A. Fasilitas Kredit (lanjutan) Credit Facility (continued)
41. ASET DAN LIABILITAS DALAM MATA UANG ASING ASSETS AND LIABILITIES IN FOREIGN CURRENCIES
30 September 2021 (dalam angka penuh)/ December 31, 2020 (in full amount)
Dolar AS/
USD
Yen Jepang/
JPY
Dolar Singapura/
SGD
Rupee India/
Rupee
Dolar Hongkong/
HKD
Ringgit Malaysia/
MYR
Euro/
EUR
Setara Rupiah/
Rupiah Equivalent
Aset/ Assets
Kas dan setara kas/ Cash
and cash equivalents 5.283.372 1.611.739 37.264 - - - 147.547 78.652.023.855
Piutang usaha/ Account
receivables 1.874.593 - 1.320 9.022.960 4.540.895 737.725 - 39.446.406.591
Piutang retensi/ Retention
receivables 952.289 - - - - - - 13.624.404.798
Jumlah/ Total 8.110.254 1.611.739 38.584 9.022.960 4.540.895 737.725 147.547 131.722.835.244
Liabilitas/ Liabilities Utang usaha/ Account
payables (419.704) (320.403) - - - - (790) (6.059.066.817)
Jumlah/ Total (419.704) (320.403) - - - - (790) (6.059.066.817)
Aset (liabilitas) bersih/
Net assets
(liabilities) 7.690.550 1.291.336 38.584 9.022.960 4.540.895 737.725 146.757 125.663.768.427
31 Desember 2020 (dalam angka penuh)/ December 31, 2020 (in full amount)
Dolar AS/
USD
Yen Jepang/
JPY
Dolar Singapura/
SGD
Rupee India/
Rupee
Dolar Hongkong/
HKD
Ringgit Malaysia/
MYR
Euro/
EUR
Setara Rupiah/
Rupiah Equivalent
Aset/ Assets
Kas dan setara kas/ Cash
and cash equivalents 16.713.683 1.614.116 37.264 - - - - 236.363.575.537
Piutang usaha/ Account
receivables 1.833.916 - 1.320 9.022.960 4.540.895 737.726 - 38.462.622.696
Piutang retensi/ Retention
receivables 952.289 - - - - - - 13.432.042.468
Jumlah/ Total 19.499.888 1.614.116 38.584 9.022.960 4.540.895 737.726 - 288.258.240.701
Liabilitas/ Liabilities Utang usaha/ Account
payables (583.564) (183.798) - - - - (532) (8.265.475.145)
Jumlah/ Total (583.564) (183.798) - - - - (532) (8.265.475.145)
Aset (liabilitas) bersih/
Net assets
(liabilities) 18.916.324 1.430.318 38.584 9.022.960 4.540.895 737.726 (532) 279.992.765.556
a. Perjanjian dengan PT Angkasa Pura II (Persero) tanggal 9 Maret 2018, Nomor Kontrak PJJ.14.07/01/03/2018/0292 untuk pekerjaan penggantian garbarata tahap II Bandara Soekarno Hatta Cengkareng dengan nilai kontrak Rp98,50 Miliar. (A206-17)
a. Agreement with PT Angkasa Pura II (Persero) dated March 9, 2018, Contract Number PJJ.14.07/01/03/2018/0292 for replacement working of garbarata session II in Soekarno-Hatta International Airport with total contract value of Rp98.50 Billion. (A206-17) b. Perjanjian dengan PT Pertamina Hulu Rokan
No. 39PHR20-0194 sampai dengan Agustus 2022 untuk pengadaan, pemasangan dan pemeliharaan pompa angguk (pumping) dengan nilai kontrak sebesar Rp229,40 Miliar.
(P185-21)
b. Agreement with PT Pertamina Hulu Rokan No.39PHR20-0194 up to August 2022 for procurement, installation, and pumping maintenance with total contract value of Rp229.40 Billion. (P185-21)
c. Perjanjian dengan PT PLN (Persero) Kantor Pusat No. 1021/DAN.02.02/DITDAN/2016 tanggal 15 Juni 2016 untuk pekerjaan T/L 150 KV Duri Kosambi-Kembangan dengan nilai kontrak sebesar Rp530,89 Miliar. (TJ75-16)
c. Agreement with PT PLN (Persero) Head Office No.1021/DAN.02.02/DITDAN/2016 dated June 15, 2016 for procurement & construction No. 077.PJ/KON.02.01/UIP JBTB I/20 untuk Pengadaan Barang dan Jasa Konstruksi Sutet 500 KV Grati–TX Kalangan dengan nilai kontrak Nomor Kontrak 52/SPPM/WK/EPC/2020 untuk Pekerjaan Waskita 40 Set Tower 500 Kv Zona 3 dengan nilai kontrak sebesar Rp47,16 Miliar.
(TL29-20)
e .
Agreement with PT Waskita Karya (Persero), Tbk., until November 20, 2020, Contract Number 52/SPPM/WK/EPC/2020 for Waskita 40 Set Tower 500 Kv Zona 3 with a contract value of Rp47.16 Billion. (TL29-20)
f. Perjanjian dengan PT Hutama Karya Infrastruktur sampai dengan 17 Agustus 2020, Nomor Kontrak REV.02.HKI/AGS.23.04/SPMK.PEKD untuk Pekerjaan Mortar Foam Toll Pekanbaru Dumai dengan nilai kontrak sebesar Rp22,98 Miliar.
(R589-20)
f. Agreement with PT Hutama Karya Infrastruktur until August 17, 2020, Contract Number REV.02.HKI/ AGS.23.04/SPMK.PEKD for Mortar Foam Toll Pekanbaru Dumai with a contract value of Rp22.98 Billion. (R589-20)
g. Perjanjian dengan PT Angkasa Pura Properti sampai dengan 20 Maret 2021, No. Kontrak BA.897/APP-PL/2020 untuk Pekerjaan Pengadaan 6 unit Garbarata di Bandara Sultan Hasanuddin Makassar dengan nilai kontrak sebesar Rp31,90 Miliar. (A237-20)
g. Agreement with PT Angkasa Pura Properti until March 20, 2021, Contract No. BA.897/APP-PL/
2020 for the Procurement Work of 6 Garbarata units at Sultan Hasanuddin Makassar Airport with a contract value of Rp31.90 Billion.
(A237-20) h. Perjanjian dengan PT PLN (Persero) UIP Jawa
Bagian Tengah II sampai dengan Juni 2019, Nomor Kontrak 3554.FAC/KON.02.01/UIP JBT II/2018 untuk Pekerjaan TJ. Jati TX Ungaran – Pedan Section 2 dengan nilai kontrak sebesar
h. Agreement with PT PLN (Persero) UIP Jawa Bagian Tengah II until June 2019, Contract Number 3554.FAC/KON.02.01/UIP JBT II/2018 for work TJ. Jati TX Ungaran – Pedan Section 2 with a contract value Rp19.70 Billion. (TK92-19)
42. PERIKATAN (lanjutan) 42. COMMITMENTS (continued)
i. Perjanjian dengan PT PLN (Persero) UIP Kalimantan Bagian Timur sampai dengan Januari 2019, Nomor Kontrak 59.K/PJ/KON.02.02/APLN/
UIPKALBAGTIM/2017 untuk pekerjaan Pembangunan SUTT 150 KV GI.TJ.REDEB-GITJ.SELOR SEC. 1 dengan nilai kontrak sebesar Rp83,05 Miliar. (TK64-18)
i. Agreement with PT PLN (Persero) UIP Easter Kalimantan up to January 2019, Contract Number 59.K/PJ/KON.02.02/APLN/UIP KALBAGTIM/ 2017 for Development work of SUTT 150 KV GI.TJ.REDEB-GITJ.SELOR SEC.
1 with total contract value of Rp83.05 Billion.
(TK64-18) j. Perjanjian dengan PT PLN (Persero) UIP Jawa
Bagian Timur dan Bali I sampai dengan Maret 2019, Nomor Kontrak 0002.PJ/KON.02.02/
UIPJBTBI/2 untuk pekerjaan PLN SUTT 150 KV Jatigedong/Cheiljedang – Ngimbang dengan nilai kontrak sebesar Rp51,09 Miliar. (TK66-18)
j. Agreement with PT PLN (Persero) UIP East Java and Bali I until March 2019, Contract Number 0002.PJ/KON.02.02/UIPJBTBI/2 for the work of PLN SUTT 150 KV Jatigedong/
Cheiljedang - Ngimbang with a contract value of Rp51.09 Billion. (TK66-18)
k. Perjanjian dengan BUT. Hyundai Engineering, Co, Ltd., sampai dengan Juni 2020, Nomor Kontrak CB2-SC-EL-0004 untuk pekerjaan Cirebon II CFPP Project 500KV TL PLTU 2 Cirebon – Mandirancan SS dengan nilai kontrak sebesar Rp203,52 Miliar. (TK68-18)
k. Agreement with BUT. Hyundai Engineering, Co, Ltd., up to June 2020, Contract Number CB2-SC-EL-0004 for work of Cirebon II CFPP Project 500KV TL PLTU 2 Cirebon – Mandirancan SS with total contract value of Rp203.52 Billion.
(TK68-18) l. Perjanjian dengan PT Adhi Karya (Persero) Tbk.,
sampai dengan Juli 2018, Nomor Kontrak LRT-CV-WO-456;466 untuk pekerjaan Adhikarya Handrailing Cawang - Cikunir - Bekasi Timur contract value of Rp25.05 Billion. (TK73-18)
m. Perjanjian dengan PT Angkasa Pura Properti sampai dengan Maret 2019 Nomor Kontrak APP/KTR/2018/DU untuk pengadaan dan pemasangan Garbarata di New Yogyakarta International Airport – Kulon Progo dengan nilai kontrak sebesar Rp66,42 Miliar. (A219-18)
m. Agreement with PT Angkasa Pura Properti up to
March 2019, Contract Number
APP/KTR/2018/DU for procurement &
installation working of Passenger Boarding Bridge in New Yogyakarta International Airport-Kulon Progo with total contract value of Rp66.42 Billion. (A219-18)
n. Perjanjian dengan PT KSO BUKAKA-KS sampai dengan Maret 2019, Nomor Kontrak 01/KSO-BUKAKA-KS/BTU/SUB/V/2017 Pekerjaan Steel Box Girder, Bearing Pad dan Expansion Joint Proyek Toll Jakarta Cikampek Elevated II dengan nilai kontrak sebesar Rp2,89 Triliun. (B520-17)
n. Agreement with PT KSO BUKAKA-KS until March 2019, Contract Number 01/KSO-BUKAKA-KS/BTU/SUB/V/2017 Work Steel Box Girder, Bearing Pad and Expansion Joint Project for Toll Jakarta Cikampek Elevated II with a contract value of Rp2.89 Trillion. (B520-17) o. Perjanjian dengan PT Kerinci Merangin Hidro
sampai dengan Maret 2019, Nomor Kontrak 1.5.3.2/LH41/KMH-BTU/AK/III/2019 untuk Pekerjaan Work Adit 1 PLTA Merangin 350 MW Kerinci-Jambi dengan nilai kontrak sebesar
o. Agreement with PT Kerinci Merangin Hidro until
March 2019, Contract Number
1.5.3.2/LH41/KMH-BTU/AK/III/2019 for work Adit 1 PLTA Merangin 350 MW Kerinci-Jambi with a contract value of Rp64.80 Billion. (9598-07)
p. Perjanjian dengan PT Kerinci Merangin Hidro sampai dengan Maret 2019, Nomor Kontrak 1.1.0.0/LH41/KMH-BTU/AK/III/2019 untuk Pekerjaan Mobilisasi & Demobilisasi PLTA Merangin 350 MW Kerinci-Jambi dengan nilai kontrak sebesar Rp140,00 Miliar. (9598-07)
p. Agreement with PT Kerinci Merangin Hidro until
March 2019, Contract Number
1.1.0.0/LH41/KMH-BTU/AK/III/2019 for work Mobilization & Demobilization PLTA Merangin 350 MW Kerinci-Jambi with a contract value of Rp140.00 Billion. (9598-07)
q. Perjanjian dengan PT Kerinci Merangin Hidro sampai dengan Maret 2019, Nomor Kontrak 1.3.0.0/LH41/KMH-BTU/AK/III/2019 untuk Pekerjaan Fasilitas Umum dan Basecamp PLTA Merangin 350 MW Kerinci-Jambi dengan nilai kontrak sebesar Rp275,04 Miliar. (9598-07)
q. Agreement with PT Kerinci Merangin Hidro until
March 2019, Contract Number
1.3.0.0/LH41/KMH-BTU/AK/III/2019 for work Public Fasilities and Basecamp PLTA Merangin 350 MW Kerinci-Jambi with a contract value of Rp275.04 Billion. (9598-07)
r. Perjanjian dengan PT Kerinci Merangin Hidro sampai dengan Maret 2019, Nomor Kontrak 1.2.0.0/LH41/KMH-BTU/AK/III/2019 untuk Pekerjaan Pembuatan Jalan Akses PLTA Merangin 350 MW Kerinci-Jambi dengan nilai kontrak sebesar Rp419,70 Miliar. (9598-07)
r. Agreement with PT Kerinci Merangin Hidro until
March 2019, Contract Number
1.2.0.0/LH41/KMH-BTU/AK/III/2019 for work Road Access Creation PLTA Merangin 350 MW Kerinci-Jambi with a contract value of Rp419.70 Billion. (9598-07)
s. Perjanjian dengan PT Kerinci Merangin Hidro sampai dengan Maret 2019, Nomor Kontrak 5.0.0.0/LH41/KMH-BTU/AK/III/2019 untuk Pekerjaan Pembuatan Jasa Engineering PLTA Merangin 350 MW Kerinci-Jambi dengan nilai kontrak sebesar Rp433,44 Miliar. (9598-07)
s. Agreement with PT Kerinci Merangin Hidro until
March 2019, Contract Number
5.0.0.0/LH41/KMH-BTU/AK/III/2019 for work Engineering services PLTA Merangin 350 MW Kerinci-Jambi with a contract value of Rp433.44 Billion. (9598-07)
t. Perjanjian dengan PT Kerinci Merangin Hidro sampai dengan Maret 2019, Nomor Kontrak 1.5.3.3/LH41/KMH-BTU/AK/III/2019 untuk Pekerjaan Work Adit 1 PLTA Merangin 350 MW Kerinci-Jambi dengan nilai kontrak sebesar Rp108,49 Miliar. (9598-07)
t. Agreement with PT Kerinci Merangin Hidro until
March 2019, Contract Number
1.5.3.3/LH41/KMH-BTU/AK/III/2019 for work Adit 1 PLTA Merangin 350 MW Kerinci-Jambi with a contract value of Rp108.49 Billion. (9598-07)
u. Perjanjian dengan PT Kerinci Merangin Hidro sampai dengan Maret 2019, Nomor Kontrak 1.5.3.4/LH41/KMH-BTU/AK/III/2019 untuk Pekerjaan Work Adit 1 PLTA Merangin 350 MW Kerinci-Jambi dengan nilai kontrak sebesar Rp40,12 Miliar. (9598-07)
u. Agreement with PT Kerinci Merangin Hidro until
March 2019, Contract Number
1.5.3.4/LH41/KMH-BTU/AK/III/2019 for work Adit 1 PLTA Merangin 350 MW Kerinci-Jambi with a contract value of Rp40.12 Billion. (9598-07)
v. Perjanjian dengan PT Angkasa Pura I (Persero) tanggal Januari 2021, Nomor Kontrak API.40/PL02/KTRK/2020/GM.DPS-B untuk Pekerjaan Pengadaan & Pemasangan PBB di Bandar Udara I Gusti Ngurah Rai-Bali dengan nilai kontrak sebesar Rp20,19 Miliar. (A239-20)
v. Agreement with PT Angkasa Pura I (Persero) dated January 2021, Contract Number API.40/
PL02/KTRK/2020/GM.DPS-B for Procurement &
Installation of PBB at I Gusti Ngurah Rai-Bali Airport with a contract value of Rp20.19 Billion.
(A239-20)
42. PERIKATAN (lanjutan) 42. COMMITMENTS (continued)
w. Perjanjian dengan PT Angkasa Pura Properti tanggal Januari 2021, Nomor Kontrak AP.I.034/PL.02/2020/SPP.DT-B untuk Pekerjaan Pengadaaan & Pemasangan Garbarata di Bandara Adi Soemarno - Solo dengan nilai kontrak sebesar Rp10,65 Miliar (A238-20)
w. Agreement with PT Angkasa Pura Properti dated January 2021, Contract Number AP.I.034/ PL.02/2020/SPP.DT-B for Procurement & installation of Garbarata at Installation Adi Soemarno - Solo Airport with a contract value of Rp10.65 Billion (A238-20) x. Perjanjian dengan Ana Motor Service Co. Ltd.,
tanggal Desember 2020, Nomor Kontrak A240/BTU-ANAMS/UBJ,FSZ,SDJ/VI/ untuk Pekerjaan PBB Glass Type Easywalk For Yamaguchibu-IV, Shizuoaka-III And Sendai-III dengan nilai kontrak sebesar Rp9,37 Miliar.
(A240-20)
x. Agreement with Ana Motor Service Co. Ltd., dated December 2020, Contract Number A240/BTU-ANAMS/UBJ,FSZ,SDJ/VI/ for PBB Works Glass Type Easywalk For Yamaguchibu-IV, Shizuoaka-III And Sendai-III with a contract value of Rp9.37 Billion. (A240-20)
y. Perjanjian dengan PT PLN (Persero) UIP Jawa Tengah II tanggal Juni 2020, Nomor Kontrak 0262.BA/DAN.01.01/490000/2020 untuk Pekerjaan Pengadaan Tower Sutet 500 kV PPLTU Indramayu – Cibatu (Deltamas) Paket dengan nilai kontrak sebesar Rp20,39 Miliar (TL20-20)
y. Agreement with PT. PLN (Persero) UIP Jawa Tengah II dated June 2020, Contract Number 0262.BA/DAN.01.01/490000/2020 for the Procurement of Tower sutet 500 kV PPLTU Indramayu - Cibatu (Deltamas) Package with a contract value of Rp20.39 Billion (TL20-20)
z. Perjanjian dengan PT Pertamina Hulu Kaltim tanggal Mei 2020 untuk Pekerjaan Construction and Infrastructure Maintenance Service For North Area dengan nilai kontrak sebesar Rp90,65 Miliar (J156)
z. Agreement with PT Pertamina Hulu Kaltim dated May 2020 for Construction and Infrastructure Maintenance Service For North Area work with a contract value of Rp90.65 Billion (J156)
aa. Perjanjian dengan PT Angkasa Pura II (Persero) tanggal Mei 2019, Nomor Kontrak PJJ.14.07/01/14/10/2018/1477 untuk Pekerjaan Penggantian Garbarata tahap III Bandara Soetta-Cengkareng dengan nilai kontrak sebesar Rp74,39 Miliar (A222-19)
aa. Agreement with PT Angkasa Pura II (Persero) dated May 2019, Contract Number PJJ.14.07/
01/14/10/2018/1477 for step III Aerospace Replacement Work at Soetta-Cengkareng Airport with a contract value of Rp74.39 Billion (A222-19)
ab. Perjanjian dengan PT Angkasa Pura II (Persero) tanggal Januari 2020, Nomor Kontrak SPR.14.10.01/04/01/2019/0002 untuk Pekerjaan Airside Coridor, Fix Bridge & Garbarata di Bandara Supadio Pontianak dengan nilai kontrak Rp48 Miliar (A225-19)
ab. Agreement with PT Angkasa Pura II (Persero) dated January 2020, Contract Number SPR.14.10.01/04/01/2019/0002 for Airside Coridor, Fix Bridge & Garbarata Work at Supadio Airport Pontianak with a contract value of Rp48 Billion (A225-19 )
ac. Perjanjian dengan PT Waskita Karya (Persero) Tbk tanggal April 2020, Nomor Kontrak 428/WK/BD/T1J/VEN/X/2019 untuk Pekerjaan Pengadaan PBB B2-23/32 untuk Perluasan TerminaI I Bandar Udara Juanda-Surabaya dengan nilai kontrak Rp12,11 Miliar (A235-19)
ac. Agreement with PT Waskita Karya (Persero) Tbk dated April 2020, Contract Number 428/WK/BD /T1J/VEN/X/2019 for PBB Procurement Work B2-23/32 for the Expansion of Terminal I Juanda-Surabaya Airport with a contract value of Rp12.11 Billion (A235-19)
ad. Perjanjian dengan PT Angkasa Pura II (Persero) tanggal Februari 2020, Nomor Kontrak KEP.06.02/06/12/2019/0078 untuk Pekerjaan Pengadaan & Pemasangan PBB di Bandara Internasional Minangkabau dengan nilai kontrak sebesar Rp14,57 Miliar (A236-20)
ad. Agreement with PT Angkasa Pura II (Persero) dated February 2020, Contract Number KEP.06.02/ 06/12/2019/0078 for PBB Procurement & Installation work at International Minangkabau Airport with a contract value of Rp14.57 Billion (A236-20)
ae. Perjanjian dengan PT Panca Duta Karya Abadi sampai dengan 4 Desember 2021, Nomor Kontrak 001/PDKASBY/PROBANDARATMK/X/20 untuk pekerjaan Pengadaan dan Pemasangan Garbarata Bandar Udara Internasional Mozes Kilangin-Timika dengan nilai kontrak sebesar Rp19,31 Miliar (A242-20)
ae. Agreement with PT Panca Duta Karya Abadi until December 4, 2021, Contract Number 001/
PDKASBY/PROBANDARATMK/X/20 for the work of Procurement and Installation of Garbarata Mozes Kilangin-Timika International Airport with a contract value of Rp19.31 Billion (A242-20)
af. Perjanjian dengan PT Bumi Mineral Sulawesi tanggal Desember 2019, Nomor Kontrak 001/BMS-SPK/VIII/2019 untuk pekerjaan BMS 143 set Tower TL 150 kV PLTA BMS – SMELTER dengan nilai kontrak sebesar Rp39,74 Miliar (TL03-19)
af. Agreement with PT Bumi Mineral Sulawesi dated December 2019, Contract Number 001/BMS-SPK/VIII/2019 for the Work of BMS 143 Set Tower TL 150 kV PLTA BMS - SMELTER with a contract value of Rp39.74 Billion (TL03-19)
ag. Perjanjian dengan PT PLN (Persero) UIP Kalimantan Bagian Tengah tanggal April 2020 untuk Pekerjaan Pengadaan Material Tower SUTT 150 kV SAMPIT – Kuala Pembuang value of Rp39.74 Billion (TL12-19)
ah. Perjanjian dengan PT PLN (Persero) Kantor Pusat tanggal November 2020, Nomor Kontrak 0334.PJ/DAN.02.02/010700/2019 untuk Pekerjaan LOT 1: Transmisi 500 kV Balaraja – Cikupa dengan nilai kontrak sebesar Rp482,84 Miliar (TL01-19)
ah. Agreement with PT PLN (Persero) Head Office dated November 2020, Contract Number 0334.PJ/ DAN.02.02/010700/2019 for LOT 1 work: 500 kV transmission Balaraja - Cikupa with a contract value of Rp482.84 Billion (TL01-19)
ai. Perjanjian dengan PT Gunung Inti Sempurna tanggal Juni 2020 untuk pekerjaan Huadian BAP-500 kV T/L Mine Mouth Sumatra Selatan dengan nilai kontrak sebesar Rp72,62 Miliar (TL18-20)
ai. Agreement with PT Gunung Inti Sempurna dated June 2020 for the Work of Huadian BAP-500 kV T/L South Sumatra-Mine Mouth with a contract value of Rp72.62 Billion (TL18-20) aj. Perjanjian dengan PT Dayamitra Telekomunikasi
tanggal Januari 2021 untuk Pekerjaan Mitratel 1000T Bulk Order Tower dengan nilai kontrak sebesar Rp20,73 Miliar (TL14-20)
aj. Agreement with PT Dayamitra Telekomunikasi dated January 2021 for the Work of the Mitratel 1000T Bulk Order Tower with a contract value of Rp20.73 Billion (TL14-20)
ak. Perjanjian dengan PT PLN (Persero) Kantor Pusat tanggal November 2020, Nomor Kontrak 0334.PJ/DAN.02.02/010700/2019 untuk pekerjaan LOT 2: Transmisi 500 kV Cikupa – Kembangan dengan nilai kontrak sebesar Rp758,69 Miliar (TL02-19)
ak. Agreement with PT PLN (Persero) Head Office dated November 2020, Contract Number 0334.PJ/ DAN.02.02/010700/2019 for LOT 2:
500 kV Transmission Cikupa - Kembangan with a contract value of Rp758.69 Billion (TL02- 19)
42. PERIKATAN (lanjutan) 42. COMMITMENTS (continued)
al. Perjanjian dengan Steel Lampost tanggal Desember 2020, Nomor Kontrak PPC19120004 untuk pekerjaan Steel Lampost dengan nilai kontrak Rp30,25 Miliar (GC01-20)
al. Agreement with Steel Lampost dated December 2020, Contract Number PPC19120004 for Steel Lampost work with a contract value of Rp30.25 Billion (GC01-20)
am. Perjanjian dengan PT Hutama Karya Infrastruktur tanggal September 2020 untuk Pekerjaan Pengadaan dan Pemasangan Corrugated Steel Plate Proyek Tol Pekanbaru dengan nilai kontrak Rp21,96 Miliar (BA66-20)
am. Agreement with PT Hutama Karya Infrastruktur dated September 2020 for Procurement and Installation of Corrugated Steel Plate for the Pekanbaru Toll Project with a contract value of Rp21.96 Billion (BA66-20)
an. Perjanjian dengan PT Hutama Karya Infrastruktur tanggal Oktober 2020 untuk Pekerjaan Pengadaan, Pemasangan dan Pengiriman CSP Proyek Tol Binjai dengan nilai kontrak sebesar Rp26,43 Miliar (BA68-20)
an. Agreement with PT Hutama Karya Infrastruktur dated October 2020 for the work of Procurement, Installation and Delivery of CSP for the Binjai Toll Road Project with a contract value of Rp26.43 Billion (BA68-20)
ao. Perjanjian dengan CRBC – ADHI, Jo Nomor Kontrak PO-CRBC-1HE-0082 untuk Pekerjaan Pengadaaan Jembatan Steel Box Girder, Cisumdawu dengan nilai kontrak Rp17,28 Miliar (BA21-19)
ao. Agreement with CRBC - ADHI, Jo Contract Number PO-CRBC-1HE-0082 for the construction of the Steel Box Girder Bridge, Cisumdawu with a contract value of Rp17.28 Billion (BA21-19)
ap. Perjanjian dengan PT Pertamina Hulu Kalimantan Timur tahun 2021 untuk Pekerjaan Construction Support Call Out Services for KLO-PHKT (Tahun : 2019/2021) dengan nilai kontrak sebesar Rp54,11 Miliar (J152)
ap. Agreement with PT Pertamina Hulu Kalimantan Timur in 2021 for Construction Support Call Out Services for KLO-PHKT (Year: 2019/2021) with a contract value of Rp54.11 Billion (J152)
aq. Perjanjian dengan PT Wijaya Karya Bangunan Gedung, Tbk., tahun 2021 untuk Pekerjaan Struktur Atap Baja dengan nilai kontrak sebesar Rp125,01 Miliar (BA79-20)
aq. Agreement with PT Wijaya Karya Bangunan Gedung, Tbk., in 2021 for steel roof structure work with a contract value of Rp125.01 Billion (BA79-20)
ar. Perjanjian dengan PT Hutama Karya Infrastruktur tahun 2021 untuk Pekerjaan Struktur Jembatan Rangka Baja Sei Batang Serangan dengan nilai kontrak sebesar Rp66,63 Miliar (BA82-20)
ar. Agreement with PT Hutama Karya Infrastruktur in 2021 for the construction of a steel frame bridge structure for Sei Batang Serangan with a contract value of Rp66.63 Billion (BA82-20) as. Perjanjian dengan PT Takenaka Indonesia
sampai dengan April 2021, Nomor Kontrak OS.0006/20004-ETI/20 untuk pekerjaan PT Takenaka Indonesia Steel Structure Material – Eclat Project Kendal dengan nilai kontrak Rp35,04 Miliar (P182-20)
as. Agreement with PT Takenaka Indonesia until April 2021, Contract Number OS.0006/20004-ETI/ 20 for the work of PT Takenaka Indonesia Steel Structure Material - Eclat Project Kendal with a contract value of Rp35.04 Billion (P182-20)
at. Perjanjian dengan PT Pertamina Retail tahun 2021, No. Kontrak OS.0006/20004-ETI/20 untuk Pekerjaan Pengadaan Unit Pertashop 3 KL Generasi 3 – Pertamina Retail dengan nilai kontrak sebesar Rp 15,97 Miliar (P184-20)
at. Agreement with PT Pertamina Retail in 2021, Contract No. OS.0006/20004-ETI/20 For The Procurement of 3rd Generation 3 KL Pertashop Units - Pertamina Retail with a contract value of Rp15.97 Billion (P184-20)
au. Perjanjian dengan T.S.TECHNICAL & SUPPLY (2000) CO., LTD., No. Kontrak A244/BTU-TS/NST/II/2021 untuk PBB Glass Type + 33M Fixed Bridge For Nakorn Sri Thamarat, Thailand dengan nilai kontrak sebesar Rp8,84 Miliar (A244-21)
au. Agreement with T.S.TECHNICAL & SUPPLY (2000) CO., LTD., Contract No. A244/BTU-TS/NST/II/2021 For PBB Glass Type + 33M Fixed Bridge For Nakorn Sri Thamarat, Thailand with a contract value of Rp8.84 Billion (A244-21)
av. Perjanjian dengan PT Dayamitra Telekomunikasi No. Kontrak P14-PMT-L3-002/F-001 untuk Pekerjaan Mitratel 1000T Bulk Order Tower dengan nilai kontrak sebesar Rp63,15 Miliar (TL34-21)
av. Agreement with PT Dayamitra Telekomunikasi Contract No.P14-PMT-L3-002/F-001 for the Work of the Mitratel 1000T Bulk Order Tower with a contract value of Rp63.15 Billion (TL34-21)
aw. Perjanjian dengan PT Jaya Konstruksi Manggala Pratama, Tbk., tahun 2021 untuk Pekerjaan Pengadaan Gelagar Baja Persegi Menerus Proyek Penambahan Lajur Cikande dengan nilai kontrak sebesar Rp20,84 Miliar (BA88-21)
aw. Agreement with PT Jaya Konstruksi Manggala Pratama, Tbk., in 2021 for the Work on the Procurement of Continuous Square Steel girders for the Cikande Lane Addition Project with a contract value of Rp20.84 Billion (BA88-21)
ax. Perjanjian dengan PT Huawei Tech Investment, tahun 2021 untuk Pekerjaan Pengadaan Huawei 11210 Unit Mounting dengan nilai kontrak sebesar Rp189,03 Miliar (TL51-21)
ax. Agreement with PT Huawei Tech Investment, in 2021 for the Work on the Procurement of Huawei 11210 Unit Mounting with a contract value of Rp189.03 Billion (TL51-21)
ay. Perjanjian dengan PT Nusa Raya Cipta Tbk., sampai dengan Agustus 2022, No. Kontrak OS.0003/21003-ETI/21 untuk Pekerjaan Pembangunan Pabrik Pou Yuen Cianjur dengan nilai kontrak Rp125,34 Miliar (P188-21)
ay. Agreement with PT Nusa Raya Cipta Tbk., until August 2022, Contract No. OS.0003/21003-ETI/21 for the work of Factory Building Works Pou Yuen in Cianjur with a contract value of Rp125.34 Billion (P188-20)
az. Perjanjian dengan PT Pembangunan Perumahan (PERSERO) Tbk., tahun 2021 untuk Pekerjaan Proyek Jembatan BOGEG FO dan FO KA BOGEG dengan nilai kontrak sebesar Rp37,49 Miliar (BA104-21)
az. Agreement with PT Pembangunan Perumahan (PERSERO) Tbk., in 2021 for the Bridge Project Work for BOGEG FO dan FO KA BOGEG with a contract value of Rp37.49 Billion (BA104-21)