• Tidak ada hasil yang ditemukan

Directory UMM :Data Elmu:jurnal:J-a:Journal Of Economic Dynamics And Control:Vol24.Issue5-7.Jul2000:

N/A
N/A
Protected

Academic year: 2017

Membagikan "Directory UMM :Data Elmu:jurnal:J-a:Journal Of Economic Dynamics And Control:Vol24.Issue5-7.Jul2000:"

Copied!
33
0
0

Teks penuh

Loading

Gambar

Fig. 1. Two parameter bifurcation diagram w.r.t. �defor a 2-cycle, 2-denote saddle-node bifurcation curves of period and �
Fig. 2. Bifurcation diagrams plotting long-run behavior versus intensity of choice � for (a) constantbeliefs about conditional variances of returns, (b) time varying beliefs about conditional variances ofreturns (wvar"w�, wret"w� ).
Fig. 3. Unstable manifold for case 1 (�"0.65, �"500): "rst 6 iterates of the segment EA�.
Fig. 4. Largest Lyapunov characteristic exponents.
+3

Referensi

Dokumen terkait

six sections: Section I: Invited contributions; Section II: Heterogeneous agents; Section III: Local and global bifurcations in 2-D systems; Section IV: Macro dynamics; Section

This larger view nests conventional rational expectations general equilibrium theory in the sense that if the costs of acquiring & full knowledge of the true model expectations

This model tries to combine both a well de " ned economic structure in the market trading mechanisms, along with inductive learning using a classi " er- based system..

In this paper we show how the global dynamics of an economic model can be analyzed by the study of some global bifurcations that change the shape of the chaotic attractors and

In Section 5.4 we have seen that when the symmetric equilibrium price vector of a ta ( tonnement process with both a re # ectional and a rotational symmetry loses stability

In a pure exchange overlapping generations model we obtain that to have a cycle and a chaotic dynamics under bounded rationality learning we need a coe $ cient of risk aversion for

portfolio holdings constitutes a su $ cient minimal state space and that there exists a continuous policy function f as well as a function g mapping last period ' s portfolio

for every initial resource stock a critical level of debt, below which debt may be steered to zero but above which debt tends to in " nity, no matter how the rate of extraction