• Tidak ada hasil yang ditemukan

PERENCANAAN ULANG (REDESIGN) STRUKTUR ATAS JEMBATAN KAMPUS III UNIVERSITAS MUHAMMADIYAH MALANG DENGAN METODE JEMBATAN BUSUR BETON

N/A
N/A
Protected

Academic year: 2017

Membagikan "PERENCANAAN ULANG (REDESIGN) STRUKTUR ATAS JEMBATAN KAMPUS III UNIVERSITAS MUHAMMADIYAH MALANG DENGAN METODE JEMBATAN BUSUR BETON"

Copied!
1
0
0

Teks penuh

(1)

PERENCANAAN ULANG (REDESIGN) STRUKTUR ATAS

JEMBATANKAMPUS III UNIVERSITAS MUHAMMADIYAH

MALANGDENGAN METODE JEMBATAN BUSUR BETON

Oleh: ABDUL GOFUR HADI SISWANTO ( 02520034 )

Civil Engineering Dibuat: 2008-08-07 , dengan 3 file(s).

Keywords: Jembatan, Busur, Beton Bertulang.

Jembatan busur direncanakan untuk memberikan sistem konstruksi struktur atas jembatan yang kuat dan lendutan yang kecil. Perencanaan meliputi dimensi dan penulangan pada lantai

kendaraan, gelagar, balok vertikal, dan balok busur.

Perhitungan perencanaan balok busur berdasarkan kombinasi momen lentur dan gaya aksial. Total beban merata yang bekerja q = 9.662 t/m’ dan beban terpusat P = 22.752 ton . Momen

maksimum maksimum yang terjadi (Mu) = 47.807 t.m’, gaya aksial yang terjadi (Pu) = 588.281

ton.

Perencanaan jembatan busur dengan panjang 25 m dan lebar 8 m didapatkan hasil perencanaan antara lain untuk gelagar memanjang, bentang bersih 3160 mm, dimensi beton 300 x 500 (mm), tulangan pada daerah tumpuan dipakai 5 Ø 25 dan pada daerah lapangan dipakai 4 Ø 25, untuk sengkang dipakai tulangan Ø 12. Untuk gelagar melintang, bentang bersih 5700 mm dengan dimensi beton 500 x 750 (mm), tulangan pada daerah tumpuan dipakai 10 Ø 25, pada daerah lapangan dipakai 6 Ø 25, untuk sengkang dipakai tulangan Ø 12.

Untuk elemen vertical didapatkan dimensi beton 500 x 500 (mm), menggunakan tulangan 8 Ø 25 yang dipasang simetris. Untuk busur didapatkan dimensi beton 550 x 1200 (mm) dengan

tulangan 28 Ø 25. Untuk sengkang digunakan Ø 12.

The planning of Arc Bridge to give upper structures construction system is strong and displacement is very small. The covers of This planning is how many dimension and reinforcement needed for floor carriage, floor beam, vertical beam, and arc beam.

Based calculation of planning of arc is bending moment and axial force combination. Total payload flattens working q = 9662 t/m ' and point load P = 22752 tons . Maximum moment happened is (Mu) = 47807 tm', axial force happened is ( Pu) = 588281 tons.

Planning of arc bridge with length 25 m and width 8 m is got result of planning for example for floor beam length, unfolds cleanness 3160 mm, concrete dimension 300 x 500 ( mm),

reinforcement at fulcrums area is used 5 Ø 25 and at field area is used 4 Ø 25, to stirrup area is used Ø 12. For athwart beam, unfolds cleanness 5700 mm with concrete dimension 500 x 750 ( mm), reinforcement at fulcrums area is used 10 Ø 25, at field area is used 6 Ø 25, to stirrup area is used Ø 12.

Referensi

Dokumen terkait

12. Six points are chosen on two parallel lines x and y, as follows: 4 points are on line x and two points are on line y. For each point on line y, we have 6 ways of

Berdasarkan konsep sikap, untuk mewujudkan pelayanan prima kepada pelanggan/masyarakat perlu memperlihatkan kemampuan diri dan penampilan seseorang atau kelompok secara

• Makalah yang dipublikasikan pada forum akademik atau jurnal ilmiah minimum berjumlah 5 buah. • KBI melakukan penjajakan kerjasama dengan institusi lain dalam rangka

Sayangnya, dalam kasus Marni tidak ditemukan di rekam medisnya keterangan apakah dia bekerja atau tidak, atau kondisi

yang diteliti, 12 melalui wawancara dengan narasumber terkait penerapan prinsip kehati-hatian dalam membuat akta otentik dikaitkan dengan Pasal 34 Peraturan Kepala

serta memberi jawaban atas permasalahan-permasalahan hukum, terutama yang terkait dengan akibat hukum perceraian terhadap kedudukan perempuan dari perkawinan nyerod

Alhamdulillah, puji syukur saya panjatkan kehadirat Allah SWT., atas segala karunia dan ridho-NYA, sehingga tesis dengan judul “Hubungan Faktor Sosiodemografi dan

Dalam penulisan ilmiah ini penulis akan menjelaskan tentang pembuatan tes IQ yang diletakkan di Jaringan Internet dengan menggunakan ASP, Dreamweaver dan Photoshop. Situs ini