Minescape Reserving and

Scheduling Manual

1.

Minescape Open Cut Coal

1.1. Minescape blocking

1.2. Projection solid with batter slope for reserves calculation 1.3. Projection solid

1.4. Reserves calculation

2.

Excel or CSV Database

2.1. Create reserves database in Excel or CSV file 2.2. Create polygon database in Excel or CSV file 2.3. Scheduling

(2)

Minescape Open Cut Coal

1.1. Minescape blocking

1. Buatlah poligon pit shell (batas-batas pit).  Open write design file blocks.

 Create layer untuk rancangan pit baru: Pit00

Klik kanan Click

Click Click

(3)

Page 3 of 37 Created by Fajar Herdian Akhzan

 Attach design file subcrop lapisan batubara: subcrp_floor_update, layer SEAM1. Click

Click

(4)

 Untuk latihan, buatlah poligon pit shell pada daerah subcrop seam 1 dengan ukuran kira-kira 3×2 km.

(5)

Page 5 of 37 Created by Fajar Herdian Akhzan

Tekan Ctrl+G untuk memunculkan grid.

Grid akan berguna sebagai alat bantu dalam menentukan ukuran pit shell.

(6)

2. Berikan tag design segment pada pit shell dengan memilih menu Strip Design>Tag Design Segments…

3. Buat side definition dengan mengklik kanan bagian Side Definition lalu pilih Create,,,. ±2 km

±3 km

Click

Klik kanan

(7)

Page 7 of 37 Created by Fajar Herdian Akhzan

Contoh beberapa Side Definition: Side Definitions:

HW63 Angles

If (label == „coal‟) then 70

else 63 endif Offset

If range(level, totroof+3, topo-1) then if range(level,-29.5,-30.5) then 5

elseif range(level,-9.5,-10.5) then 10

elseif range(level, 10.5,9.5) then 5

elseif range(level,30.5,29.5) then 10

elseif range(level,50.5,49.5) then 5

elseif range(level,70.5,69.5) then 10 else 0 endif else 0 endif ILLEG_HW Angles 70 Offset 0 VERTICAL Angles 90 Offset 0

(8)

Kemudian double click pit shell. Click

(9)

Page 9 of 37 Created by Fajar Herdian Akhzan

4. Buatlah tiga layer baru, yaitu untuk batter block (BB), batter block intersection

(BB_Intersect) dan solid (BB_Solid).

Lalu buat start line dan end line-nya. Klik kanan

Click

Click

Click

(10)

5. Buka menu Strip Design>Generate Strips…

Start line (garis dekat

subcrop)

End line Pit shell

(11)

Page 11 of 37 Created by Fajar Herdian Akhzan

6. Buat batter strip dengan cara yang sama tetapi dengan start line parallel terhadap highwall

dan dengan interior strips = vertikal.

Start line

(12)
(13)

Page 13 of 37 Created by Fajar Herdian Akhzan

7. Buatlah perpotongan antar strip dengan block strip dengan memilih menu Strip Design>Strip Intersection…

Sembunyikan semua layer kecuali layer BB_intersect. Click

(14)

Click

Click

(15)

Page 15 of 37 Created by Fajar Herdian Akhzan

8. Gabungkan batter block yang berukuran kecil dengan batter block lain yang berada di dekatnya. Buka Minescape Explorer, User Commands – bbmerge.

Pilih batter block yang pertama. Double click

(16)

Pilih batter block yang ke-dua.

Masukkan nama batter block yang telah dimerger (pilih nama batter block pertama). Double click

(17)

Page 17 of 37 Created by Fajar Herdian Akhzan

Hapus batter block ke-dua.

(18)

1.2. Projection Solid with Batter Slope for Reserves Calculation

1. Buka menu Strip Design>Project Solids…

2. Masukkan nama batter block dalam kolom Block Names. 3. Masukkan nama layer BB_Solid.

4. Buatlah atau sunting pit projection rules dengan meng-klik kanan bagian Pit Projection Rules. Projection rule harus dibuat sesuai hasil kajian kestabilan lereng.

(19)

Page 19 of 37 Created by Fajar Herdian Akhzan

(20)
(21)

Page 21 of 37 Created by Fajar Herdian Akhzan

1.4. Reserves calculation

(22)
(23)

Page 23 of 37 Created by Fajar Herdian Akhzan

2. Pilih menu Reserves>Evaluate Samples>Mining Reserves…

Click

(24)

PT. BHAKTI ENERGI PERSADA MineScape Training 3. Pilih menu Reserves>Accumulate Samples…

4. Pilih menu Reserves>Reformat Samples>Block…

Click

Click

Click

(25)

Page 25 of 37 Created by Fajar Herdian Akhzan

(26)
(27)

Page 27 of 37 Created by Fajar Herdian Akhzan

Excel or CSV Database

2.1. Create reserves database in Excel or CSV file

1. Ekspor file tab_ressol4 ke dalam format Excel.

1-Click 2-Click

(28)
(29)

Page 29 of 37 Created by Fajar Herdian Akhzan

2.2. Create polygon database in Excel or CSV file

1. Buka file xls_ressol4.

2. Buat dua kolom baru, yaitu kolom OB dan COAL.

(30)

3. Buat pivot table dari semua data tersebut.  Pilih semua cell (tekan Ctrl+A)

 Pilih menu Insert>PivotTabel.

(31)

Page 31 of 37 Created by Fajar Herdian Akhzan

Click

Drag

(32)

Drag

Drag “Values”

(33)

Page 33 of 37 Created by Fajar Herdian Akhzan

 Urutkan kolom A mulai dari level yang paling tinggi (misal: P90, P80, P70, …, P00, M10, M20, dst.).

5. Untuk mempermudah penyuntingan, pivot table harus di-copy ke sheet lain  Pilih semua cell (tekan Ctrl+A)

(34)

 Copy semua cell (tekan Ctrl+C).

(35)

Page 35 of 37 Created by Fajar Herdian Akhzan

 Hapus baris-baris yang kosong yang menjadi pemisah antar level (misal antara P90 dengan P80)

 Lakukan formatting seperlunya (lihat gambar berikut). Click

(36)

Lantai batubara (hitam)

Permukaan topografi (hijau)

(37)

Page 37 of 37 Created by Fajar Herdian Akhzan

 Nama tiap solid menunjukkan lokasi blok penambangan.