127 Mbus tbnga2 150 Load 160.063
128 Mbus tello1 150 Load 159.709
129 Mbus tello2 150 Load 159.709
130 Mbus tellolama1 150 Load 159.932
131 Mbus tellolama2 150 Load 159.932
132 Mbus tlasa1 150 Load 163.952
133 Mbus tlasa2 150 Load 163.952
134 pngp-brru1 150 Load 154.704
135 pngp-brru2 150 Load 154.704
136 Sbus pangkep1 70 Load 74.373
137 Sbus pangkep2 70 Load 74.373
138 Sbus pinrang1 150 Load 148.599
139 Sbus pinrang2 150 Load 148.599
140 Sbus soppeng 20 Load 19.818
141 Sbus tello1 30 Load 31.786
142 Sbus tello2 30 Load 31.786
143 Sbus tello3 70 Load 75.192
144 Sbus tello4 70 Load 75.192
145 Sbus tello5 70 Load 75.192
146 Sbus tellolama 70 Load 78.143
147 Sbus tlasa 20 Load 22.005
Tabel 4.10 Kondisi Bus sistem interkoneksi SULSEL dengan masuknya
2x50 MW PLTU Barru dan 2x100 M W PLTU Jeneponto (Pelepasan
lxvi
12 Buspltd palopo2 20 Load 19.254
13 Buspltd suppa1 12 Gen. 12
14 Buspltd suppa2 12 Gen. 12
15 Buspltu barru1 150 Load 147.698
16 Buspltu barru2 150 Load 147.698
17 Bus Sinjai 150 Load 152.864
18 Cbus daya 70 Load 75.227
19 Cbus pangkep 70 Load 74.893
20 Cbus tlama 70 Load 77.093
21 Gb alstm1 12 Gen. 12.635
22 Gb alstm2 12 Gen. 12.91
23 Gb barru1 20 Gen. 20
24 Gb barru2 20 Gen. 20
25 Gb bili1 12 Gen. 12.89
26 Gb bili2 12 Gen. 12.89
27 Gb bkru1 12 SWNG 12
28 Gb bkru2 12 SWNG 12
29 Gb cokdo1 12 Gen. 12.605
30 Gb cokdo2 12 Gen. 12.605
31 Gb mamuju 5 Gen. 4.819
32 Gb mitsbshi1 12 Gen. 12.605
33 Gb mitsbshi2 12 Gen. 12.605
34 Gb pltd masamba 5 Gen. 5
35 Gb pltg ge2 12 Gen. 12.605
36 Gb pltu1 12 Gen. 12.635
37 Gb pltu2 12 Gen. 12.635
38 Gb s11 12 SWNG 12
39 Gb s12 12 Gen. 12
40 Gb s18 12 Gen. 12
41 Gb s21 12 Gen. 12
42 Gb sawito 5 Gen. 5.044
43 Gb swd1 12 Gen. 12.605
44 Gb swd2 12 Gen. 12.605
45 gbuspltu jeen1 12 Gen. 14.146
46 gbuspltu jeen2 12 Gen. 14.146
47 Gb westc 12 Gen. 12.635
48 Lbus bak aru 20 Load 19.668
49 Lbus barru1 20 Load 19.531
50 Lbus barru2 20 Load 19.531
51 Lbus bntla1 20 Load 21.855
52 Lbus bntla2 20 Load 21.855
53 Lbus bntla3 20 Load 21.877
54 Lbus bone1 20 Load 19.695
55 Lbus bone2 20 Load 19.695
56 Lbus bos owa 150 Load 157.263
57 Lbus brloe 20 Load 21.484
58 Lbus bulukumba 20 Load 20.697
59 Lbus bwaja 20 Load 20.61
lxvii
60 Lbus day a1 20 Load 21.403
61 Lbus day a2 20 Load 21.444
62 Lbus jeneponto 20 Load 21.206
63 Lbus majene 20 Load 19.304
64 Lbus makale 20 Load 19.279
65 Lbus mamuju 20 Load 19.277
66 Lbus mandai1 20 Load 21.348
67 Lbus mandai2 20 Load 21.326
68 Lbus mros 20 Load 20.405
69 Lbus palopo 20 Load 19.254
70 Lbus pangkep 20 Load 20.938
71 Lbus pare 20 Gen. 20
72 Lbus pinrang1 20 Load 19.364
73 Lbus pinrang2 20 Load 19.489
74 lbus pltu jen 12 Load 12.945
75 Lbus pngkep 20 Load 20.938
76 Lbus pnk g1 20 Load 20.93
77 Lbus pnk g2 20 Load 20.969
78 Lbus polmas 20 Load 19.328
79 Lbus sengkang 20 Load 19.575
80 Lbus sgmnsa 20 Gen. 20.972
81 Lbus sidrap 20 Load 19.398
82 Lbus sinjai 20 Gen. 20.334
83 Lbus soppeng 20 Load 19.677
84 Lbus tbnga1 20 Load 20.931
85 Lbus tbnga2 20 Load 20.931
86 Lbus tello1 20 Load 20.903
87 Lbus tello2 20 Load 20.93
88 Lbus tlama1 20 Load 20.98
89 Lbus tlama2 20 Load 21.038
90 Lbus tlsa 20 Load 21.206
91 Lbus tonasa 70 Load 74.641
92 Mbus bakaru1 150 Load 147.654
93 Mbus bakaru2 150 Load 147.654
94 Mbus barru 150 Load 147.145
95 Mbus bone1 150 Load 148.201
96 Mbus bone2 150 Load 148.201
97 Mbus bosowa1 150 Load 157.263
98 Mbus bosowa2 150 Load 157.263
99 Mbus bulukumba1 150 Load 155.599
100 Mbus bulukumba2 150 Load 155.599
101 Mbus jeneponto1 150 Load 159.476
102 Mbus jeneponto2 150 Load 159.476
103 Mbus majene1 150 Load 145.176
104 Mbus majene2 150 Load 145.176
105 Mbus makale1 150 Load 145.153
106 Mbus makale2 150 Load 145.153
107 Mbus mamuju1 150 Load 145.019
lxviii
108 Mbus mamuju2 150 Load 145.019
109 mbus maros1 150 Load 153.206
110 mbus maros2 150 Load 153.206
111 Mbus palopo1 150 Load 144.702
112 Mbus palopo2 150 Load 144.702
113 mbus pangkep1 150 Load 157.558
114 Mbus pangkep2 150 Load 157.558
115 Mbus pare1 150 Load 146.43
116 Mbus pare2 150 Load 146.43
117 Mbus pinrang1 150 Load 145.563
118 Mbus pinrang2 150 Load 145.563
119 mbus pltu jenn 150 Load 161.815
120 Mbus polmas1 150 Load 145.39
121 Mbus polmas2 150 Load 145.39
122 Mbus sengkang1 150 Load 147.463
123 Mbus sengkang2 150 Load 147.463
124 Mbus sgmnsa1 150 Load 157.365
125 Mbus sgmnsa2 150 Load 157.365
126 Mbus sidrap1 150 Load 146.389
127 Mbus sidrap2 150 Load 146.389
128 Mbus soppeng1 150 Load 147.614
129 Mbus soppeng2 150 Load 147.614
130 Mbus tbnga1 150 Load 157.276
131 Mbus tbnga2 150 Load 157.276
132 Mbus tello1 150 Load 157.563
133 Mbus tello2 150 Load 157.563
134 Mbus tellolama1 150 Load 157.784
135 Mbus tellolama2 150 Load 157.784
136 Mbus tlasa1 150 Load 159.293
137 Mbus tlasa2 150 Load 159.293
138 pngp-brru1 150 Load 147.532
139 pngp-brru2 150 Load 146.957
140 Sbus pangkep1 70 Load 74.893
141 Sbus pangkep2 70 Load 74.893
142 Sbus pinrang1 150 Load 146.626
143 Sbus pinrang2 150 Load 146.626
144 Sbus soppeng 20 Load 19.677
145 Sbus tello1 30 Load 31.588
146 Sbus tello2 30 Load 31.588
147 Sbus tello3 70 Load 75.309
148 Sbus tello4 70 Load 75.309
149 Sbus tello5 70 Load 75.309
150 Sbus tellolama 70 Load 77.093
151 Sbus tlasa 20 Load 21.206
Keterangan :
: Normal
: Mendekati kritis
: Kritis
lxix
Tabel 4.11 Kondisi Bus sistem interkoneksi SULSEL dengan masuknya 2x50 MW PLTU Barru (Pelepasan Generator Parepare)
No Bus ID Nominal kV Type Voltage (KV )
1 Bus bntla 70 Load 71.979
2 Bus brloe 70 Load 70.137
3 Bus bwja 30 Load 29.391
4 Bus daya1 70 Load 70.138
5 Bus daya2 70 Load 70.138
6 Bus mandai 70 Load 69.87
7 Bus panakuk ang 150 Load 147.672
8 Buspltd arena1 20 Gen. 20
9 Buspltd arena2 20 Gen. 20
10 Buspltd mamuju 20 Load 19.352
11 Buspltd pajlseng 20 Gen. 20
12 Buspltd palopo2 20 Load 19.26
13 Buspltd suppa1 12 Gen. 12
14 Buspltd suppa2 12 Gen. 12
15 Buspltu barru1 150 Load 147.33
16 Buspltu barru2 150 Load 147.33
17 Bus Sinjai 150 Load 147.317
18 Cbus daya 70 Load 70.138
19 Cbus pangkep 70 Load 70.126
20 Cbus tlama 70 Load 72.277
21 Gb alstm1 12 Gen. 11.807
22 Gb alstm2 12 Gen. 12.032
23 Gb barru1 20 Gen. 20
24 Gb barru2 20 Gen. 20
25 Gb bili1 12 Gen. 12.013
26 Gb bili2 12 Gen. 12.013
27 Gb bkru1 12 SWNG 12
28 Gb bkru2 12 SWNG 12
29 Gb cokdo1 12 Gen. 12
30 Gb cokdo2 12 Gen. 12
lxx
31 Gb mamuju 5 Gen. 4.838
32 Gb mitsbshi1 12 Gen. 11.817
33 Gb mitsbshi2 12 Gen. 12
34 Gb pltd masamba 5 Gen. 5
35 Gb pltg ge2 12 Gen. 12
36 Gb pltu1 12 Gen. 11.807
37 Gb pltu2 12 Gen. 11.807
38 Gb s11 12 SWNG 12
39 Gb s12 12 Gen. 12
40 Gb s18 12 Gen. 12
41 Gb s21 12 Gen. 12
42 Gb sawito 5 Gen. 5.058
43 Gb swd1 12 Gen. 12
44 Gb swd2 12 Gen. 11.817
45 Gb westc 12 Gen. 11.807
46 Lbus bak aru 20 Load 19.733
47 Lbus barru1 20 Load 19.517
48 Lbus barru2 20 Load 19.517
49 Lbus bntla1 20 Load 20.49
50 Lbus bntla2 20 Load 20.49
51 Lbus bntla3 20 Load 20.51
52 Lbus bone1 20 Load 19.557
53 Lbus bone2 20 Load 19.557
54 Lbus bos owa 150 Load 147.039
55 Lbus brloe 20 Load 20.022
56 Lbus bulukumba 20 Load 19.585
57 Lbus bwaja 20 Load 19.21
58 Lbus day a1 20 Load 19.955
59 Lbus day a2 20 Load 19.993
60 Lbus jeneponto 20 Load 20
61 Lbus majene 20 Load 19.379
62 Lbus makale 20 Load 19.286
63 Lbus mamuju 20 Load 19.352
64 Lbus mandai1 20 Load 19.915
65 Lbus mandai2 20 Load 19.895
66 Lbus mros 20 Load 19.588
67 Lbus palopo 20 Load 19.26
68 Lbus pangkep 20 Load 19.552
69 Lbus pinrang1 20 Load 19.42
70 Lbus pinrang2 20 Load 19.544
71 Lbus pngkep 20 Load 19.552
72 Lbus pnk g1 20 Load 19.623
73 Lbus pnk g2 20 Load 19.659
74 Lbus polmas 20 Load 19.403
75 Lbus sengkang 20 Load 19.66
76 Lbus sgmnsa 20 Gen. 20
77 Lbus sidrap 20 Load 19.406
78 Lbus sinjai 20 Gen. 20
lxxi
79 Lbus soppeng 20 Load 20
80 Lbus tbnga1 20 Load 19.631
81 Lbus tbnga2 20 Load 19.631
82 Lbus tello1 20 Load 19.597
83 Lbus tello2 20 Load 19.558
84 Lbus tlama1 20 Load 19.669
85 Lbus tlama2 20 Load 19.723
86 Lbus tlsa 20 Load 20
87 Lbus tonasa 70 Load 69.864
88 Mbus bakaru1 150 Load 148.147
89 Mbus bakaru2 150 Load 148.147
90 Mbus barru 150 Load 147.034
91 Mbus bone1 150 Load 147.16
92 Mbus bone2 150 Load 147.16
93 Mbus bosowa1 150 Load 147.039
94 Mbus bosowa2 150 Load 147.039
95 Mbus bulukumba1 150 Load 147.238
96 Mbus bulukumba2 150 Load 147.238
97 Mbus jeneponto1 150 Load 147.463
98 Mbus jeneponto2 150 Load 147.463
99 Mbus majene1 150 Load 145.738
100 Mbus majene2 150 Load 145.738
101 Mbus makale1 150 Load 145.207
102 Mbus makale2 150 Load 145.207
103 Mbus mamuju1 150 Load 145.58
104 Mbus mamuju2 150 Load 145.58
105 mbus maros1 150 Load 147.071
106 mbus maros2 150 Load 147.071
107 Mbus palopo1 150 Load 144.755
108 Mbus palopo2 150 Load 144.755
109 mbus pangkep1 150 Load 147.133
110 Mbus pangkep2 150 Load 147.133
111 Mbus pare1 150 Load 146.529
112 Mbus pare2 150 Load 146.529
113 Mbus pinrang1 150 Load 145.981
114 Mbus pinrang2 150 Load 145.981
115 mbus pltu jenn 150 Load 147.526
116 Mbus polmas1 150 Load 145.952
117 Mbus polmas2 150 Load 145.952
118 Mbus sengkang1 150 Load 148.103
119 Mbus sengkang2 150 Load 148.103
120 Mbus sgmnsa1 150 Load 147.593
121 Mbus sgmnsa2 150 Load 147.593
122 Mbus sidrap1 150 Load 146.445
123 Mbus sidrap2 150 Load 146.445
124 Mbus soppeng1 150 Load 147.747
125 Mbus soppeng2 150 Load 147.747
126 Mbus tbnga1 150 Load 147.509
lxxii
127 Mbus tbnga2 150 Load 147.509
128 Mbus tello1 150 Load 147.719
129 Mbus tello2 150 Load 147.719
130 Mbus tellolama1 150 Load 147.926
131 Mbus tellolama2 150 Load 147.926
132 Mbus tlasa1 150 Load 147.576
133 Mbus tlasa2 150 Load 147.576
134 pngp-brru1 150 Load 147.133
135 pngp-brru2 150 Load 147.133
136 Sbus pangkep1 70 Load 70.126
137 Sbus pangkep2 70 Load 70.126
138 Sbus pinrang1 150 Load 146.72
139 Sbus pinrang2 150 Load 146.72
140 Sbus soppeng 20 Load 20
141 Sbus tello1 30 Load 29.517
142 Sbus tello2 30 Load 29.517
143 Sbus tello3 70 Load 70.185
144 Sbus tello4 70 Load 70.185
145 Sbus tello5 70 Load 70.185
146 Sbus tellolama 70 Load 72.277
147 Sbus tlasa 20 Load 20
Tabel 4.12 Kondisi Bus sistem interkoneksi SULSEL dengan masuknya 2x100 MW PLTU Jeneponto (Pelepasan Gene rator PLTD Arena)
No Bus ID Nominal kV Type Voltage (KV )
1 Bus bntla 70 Load 77.13
2 Bus brloe 70 Load 74.739
3 Bus bwja 30 Load 31.435
4 Bus daya1 70 Load 74.679
5 Bus daya2 70 Load 74.679
6 Bus mandai 70 Load 74.306
7 Bus panakuk ang 150 Load 158.238
8 Buspltd arena1 20 Load 21.5
9 Buspltd arena2 20 Load 21.5
10 Buspltd mamuju 20 Load 19.552
11 Buspltd pajlseng 20 Gen. 20.107
12 Buspltd palopo2 20 Load 19.686
13 Buspltd suppa1 12 Gen. 11.993
14 Buspltd suppa2 12 Gen. 11.993
15 Buspltu barru1 150 Load 152.783
16 Bus Sinjai 150 Load 157.075