• Tidak ada hasil yang ditemukan

Data Requirements for Selected Building Sub-Systems

10. Appendix 1

10.1 Data Requirements for Selected Building Sub-Systems

The Express-G represe

number of the selected building sub-systems are documented in this Appendix, and the abbreviation AC is often used to denote

For example, the overall Water Supply system can be represented as below in Figure 47, with constituent parts as shown in Figure 48and Figure 49 below.

Figure 47: Water Supply System

CW Tank Room Space

The Hot Water Supply sub-system can be represented as belo Figure 48: Hot W

Occupancy

OccupancyType

occType

INTEGER population

HotWaterTank Space

REAL requiredCapacity

Required HWS Capacity Required HWS Capacity

HW Tank e Room Spac

HW Tank e Room Spac

HotWaterTank Space

REAL REAL REAL

actualCapacity headRoom area

CW Tank Room Space

REAL

ColdWaterTank Space

area

REAL REAL

actualCapacity headRoom

total Tank Room Space

total Tank Room Space

ColdWaterTank Space

HW Tank Room Space

HW Tank Room Space

HotWaterTank Space

REAL REAL REAL

actualCapacity headRoom area

REAL REAL

REAL area

actualCapacity headRoom

sub-system can be represented as below in Figure 49.

Figure 49: Cold Water Supply And the Cold Water Supply

Similarly, the Fire Protection system can be represented as below in Figure 50.

Figure 50: Fire Protection

Elevated_

Storage_Tank

B O O LEAN is_required H ydra n ts

B O O L E A N is N eed ed

Storeys

INTEGER totalNumber

Is Hydrant required?

Is Hydrant required?

Water supply sufficient?

Water supply sufficient?

is Tank Required?

is Tank Required?

WaterSupply

BOOLEAN isAdequate Building

REAL height

WaterSupply

REAL pressure

Occupancy OccupancyType

occType

INTEGER population

ColdWaterTank

Building

REAL totalFloorArea

Required CWS Capacity Required CWS Capacity

Space

REAL requiredCapacity

CW Tank om Space Ro

CW Tank om Space Ro

Required CWS For Air conditioning Required CWS

For Air

conditioning ColdWaterTank Space

REAL requiredCapacity

ColdWaterTank Space

REAL REAL

REAL area

actualCapacity headRoom

Required CWS For Fire Protection Required CWS

For Fire

Protection ColdWaterTank Space

REAL requiredCapacity Elevated_

Storage_Tank

BO O LEAN is_required

Figure 51: Vertical Transport

Building

REAL

INTEGER

numberOfStoreys_der totalHeight_der

Occupancy

OccupancyType occType

Occupancy

OccupancyType occType

INTEGER population

Type of Lift Type of Lift

Required Number Of

Lifts Required Number Of

Lifts

Storey

floorArea REAL

Bldg

INTEGER

numberOfLifts REAL

hasWeightCapacity

Lift

TypeOfLift hasAType

Figure 52: Vertical Transport (2)

Bldg

INTEGER numberOfLifts Lift

TypeOfLift hasAType

REAL hasWeightCapacity

Required Motor Room

Area Required Motor Room

Area

Required Lift Shaft Required Lift Shaft

Required Lobby Size

Required Lobby Size

Bldg

REAL

height Alternative/more

Detailed view ->next slide

LiftMotorRoom

REAL area

LiftShaft

REAL height

Lobby

REAL

REAL REAL A

B C

Figure 53 : Vertical Transport (2A)

Figure 54 : Electrical Power LiftMotorRoom

REAL area Lift

INTEGER carSize

Due to project time constraints, although their Express-G representations have been specified, the Power sub-system and the Total Plant Room sub-system have not yet been implemented in software.

GroupOfLift

INTEGER numberOfLifts

Required Motor Room

Area Required Motor Room

Area

Required Overrun &

HeadRoom Required Overrun &

HeadRoom

Required Lobby Size

Required Lobby Size Lift

INTEGER carSize

Bldg

INTEGER numberOfFloors

Required Lift Shaft Dimension Required Lift Shaft Dimension

OverRun_

HeadRoom

REAL REAL

REAL H

X Y

Bldg

REAL height

LiftShaft

REAL height Lobby

REAL

REAL REAL A

B C

Occupancy

OccupancyType occType

Storey

floorArea REAL

ElectricalSystem

Estimate

REAL load Load

Estimate Load

Required Type of Substation

Required Type of Substation ElectricitySupply

REAL capacity

Site

STRING location

Substation

SubstationType hasType

Required Plant Room

Space Required Plant Room

Space

ElectricalPlant RoomSpace

XDim REAL

YDim REAL

ZDim REAL

The anticipated Air Conditioning (AC) requirements for a building can be calculated at early design stage using the following logic of Figure 55, and the component sub-systems depicted in the following figures.

Figure 55 : Overall Air Conditioning (AC) Constituents

Figure 56 : ‘Guesstimate’ of Plant Room Space Guesstimate

Plant Room Space Guesstimate

Plant Room Space

Zone Building

Zone

Building Select

System Select System Loads &

Airflows Loads &

Airflows

Major Duct

Size Major

Duct Size

Pipe Size Pipe Size AC Plant

Room Space AC Plant

Room Space

Masonry Shaft Area Masonry

Shaft Area

Bldg

R EA L totalFloorArea

S T R IN G b ld g _ typ e

Est_

ACPlantRoom

REAL REAL

area height Guesstimate

Plant Room Space Guesstimate Plant Room

Space

Figure 57 : AC Zones for Building

BldgStorey

REAL totalArea

BldgStorey A irC Zone hasAC Zones

Features hasFeatu res

BldgStorey A irC Zone

h asAC Zon es

Features

h asFeatu res

Zone Type Zone

Type Perimeter

Zone Depth Perimeter

Zone Depth

Internal Zone Division Internal Zone Division

BldgStorey A irC Zone hasAC Zones

Features hasFeatures

Figure 58 : AC Load and Airflow

BldgStorey

REAL totalArea

Bldg

LoadType hasTypeLoad

AirCondZone

BOOLEAN hasGlazedFacade GlazedFacadeOrientation

hasOrientation

REAL area

OccupancyT has Building

Type Load Building

Type Load

Loads And Airflow

Loads And Airflow

Site

location STRING

ACLoads

REAL REAL

heating cooling

Ventilation

REAL airFlow Storeys

INTEGER numberOfGlazedFacade

Figure 59 : AC System Selection

Figure 60 : AC Plant Room Space AirConditioning_

System

Complexity

Bldg has

OccupcyType has

A C Zones

IN T EG ER

ZoneO ccupancyT num berOfZones

hasOccupancy

Air Conditioning

Complexity Air Conditioning

Complexity

Air Conditioning

System Air Conditioning

System energySource

system has

ACLoads

REAL REAL

heating cooling

AirConditioning_

System

AirHandlingUnit isType

AHU

hasAHU

ACLoads

REAL REAL heating cooling

Ventilation REAL airFlow

AC System Properties

AC System Properties

AirConditioning_

System

AHU

STRING Dimensions location hasDimensions

hasAHU AirConditioning_

System

AirHandlingU nit isType AHU

hasAHU

Plant Room Space Required Plant Room

Space Required

ACLoads

REAL REAL heating cooling

ACSystem

ACcentralType

hasType Auxiliaries Space Required Auxiliaries

Space Required

Auxiliaries

REAL REAL area height

ACPlantRoom

REAL REAL

REAL

X Y

Z

Figure 61 : Total Plant Room Space

Figure 62 : Masonry Shaft

h a s T y p e A C cen tralT yp e

A irC S ys tem

B u ild in g S tey

is A d ja c e n tT o

R E A L a re a

SupplyAirEnclosure

REAL area

Masonry Shaft superficies

Masonry Shaft superficies

ReturnAirShaft

REAL area

El Ro

ectricalPlant omSpace

XDim REAL

YDim REAL

ZDim REAL

ACPlantRoom Space

REAL REAL

REAL X Y

Z

ColdWaterTank Space

REAL REAL

REAL area

actualCapacity headRoom

Total Plant Room

Space Required

Total Plant Room

Space Required

PlantRoom

REAL REAL REAL

X Y

Z

Dokumen terkait