PERENCANAAN KEBUTUHAN BAHAN BAKU DENGAN METODE

MATERIAL REQUIREMENT PLANNING (MRP I) (Studi Kasus Perusahaan

Raket

”ROTAX”)

Oleh: ANDRI CAHYADI ( 04540026 )

Dept. of Industrial Engineering

Dibuat: 2010-01-26 , dengan 8 file(s).

Keywords: Kata Kunci :Jadwal Induk Produksi, Material Requirement Planning, FPR, Lot For Lot, Single Exponential smoothing.

Perusahaan Raket ”ROTAX” Malang, merupakan industri manufaktur yang memproduksi Raket

Bulutangkis yang bersifat kontinyu, Permasalahan yang muncul pada perusahaan adalah sering kali kekurangan stock bahan baku serta berbagai macam bahan material yang diperlukan, maka perlu dilakukan perencanaan pengadaan kebutuhan material yang baik.

Dari kondisi tersebut diperlukan suatu metode untuk mengatasi masalah tersebut. Material Requirement Planning merupakan salah satu teknik yang membahas perencanaan bahan baku dengan memanfaatkan informasi tentang ketergantungan pada permintaan untuk manajemen persediaan produksi dari berbagai komponen yang diperlukan untuk membuat suatu produk akhir. Tujuan utama dari metode ini adalah mengatasi kekurangan bahan baku sehingga produksi dapat berjalan lancar. Sebelum kita menerapkan metode Material Requirement Planning, terlebih dahulu dilakukan pengeplotan dan peramalan data permintaan 5 bulan mendatang. Dari Hasil perhitungan peramalan menggunakan software minitab didapat perhitungan MAPE yang terkecil untuk Raket Bulutangkis yaitu dengan menggunakan metode Single Exponential smoothing Dari pengolahan data diperoleh hasil penghematan biaya dengan metode Fixed Period

Requirement (FPR), akan dibandingkan dengan perencanaan pemesanan bahan baku sebelum menggunakan metode usulan yaitu menggunakan Lot For Lot. Dari hasil pengolahan data diperoleh penghematan biaya metode Lot For Lot Rp. 3,200,000 dan dengan metode Fixed Period Requirement (FPR) Rp. 1,600,000,- atau prosentase penghematannya sebesar 50 %.

ROTAX racket manufacture was a manufacture industry produced badminton racket with continuous production. The problem faced by the company was lack of raw-material stock and various material needed, so that it needed good material needs procurement.

From the condition, there needed a method to overcome the problem. Material Requirement Planning is one of the technique discuss raw material plan by using information about demand depend for production stock management from various components need to make an ended-product. The main purpose of the method was to overcome the raw-material requirement to make more fluid production. Before we apply Material Requirement Planning method, we should do plotting and data forecasting of next 5 months. From the forecasting calculation using minitab software, there found smallest MAPE for badminton racket, by using Single Exponential Smoothing method.

(2)

Referensi

Dokumen terkait

Penulis melakukan analisa produk yang lebih banyak diproduksi dalam perusahaan tersebut dengan menggunakan klasifikasi ABC, kemudian melakukan peramalan terhadap data hisotri

Tujuan yang ingin dicapai dalam penelitian ini adalah untuk mengetahui perbandingan biaya persediaan bahan baku rajungan menggunakan metode perusahaan dengan metode

Master Production Schedule (MPS) dan Material Requirement Planning (MRP) Dimana MPS merupakan suatu ringkasan penjadwalan produksi untuk priode pada produk jadi yang akan

Perencanaan kebutuhan baku dilakukan dengan menentukan jumlah bahan baku yang diperlukan dalam proses produksi masih sederhana dan hanya perkiraan serta sangat

tujuan dari penelitian ini adalah untuk melakukan peramalan permintaan produk original pizza super supreme yang berukuran reguler dengan menggunakan metode

39 menggunakan bahan penolong atau bahan obat berupa campuran dari bermacam-macam bahan kimia. Mesin yang digunakan untuk memproses benang lusi yang dimasukkan ke

Adapun untuk perencanaan persediaan material box panel tersebut memerlukan peramalan yang optimal dengan memafaatkan metode Simple Moving Average (SMA) dan Single

Metode Period Order Quantity POQ POQ = EOQ/D Ringkasan perhitungan dari rencana untuk tiga bulan yang akan datang dalam kebutuhan komponen kayu pembentuk lemari dalam unit setiap