / Deletion functionality is included.

International Standards are utilised.

(8)

8

Questions,

Concerns,

Comments.

(9)

9

Thank You!

(10)

Intended collection method and processes

Referensi

Dokumen terkait

If you wish to make charts like this and don’t have PPT 2007, we have provided the graphical elements to help you build this yourself. Here is the description of the

7.2 Data Collection Method: Data collection goes through several processes: - Visiting the source for the first time - Introducing the survey and its objectives to the person in

7.2 Data Collection Method: Data collection goes through several processes: - Visiting the source for the first time - Introducing the survey and its objectives to the person in

7.2 Data Collection Method: Data collection goes through several processes: - Visiting the source for the first time - Introducing the survey and its objectives to the person in

3 The Meaning of Quality and Quality Improvement Quality control QC is a procedure or set of procedures intended to ensure that a manufactured product or performed service adheres to

Stand ard Cha rt of Acco unts Improved Service Delivery 3 The Local Government Accountability Cycle and mSCOA IDP y ateg Str ear 5 Y • Budget • 3 Year SDBIP • Annual Plan to

2.6 Changes to mSCOA Tables: Item WIP – Net Assets: Still to add Reserves and Funds – Revenue: • Licence and Permits – changed to be exchange and non- exchange • Property Rates -

This is a PowerPoint template that can be used for various presentations, with a clean and neutral design that can be adapted to any