• Tidak ada hasil yang ditemukan

Selanjutnya

N/A
N/A
Protected

Academic year: 2017

Membagikan "Selanjutnya "

Copied!
28
0
0

Teks penuh

Loading

Gambar

Table 1. Commercial energy supply mix at the ends of Repelita II, III 6
Table 2 Power expansion plan for Repelita IV
Table 4 Deep peat in Indonesia (103ha)

Referensi

Garis besar

Dokumen terkait

During the visit, the Minister for Women Empowerment of the Republic of Indonesia had an ample occasion to make a series of field visit to the social and economic activities

Articles 2, 3 and 14 (9) of the Code of Conduct shall, on a reciprocal basis, not be applied in conference trades between Finland and other OECD countries which are parties to

With regards to each commodity financed under this agreement, the export limitation period for the same or like commodities shall be the period beginning on the

With regards to each commodity financed under this agreement, the export limitation period for the same or like commodities shall be the period beginning on the

ในการพัฒนาตนเองที่บุคลากรโรงเรียนวัดหนองจิกเลือกมากที่สุดเป็นอันดับที่ 1 รองลงมาอันดับที่ 2 คือ การฝึกอบรม training/ workshop อันดับที่ 3 คือ การดูงานนอกสถานที่ site visit อันดับที่ 4

Material and Methods: Participants who had completed week 20/End of Trial visit in the main Auckland’s Cancer Cachexia evaluating Resistance Training ACCeRT study were invited to

Appendix 2 Formal Agreement Department: Manager/Supervisor: Contributor Person to make contributions: Training Completed date Contributor Signature Marketing Signature Agreed use

Focus for next 12 months • Planned Activities that have been discussed include a site visit to look at the rehabilitation sites completed in February 2021 • Suggestions included