ALGIERS REFINERY

REHABILITATION AND ADAPTATION PROJECT

CONSTRUCTION STANDARDS SITE ARRANGEMENT – UNDERGROUND PIPING

Document Class :

CLASS:1

Project N° - Unit Doc Type Material Code Serial Number Rev. Page

9952T-000 STC 1490 0001 7 1/7

Pages modified under this revision:

STC 0022 Sheet 2 to 4 , STC 0048 Sheet 1 and 2 , New STC 0049 , STC 0059 , STC 0062 Sheet :1

New STC 0062 Sheet: 2 , STC 0073, STC 074,

7 09/MAR/14 IFC-ISSUE FOR CONSTRUCTION S.KABECHE O.BOUSSAID M.IDIRI

6 28/JAN/14 IFC-ISSUE FOR CONSTRUCTION S.KABECHE O.BOUSSAID M.IDIRI

5 25/DEC/13 IFC-ISSUE FOR CONSTRUCTION S.KABECHE A.DJELOUAH M.IDIRI

4 03/JUN/13 IFC-ISSUE FOR CONSTRUCTION S.GUENNEGAN M.LONG F.OUDJHARA 3 21/MAY/13 IFC-ISSUE FOR CONSTRUCTION S.GUENNEGAN M.LONG F.OUDJHARA

2 25/FEB/13 IFC-ISSUE FOR CONSTRUCTION O.BOUSSAID S.KABECHE M. IDIRI 1 21/NOV/12 IFC-ISSUE FOR CONSTRUCTION B.VEZMAR C.VENARD C.VENARD

0 05/MAY/12 IFC-ISSUE FOR CONSTRUCTION B.VEZMAR C.VENARD C.VENARD B 11/AUG/11 IFA-ISSUE FOR APPROVAL B.VEZMAR C.VENARD C.VENARD A 08/FEB/11 IFA-ISSUE FOR APPROVAL M-SAMER C-VENARD M-IDIRI

Rev Date DD/MMM/YY

STATUS WRITTEN BY

(name & visa)

Sections changed in last revision are identified by a vertical line in the margin

PP 1 - ANG - rev. 2

CONSTRUCTION STANDARDS

SITE ARRANGEMENT – UNDERGROUND PIPING

(2)

ALGIERS REFINERY

REHABILITATION AND ADAPTATION PROJECT

CONSTRUCTION STANDARDS SITE ARRANGEMENT – UNDERGROUND PIPING

Document Class :

CLASS:1

Project N° - Unit Doc Type Material Code Serial Number Rev. Page

9952T-000 STC 1490 0001 7 2/7

PP 1 - ANG - rev. 2

CONSTRUCTION STANDARDS – SITE ARRANGEMENT – UNDERGROUND PIPING

Serial n° Description Rev. Date

Manhole with or without submerged connection 2 18/FEB/13 7

A 08/FEB/11 4

0012 OILY WATER AND CONTAMINATED RAIN WATER B 11/AUG/11 5 0 05/MAY/12 6

SYSTEM SY & HY ( Ø > 20” ) 1 30/OCT/12 7 Fire Trap Double compartment Manhole 2 18/FEB/13 8

A 08/FEB/11 3 25/DEC/13 22°30 Submerged Connection - Steel system 0 05/MAY/12 6

(3)

ALGIERS REFINERY

REHABILITATION AND ADAPTATION PROJECT

CONSTRUCTION STANDARDS SITE ARRANGEMENT – UNDERGROUND PIPING

Document Class :

CLASS:1

Project N° - Unit Doc Type Material Code Serial Number Rev. Page

9952T-000 STC 1490 0001 7 3/7

Ordinary Manhole outside traffic area 0 05/MAY/12 5

1 21/NOV/12 6

Catch basin for half concrete Pipe channel SHEET 2/4 1 30/OCT/12 6

2 18/FEB/13 7

3 25/DEC/13 8

4 09/MAR/14 9

STORM WATER SYSTEM (WY) 0 05/MAY/12 5 25/DEC/13 Catch basin for half concrete Pipe channel SHEET 3/4 1 21/NOV/12 6 09/MAR/14

2 18/FEB/13 7

3 05/MAY/13 8

4 03/JUN/13 9

STORM WATER SYSTEM (WY) 0 25/DEC/13 5

Catch basin for half concrete Pipe channel SHEET 4/4 1 09/MAR/14 6

(4)

ALGIERS REFINERY

REHABILITATION AND ADAPTATION PROJECT

CONSTRUCTION STANDARDS SITE ARRANGEMENT – UNDERGROUND PIPING

Document Class :

CLASS:1

Project N° - Unit Doc Type Material Code Serial Number Rev. Page

9952T-000 STC 1490 0001 7 4/7

Desander for Standards ditches 0 05/MAY/12 6

(5)

ALGIERS REFINERY

REHABILITATION AND ADAPTATION PROJECT

CONSTRUCTION STANDARDS SITE ARRANGEMENT – UNDERGROUND PIPING

Document Class :

CLASS:1

Project N° - Unit Doc Type Material Code Serial Number Rev. Page

(6)

ALGIERS REFINERY

REHABILITATION AND ADAPTATION PROJECT

CONSTRUCTION STANDARDS SITE ARRANGEMENT – UNDERGROUND PIPING

Document Class :

CLASS:1

Project N° - Unit Doc Type Material Code Serial Number Rev. Page

9952T-000 STC 1490 0001 7 6/7

Safety Shower – Eyewash typical installation 0 05/MAY/12 5

1 21/NOV/12 6 For Electrical or Instrumentation Cables 0 05/MAY/12 5

1 21/NOV/12 6

2 7

A 08/FEB/11 3

0061 CONDUITS UNDER PIPE-WAYS B 11/AUG/11 4 For Electrical or Instrumentation Cables 0 05/MAY/12 5

1 25/DEC/13 6

2 7

A 08/FEB/11 3 03/JUN/13

0062 ELECTRICAL OR INSTRUMENTATION B 11/AUG/11 4 25/DEC/13

Concrete cable trench in paved area Sheet :1 0 05/MAY/12 5 09/MAR/14 1 21/NOV/12 6

2 19/FEB/13 7

0 09/MAR/14 3

0062 ELECTRICAL OR INSTRUMENTATION

Precast Concrete cable trench in paved area Sheet: 2

A 08/FEB/11 3

0064 ELECTRICAL OR INSTRUMENTATION 0 20/APR/12 5

(7)

ALGIERS REFINERY

REHABILITATION AND ADAPTATION PROJECT

CONSTRUCTION STANDARDS SITE ARRANGEMENT – UNDERGROUND PIPING

Document Class :

CLASS:1

Project N° - Unit Doc Type Material Code Serial Number Rev. Page

9952T-000 STC 1490 0001 7 7/7

PP 1 - ANG - rev. 2

2 7

3 8

A 4

0065 -INSTRUMENTATION OPTIC FIBER TRENCH 0 05/MAY/12 5

Typical section and crossing 1 21/NOV/12 6

(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
(17)
(18)
(19)
(20)
(21)
(22)
(23)
(24)
(25)
(26)
(27)
(28)
(29)
(30)
(31)
(32)
(33)
(34)
(35)
(36)
(37)
(38)
(39)
(40)
(41)
(42)
(43)
(44)
(45)
(46)
(47)
(48)
(49)
(50)
(51)
(52)
(53)

Referensi

Dokumen terkait

According to experts, several printer companies secretly encode the serial number and the manufacturing code of their colour laser printers and colour copiers on every document

PHILIPPINE HEART CENTER INSTITUTIONAL ETHICS REVIEW BOARD Document Type Document Code: POL-E-IRB-011 POLICY/STANDARD OPERATING PROCEDURE Effective Date: December 2020

Tool type Number of Countries Number of Developed Tools Developing economy Developed economy Developing economy Developed economy Official Tool 4 11 4 12 Academic Tool 5 3 10 4

The work areas and types of Tax Return processed by Tax Data and Document Processing Center in 2019 are as follows: Unit Work Number of Regional Tax Offices Work Type of Tax Return