OPTIMASI LEBAR BANGUNAN PELIMPAH (SPILLWY) DAN

TINGGIBENDUNGAN PADA BENDUNGAN BULIA DI

KABUPATENGORONTALO

Oleh: SAJIMANSYAH ( 00520122 ) Civil Engineering

Dibuat: 2007-09-28 , dengan 3 file(s).

Keywords: Optimasi, Spillway, Tubuh Bendungan, Ekonomis

ABSTRAKSI

Bendungan bulia pada propinsi Gorontalo ini merupakan bendungan dengan type urugan yang mana bendungan type ini sangat lemah terhadap limpasan. Guna menghindari hal tersebut, maka bendungan type urugan ini harus dilengkapai bangunan pelimpah yang digunakan untuk

pelimpah debit banjir dan pemecahan kenaikan elevasi muka air yang mungkin dapat mengakibatkan limpasan-limpasan diatas mercu bendungannya, Berdasarkan petunjuk perencanaan teknis bangunan pelimpah dan tinggi bendungan dapat berfungsi secara efektif sebagai penampung dan menaikkan tinggi muka air, maka kajian ini dirumuskan Berapa besar Debit bajir rencana kala ulang 1000 tahun (Q1000) dan Debit bajir maksimum (QPMF), Berapa besar lebar optimum bangunan pelimpah ditinjau dari aspek ekonomi dan Berapa besar tinggi efektif bendungan optimum ditinjau dari aspek ekonomi dengan 5 alternatif lebar pelimpah yaitu 18, 22, 26, 30 dan 35 m.

Dari hasil analisa data hidrologi didapatkan Q1000 adalah 134.075 m3/dt. Adapun data teknis bendungan sebagai dasar perhitungan biaya adalah tinggi HWL + 127.88, tinggi NWL + 126.00, dan tinggi LWL + 116.00, dan tinggi mercu bendung adalah pada elevasi + 131.00. Sedangkan untuk saluran pelimpah direncanakan dengan lebar 25 meter pada elevasi 126.00.

Dari hasil analisa optimasi didapat lebar optimm yaitu dengan lebar pelimpah 35 m biaya Rp. 11.599.255.011,23 sedangkan untuk tinggi tubuh bendungan yang dibutuhkan untuk lebar pelimpah 35 meter adalah 23 m dengan biaya Rp. 18.602.548,562.09

Abstract

Dam bulia in Gorontalo province is a dam with type urugan which type dam is very weak against runoff. To avoid this, the dam of this type should dilengkapai urugan the overflow structure that is used for solving the overflow discharge and increased flood water surface elevation that may result in runoff-runoff dam above the tree top, Under the guidance of technical planning and building height dam overflow can function effectively as a container and raise the water level, then this study formulated a plan How much discharge flood back 1000 years time (Q1000) and the maximum flood discharge (QPMF), How big is the optimum width of the overflow building as viewed from the economic and effective dam height How big is the optimum review from the economy with 5 alternative overflow width is 18, 22, 26, 30 and 35 m.

(2)

as the basis for the calculation of cost containment is high HWL + 127.88, high NWL + 126.00, and high LWL + 116.00, and the high tree top weir is at elevation + 131.00. As for the overflow channel is planned with a width of 25 meters at an elevation of 126.00.

From the analysis of optimization obtained optimm wide by 35 m wide overflow costs Rp.

Referensi

Dokumen terkait

Hasil analisa hidrologi didapat debit outflow Q100 sebesar 92.616 m3/dt, sedangkan hasil analisa hidrolika didapat debit yang melewati bangunan pelimpah untuk Q100 sebesar

Pada saat debit kecil melintasi bangunan pelimpah dan aliran yang melintasi saluran peluncur tidak cukup cepat, sehingga tidak terjadi loncatan pada ujung hilir peredam energi,

Spilway atau disebut dengan pelimpah merupakan bangunan air beserta instalasinya yangberfungsi untuk mengalirkan debit banjir yang masuk kedalam waduk agar tidak membahayakan

Dengan kapasitas saluran yang tetap ( tidak ada perubahan dari kondisi eksisting ) maka penambahan debit limpasan permukaan akan mengakibatkan kenaikan elevasi muka

Data pengujian lengkung debit di hulu Bendungan Cibeet menghasilkan data kapasitas pelimpahan waduk yang mampu mengalirkan debit banjir PMF dengan kondisi aliran baik

Penelitian ini bertujuan untuk merencanakan dan menghitung deimensi serta menganalisis stabilitas bangunan pelimpah (spillway) pada Bendungan Ponre-Ponre Kabupaten Bone

 Ambang pelimpah aman terhadap daya dukung tanah dan gaya guling, sedangkan untuk gaya geser, dan eksentrisitas pada keadaan penuh kondisi gempa dan banjir Q PMF

Sebelum aliran air yang melintasi bangunan pelimpah dikembalikan lagi kedalam sungai, maka aliran dengan kecepatan yang tinggi dalam kondisi super kritis harus