LOT 1 600 M²

LOT 2 565 M²

LOT 3 980 M²

LOT 4 830 M²

LOT 5 1180 M²

LOT 6 1350 M²

LOT 7 790 M²

LOT 8 770 M²

LOT 12 2740 M²

LOT 13 2910 M²

LOT 14 2390 M²

LOT 15 2320 M²

LOT 16 2200 M²

LOT 17 2430 M²

LOT 18 2130 M² LOT 20

2040 M²

LOT 21 2640 M²

LOT 23 5.82 Ha LOT 19

2260 M²

LOT 9 815 M²

LOT 10 2030 M²

LOT 11 2280 M²

LOT 22 3300 M² HILL STREET

Checked:

Approved:

Date:

No Amendment Date

Notes

(1) Verify all dimensions on site.

Job Title

Drawing Title

Scale:

Job No:

DWG

Sheet of Design:

Drawn:

at A1

HILL ST

LAYOUT PLAN

1:750

10823

1

1 3

RJG RJG ML

24/05/17

(3) Contractor to locate all existing services prior to start of construction. Contractor also

responsible to protect throughout construction

PROPOSED SECTION R . POLLOCK

(2) Do not scale from drawing.

(4) All works undertaken in existing legal roads requires a road opening notice and traffic management plan to the approval of the Tasman District Council. It shall be the contractors sole responsibility to obtain all consents and arrange for all traffic management plans.

/ /

1 Fuji Court

PO Box 2144, Stoke NELSON

[email protected]

Surveying

Phone: (03) 928 0213

Management Design

APPROVED

Referensi

Dokumen terkait

Of the six variables, three variables: drainage system, traffic load and maintenance of roads has an average value / mean more than 4 and very influential on road pavement

Another important issue is the navigation aid for ordinary road users after traffic incidents occur. Because the hazards caused by the incidents could make certain roads blocked,

A number of congested roads in a large road network area in Bandung, Indonesia were used as a case study to evaluate the impact of VMS on drivers’ behaviour and on