I 16.2 GST
Schedule 1 Development Contributions
(Clause
4 and Clause17.1)
TableColumn 1 Column 2 Column 3 Column 4 Column 5 Column 6
Item Contributions Plan
Description
Public purpose When contribution is ValueNumber Identification
required
(as at a base date of 1 July2016, as per clause 4.3(b)) 9 BH03C Detention basin works referred to in DA Water Immediately prior to the issue $5,411,654
Drainage structure 1327/2011ZB as are comprised in BH03C management of the Subdivision Certificate shown in Sheet 004,
Figure
6: Location of for the creation of the first facilities contained in the Contributions Final Lot inStage
1Plan as at the date of this Agreement.
10 RGBH10 Construction of a raingarden within Water Immediately prior to the issue $1,661,000
’Raingarden (in playing fields that is: management of the Subdivision Certificate BHPF01)’ .approximately
8,850m2
in area across for the creation of the firsttwo separate
raingardens;
Final Lot in Stage 2.generally consistent with the drainage engineering plans submitted with DA 1509/2015/JPZ
.generally in the location shaded blue and marked with a ’10’ on the Indicative Layout Plan.
22 CR-D ’Culvert Construction of a bridge for the crossing Water Immediately prior to the issue $2,804,000 Crossing D" of Mount Carmel Road over a riparian management of the Subdivision Certificate
corridor that is: for the creation of the first
.
generally
consistent with the road and Final Lot inStage
2 drainage engineering plans approvedby DA 1509/2015/JPZlB as
amended); and
.generally in the location marked with
a solid yellow line and identified with
a ’22’ on the Indicative Layout Plan.
Planning Agreement I 33
Column 1 Column 2 Column 3 Column 4 Column 5 Column 6 Item Contributions Plan
Description
Public purpose When contribution is ValueNumber Identification
required
(as at a base date of 1 July2016, as per clause 4.3(b)) 29 BHNR01A ’New Construction of Mount Carmel Road Transport
Immediately
prior to the issue $8,103,050Main Road - Mt between Windsor Road and Killarney of the Subdivision Certificate Carmel Road - Chain of Ponds, such that is: for the creation of the first Windsor Road to
.generally consistent with the road Final Lot in
Stage
2 Killarney Chain ofengineering plans approved
by
DAPonds’
573/20171ZB (as amended); and
.
generally
in the location marked yellow and identified with a ’29’ on the Indicative Layout Plan30 BHNR01 B ’New Construction of Mount Carmel Road Transport Immediately prior to the issue $5.495,172 Main Road - Mt between Killarney Chain of Ponds and of the Subdivision Certificate
Carmel Road - Mason Road, such that is: for the creation of the first Killarney Chain of .generally consistent with the road Final Lot in Stage 2 Ponds to Mason
engineering plans approved by Road"
573/20171ZB (as amended); and
.generally in the location marked yellow and identified with a ’30’ on the Indicative Layout Plan.
31 BHNR02A ’New Construction of Mount Carmel Road Transport Immediately prior to the issue $8,369,160 Main Road - Mt between Mason Road and the Boundary of the Subdivision Certificate
Carmel Road - Road link road, such that is: for the creation of the first Mason Road to
.generally consistent with the road Final Lot in
Stage
2 Boundary Road engineering plans approved by DA"Link Road’"
573/20171ZB (as amended); and
.generally in the location marked
yellow
and identified with a ’31’ on the Indicative Layout Plan.65 BR-1 ’Mt Carmel Construction of a bridge for Mount Transport Immediately prior to the issue $7,403,400 Road
Bridge
over Carmel Road Killarney Chain of Ponds of the Subdivision CertificateKillarney Chain of that is: for the creation of the first
Ponds’
.generally consistent with the road Final Lot in Stage 2 engineering plans approved by DA
Planning Agreement I 34
3436-5856-5131, v. 1
Column 1 Column 2 Column 3 Column 4 Column 5 Column 6
Item Contributions Plan
Description
Public purpose When contribution is ValueNumber Identification
required
(as at a base date of 1 July2016, as per clause 4.3(b)) ZB573/20171ZB (as amended); and
. generally in the location marked with purple lines and identified with a ’65’
on the Indicative Layout Plan.
72 BHT07 ’Mt Carmel Construction of a roundabout at the Transport
Immediately
prior to the issue $435,104 Road I Mason intersection of Mount Carmel Road and of the Subdivision CertificateRoad’ Mason Road that is: for the creation of the first
.
generally
consistent with the road Final Lot inStage
2engineering
plans submitted with DA1509/2015/JPZ and
.generally in the location marked with a pink circle and identified with a ’72’
on the Indicative Layout Plan.
73 BHT08 ’Mt Carmel Construction of a roundabout at the Transport
Immediately
prior to the issue $435,104 Road I Boundary intersection of Mount Carmel Road and of the Subdivision CertificateRoad Link’ the
Boundary
Road link road that is: for the creation of the first.generally consistent with the road Final Lot in
Stage
2 engineering plans for Stage 1submitted with DA 1509/2015/JPZ;
and
.
generally
in the locati n marked with a pink circle and identified with a ’73’on the Indicative Layout Plan.
74 BHT09 ’Mt Carmel Construction of a roundabout at the
Transport Immediately
prior to the issue $435,104 Road I George intersection of Mount Carmel Road and of the Subdivision CertificateStreet’
George
Street that is: for the creation of the first.of a nature that is generally consistent Final Lot in
Stage
7with Item 73 ; and
.generally in the location marked with a pink circle and identified with a ’74’
on the Indicative Layout Plan.
Planning Agreement I 35
3436-5856-5131. v. 1
Column 1 Column 2 Column 3 Column 4 Column 5 Column 6
Item Contributions Plan
Description
Public purpose When contribution is ValueNumber Identification required (as at a base date of 1 July
2016, as per clause 4.3(b)) 81 BHT17 ’Mt Carmel Construction of a roundabout at the Transport Immediately prior to the issue $435,104
Road / Future intersection of Mount Carmel Road and of the Subdivision Certificate Business Park future business park road that is: for the creation of the first Road’
.generally consistent with the road Final Lot in Stage 2 engineering plans approved by DA
573/2017/ZB (as amended); and
.
generally
in the location marked with a black circle and identified with a ’81’on the Indicative Layout Plan.
29L Refer to Item 29 Dedication of the area of land on which Transport If dedication is to be effected $1,187,184
above Item 29 is constructed. by the registration of a plan of
subdivision under section 9(2) of the Roads Act 1993- upon the registration of the plan of subdivision creating the Final Lot referred to in Column 5 for Item 29.
Otherwise - at the same
point-in-time as specified in Column 5 for Item 29.
30L Refer to Item 30 Dedication of the area of land on which Transport If dedication is to be effected $497,236
above Item 30 is constructed. by the registration of a plan of
subdivision under section 9(2) of the Roads Act 1993 - upon the
registration
of the plan of subdivision creating the Final Lot referred to in Column 5 for Item 30.Otherwise - at the same
point-in-time as specified in Column 5 for Item 30.
31L Refer to Item 31 Dedication of the area of land on which Transport If dedication is to be effected $1,255,816
above Item 31 is constructed. by the registration of a plan of
Planning Agreement I 36
3436-5856-5131, v. 1
Column 1 Column 2 Column 3 Column 4 Column 5 Column 6
Item Contributions Plan
Description
Public purpose When contribution is ValueNumber Identification
required
(as at a base date of 1 July2016, as per clause 4.3(b)) subdivision under section
9(2)
of the Roads Act 1993 - upon the registration of the
plan
of subdivisioncreating
the Final Lot referred to in Column 5 for Item 31.
Otherwise - at the same
point-in-time as specified in Column 5 for Item 31.
Planning Agreement I 37
3436-5856-5131. v. 1
I Schedule 2
-Drawings I
(Clause 17)
Sheet 1: Site detailsI
TI’
1m’
I 1~ ~
,
I
.7";~~~
lilt\?’ .J(~~
I ~I
~~
.;
---_..:.._:
~ , j ,.
I
~
I
I
,. "-~I
,~;j!
I
~~
-,-.
;:’
~
g-
ro...
~--:---!
~
:
I
." ..::~~
:=li~~r.
I ~~~
c..O~.J
.--\"
’:’ ’=’
--~
~~
-9’.
"’b!i ,-
I """’:"":z:.:’;.:::’::"
./ J3
~:~~
I
-~I. ~ ,l~~ S~.~
11: ~:
~,~
..~
I I I
I
Planning Agreement I~
"-
’"
t;!
~
51 :’i
c
~
~
=>
’"
o J:
\Jil
, i , ,
!i ~
.
I
:
:
~T:
o.
il ~~
.
~~
<
~~~
. 4.,. "t
:"~
;=1
=:
~;; \~
:t~
.
’..
’t...
U~{
....\;e=~:..~:..
~1~
","P"
t4t~t
..’.~.
38
I I
",,~.f.
"-
\\
:~~
".~\
\
\
I \
I I
?\i’
OLD
.=~
.., .(
Ii’
’"
~::
Q
..
TOI"N
RO~O
k to’ ". .’1 .... .,1
I I I I I I I I I I I
~
t.1
...
1;
===-
;,<
:r
~ {l{lIl~ d<I ..
;E
..
~I J~
~e..~
~
~
. ~.t ""’:’lI ~ro
",
>- rr
~
;,-li
~~
~~
~
("~i
(I)~’
~:5
/1
’"
a.
~
. ’...’ .0
=-
~
.(!~
,!- -~
h~’::.(ll oJ IT
"
0.
" 0’
-!;!
~’L!!’ :I:
-.rl!’ .8 ,
.’l Z ~.~ ~:,;
",p .Ie
~
~ rt.
i
0
~
g -’I l
~
Q.
::>
0 z
~
..
-’
...
Q.
0 ::>
...
.,
:S
’"
~
0 2::
\Jl1
~.
!
Ii :!
;: I
!
j
~
;:
E
~~
~"
~;
,.
~~
~
"I ~;
~: ~;
H
~j;.
; ~ ...r
~ ~
~i
~~
II t~
’" t
;;~ ~
q I~~
~ ~ ,
’l
"t. .... _ ..
I I
’,,~,
ij~
1lm
I
3436-5856-5131, v. 1